Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Develop User Friendly Website for Computer Estimate (사용자 친화적인 컴퓨터 견적 생성 웹 사이트 개발)

  • Cho Kyu Cheol;Lee Jae Yun
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2023.07a
    • /
    • pp.409-412
    • /
    • 2023
  • 검색을 통해 찾은 컴퓨터 부품의 정보(가격, 호환 여부, 성능) 등을 자동으로 체크 해주고 이를 통해 만든 컴퓨터 견적을 여러 사람과 공유 및 열람을 할 수 있고 대화창과 같은 게시판을 통해 서로의 지식과 정보를 쉽게 공유할 수 있는 웹 사이트를 개발하였다. 이 사이트가 사용자들의 합리적인 소비로 이어지기를 기대한다.

  • PDF

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Study on the Application of Cost Risk Exposure methods by the Probabilistic Evaluation on the Construction Projects (확률적 평가에 의한 건설공사 비용 위험도 측정의 적용성에 관한 연구)

  • Cho Jea-Ho;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.63-71
    • /
    • 2000
  • The paper considers two non-deterministic methods of analysing the risk exposure in a cost estimate The fist method(referred to as the 'conventional statistical' method) analyses cost data directly, to describe a probability distribution for total cost. The second method(referred to as the 'Monte Carlo simulation' method) interprets cost data directly, to generate a probability distribution for total costs from the descriptions of elemental cost distribution. The common practice of allowing for risk through an all-embracing contingency sum or percentage addition is challenged. Rather than excluding conventional, non-deterministic methods, they are here presented as possibly the only of effective foundation on which to risk management in cost estimating.

  • PDF

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

Design and Implementation of ConiForm for the Construction Management of Structures (골조공사 관리시스템 ConiForm의 설계와 구현)

  • Lee, Joon-Seok;Kim, Hyeon-Jeong;Kim, Chee-Kyeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.101-104
    • /
    • 2010
  • 본 논문에서는 구조설계, 철근배근시공도 작성, 골조 물량 산출, 3D BIM 모델 생성 등 기존에 독립된 업무로 수행되던 골조공사 관련 엔지니어링 업무를 통합 수행하는 골조공사 관리시스템 ConiForm을 개발하여 2차원 CAD로부터 3D 골조모델 생성하고, 3D 모델로부터 철근의 이음/정착/철근길이 등을 반영한 철근배근시공도 및 가공도 작성과 골조물량을 산출하여, 3D BIM 도구와의 연동함으로써 정밀 물량 및 견적을 자동 산출하고 건축모델과 구조모델 간 정보공유 및 통합 BIM 실현 등을 제시하고자한다.

  • PDF

Automatic Inference of Standard BOQ(Bill of Quantities) Items using BIM and Ontology (BIM과 온톨로지를 활용한 표준내역항목 추론 자동화)

  • Lee, Seul-Ki;Kim, Ka-Ram;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.99-108
    • /
    • 2012
  • The rough design information is only available from BIM(Building Information Model) based schematic design. So, it is difficult to obtain sufficient information for generating BOQ. Like 2D design, there are some problems that the results are depend on what the choice of cost estimator. However, the most research of BIM based cost estimation are focus on quantity takeoff, the consideration of work item for generating BOQ is insufficient. Therefore, this paper present automatic inference process of work items in a BOQ using ontology. The proposed process and ontology is validated through applying tiling construction. If the proposed process is utilized, it is expected the basis of developing generation method for consistent BOQ by resolving intervention of cost estimator's arbitrary decision.