Proceedings of the Korean Operations and Management Science Society Conference
/
2000.04a
/
pp.437-440
/
2000
본 연구에서는 제품 개발과 관련된 시장 환경 요소들을 고려하여 신속한 제품 개발에 관한 의사 결정을 할 수 있는 AHP 모형을 제안하고, 정량화 된 데이터를 이용한 AHP 의사결정 프로세스를 구축하고자 하였다. AHP 모형의 경우 전문가 집단(연구원 집단, 엔지니어 집단, 판매자 집단)별로 의사결정의 차이점을 보여 줌으로서 각각의 시장 상황에 맞는 의사결정을 경영자가 효율적으로 판단할 수 있도록 제시하였으며, 신제품 디자인 선정의 간단한 프로세스를 제시하여 반복적인 생산자의 의사 결정을 합리적이고 신속하게 할 수 있는 방법론을 제시하였다. 프로세스에서는 하위 의사결정 단계에서 가능한 데이터의 정량화를 통해 쌍별 비교 행렬을 만듦으로써, AMP기법의 정확성을 높이고 모델의 민감도 분석이 가능하게 하였다.
Journal of the Korea institute for structural maintenance and inspection
/
v.22
no.1
/
pp.32-39
/
2018
Repairing timing and the extended service life with repairing are very important for cost estimation during operation. Conventionally used model for repair cost shows a step-shaped cost elevation without consideration of variability of extended service life due to repairing. In the work, RC(Reinforced Concrete) Column is considered for probabilistic evaluation of repairing number and cost. Two mix proportions are prepared and chloride behavior is evaluated with quantitative exterior conditions. The repairing frequency and cost are investigated with varying service life and the extended service life with repairing which were derived from the chloride behavior analysis. The effect of COV(Coefficient of Variation) on repairing frequency is small but the 1st repairing timing is shown to be major parameter. The probabilistic model for repairing cost is capable of reducing the number of repairing with changing the intended service life unlike deterministic model of repairing cost since it can provide continuous repair cost with time.
Proceedings of the Korean Institute of Intelligent Systems Conference
/
2002.12a
/
pp.106-111
/
2002
진화 알고리즘은 생물의 유전적 진화 과정을 이용한 새로운 문제 해결의 방안으로 결정론적 방법으로 해결하지 못한 난제에 적합한 알고리즘으로 알려져 있다. 본 논문에서는 진화 알고리즘의 연구를 기반으로 전달함수 출력 파형 검출을 위한 기법에서 이용되고 있는 런지-커타(Runge-Kutta) 방법에서의 상미분 방정식의 해를 구하는 기법 연구와 유전 알고리즘을 이용하여 Manabe 표준형의 일반화를 이용-i:l여 플랜트의 성능을 충족시키는 제어기를 설계할 수 있는 알고리즘을 구현한다. 본 논문에서의 프로그램 구현은 자바 언어를 이용하며, 자바 언어를 적용한 구현 방법과 유전 알고리즘의 효율적 기법을 제시한다.
Korean Journal of Construction Engineering and Management
/
v.6
no.4
s.26
/
pp.80-90
/
2005
Activity durations retain probabilistic and stochastic natures due to diverse factors causing the delay or acceleration of activity completion. These natures make the final project duration to be a random variable. These factors are the major source of financial risk. Extending the Stochastic Project Scheduling Simulation system (SPSS) developed in previous research; this research presents a method to estimate how the final project duration behaves when activity durations change randomly. The final project cost is estimated by considering the fluctuation of indirect cost, which occurs due to the delay or acceleration of activity completion, along with direct cost assigned to an activity. The final project cost is estimated by considering how indirect cost behaves when activity duration change. The method quantifies the amount of contingency to cover the expected delay of project delivery. It is based on the quantitative analysis to obtain the descriptive statistics from the simulation outputs (final project durations). Existing deterministic scheduling method apply an arbitrary figures to the amount of delay contingency with uncertainty. However, the stochastic method developed in this research allows computing the amount of delay contingency with certainty and certain degree of confidence. An example project is used to illustrate the quantitative analysis method using simulation. When the statistical location and shape of probability distribution functions defining activity durations change, how the final project duration and cost behave are ascertained using automated sensitivity analysis method
Journal of the Institute of Electronics Engineers of Korea SD
/
v.42
no.12
/
pp.79-90
/
2005
In this paper, we propose a new clustered reconfigurable interconnect network (CRIN) BIST to improve the embedding probabilities of random-pattern-resistant-patterns. The proposed method uses a scan-cell reordering technique based on the signal probabilities of given test cubes and specific hardware blocks that increases the embedding probabilities of care bit clustered scan chain test cubes. We have developed a simulated annealing based algorithm that maximizes the embedding probabilities of scan chain test cubes to reorder scan cells, and an iterative algorithm for synthesizing the CRIN hardware. Experimental results demonstrate that the proposed CRIN BIST technique achieves complete fault coverage with lower storage requirement and shorter testing time in comparison with the conventional methods.
Proceedings of the Korean Information Science Society Conference
/
2003.10a
/
pp.40-42
/
2003
주어진 실시간 환경의 복잡성 때문에. 항상 최적의 행동을 수행하는 완벽하게 이성적인 에이전트 (rational agent) 의 구현은 실질적으로 가능하지 않다. 이러한 실시간 문제 해결기법에서의 전통적인 접근 방식은 미리 정의된 규약에 의존한 조건-행동 추론 방식이다. 이러한 조건-행동추론 방식은 문제 영역이 다양하거나 문제의 재설계가 필요한 경우에는 아무런 해법을 갖지 못한다. 따라서 이러한 문제점을 해결하기 위해 본 논문에서는 주어진 행동들의 유틸리티를 실시간에 계산하고, 긴급한 정도를 측정하여 상황이 긴급할 경우에는 더 이상의 계산을 중단하고 즉각적인 행동을 취하며. 반면에 상황이 긴급하지 않을 경우에는 최선의 의사결정을 위하여 추가적인 정보를 고려하여 더 바람직한 행동을 결정하는 방법론을 제안한다. 제안한 방법론의 평가를 위하여 시간 제약적인 환경에서 최선의 의사결정을 수행하는 실질적이며 유연한 에이전트를 구현 하고자 한다.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.13
no.1
/
pp.15-25
/
2014
Bus signal priority is a name for various techniques to speed up bus public transport services at intersections with traffic signals. In this study propose methodology to optimize signal times for Early green, Green extension out of the active bus signal priority using deterministic delay model in isolated intersection on median bus lane. Fluctuation is found in the vehicle delay and person delay in the event that using this methodology redistributed to green time and checking slack green time is correct value by sensitivity analysis. As a result of the study, car delay is increased a little and person delay is decreased. As a result of slack green time sensitivity, delay is not much in it if variation of slack green time under 30%. But this methodology effectiveness is under claimed capacity if variation of slack green time over 30%.
Interests in clean fuels have been soaring because of environmental problems such as air pollution and global warming. Unlike fossil fuels, hydrogen obtains public attention as a eco-friendly energy source because it releases only water when burned. Various policy efforts have been made to establish a hydrogen based transportation network. The station that supplies hydrogen to hydrogen-powered trucks is essential for building the hydrogen based logistics system. Thus, determining the optimal location of refueling stations is an important topic in the network. Although previous studies have mostly applied optimization based methodologies, this paper adopts machine learning to review spatial attributes of candidate locations in selecting the optimal position of the refueling stations. Machine learning shows outstanding performance in various fields. However, it has not yet applied to an optimal location selection problem of hydrogen refueling stations. Therefore, several machine learning models are applied and compared in performance by setting variables relevant to the location of highway rest areas and random points on a highway. The results show that Random Forest model is superior in terms of F1-score. We believe that this work can be a starting point to utilize machine learning based methods as the preliminary review for the optimal sites of the stations before the optimization applies.
Proceedings of the Korea Society for Simulation Conference
/
2000.04a
/
pp.45-50
/
2000
실시간 시뮬레이션은 제약조건이 있는 시뮬레이션의 대표적인 경우로, 반드시 주어진 시간안에 최상의 시뮬레이션 결과를 생성해내야 한다. 본 논문에서는 시간제약과 같은 시스템에 주어진 제약조건을 모델링 및 시뮬레이션하기 위한 방법론을 제시한다. 시스템의 모델링 과정에서는 계층적 방법론에 기초하여 다중 추상화(multi-resolution)를 제공하는 모델을 만든다. 또한 제약조건이 있는 시뮬레이션을 위해서는 구축된 모델의 추상화수준을 조절한다. 즉, 1) 구축된 모델을 추상화 수준에 따라 정리하여 AT(Abstraction Tree)를 생성한 후 2) 주어진 제약조건을 integer programming 기법을 이용하여 정형화하고, 3) 제약조건을 만족시키는 최상의 추상화 수준을 AT상에서 결정한다. 결정된 추상화 수준에 따라 시뮬레이션에 필요한 모델을 동적으로 재구성하여 임의의 제약조건이 있는 시뮬레이션을 효과적으로 수행함으로써, 모델의 재사용 및 경제성을 증진시킬 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.