• 제목/요약/키워드: 견적변경

검색결과 19건 처리시간 0.025초

Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • 제7권4호
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

The Study of Cost Estimation Model for Software Maintenance (소프트웨어 유지보수 견적모델 구현 사례 연구)

  • Park, Joon-Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 한국정보처리학회 2010년도 춘계학술발표대회
    • /
    • pp.911-914
    • /
    • 2010
  • 대법원 등기업무시스템의 유지보수시 적용된 CSR(Court Service Request)견적모델의 구축 사례에 대한 연구를 통하여 소프트웨어 유지보수시 변경된 모듈뿐만 아니라 모듈 이외의 작업에 소요된 공수 그리고 시스템 특징과 유지보수 절차를 고려한 비용산정 모델을 제시하고자 한다.

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제16권6호
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.

Cost Scaling Factor according to Power Plant Capacity Change (발전소 용량변경에 따른 비용보정계수)

  • Ha, Gak-Hyeon;Kim, Sung-Hwan
    • Journal of Energy Engineering
    • /
    • 제22권3호
    • /
    • pp.283-286
    • /
    • 2013
  • The existing nuclear power plants have been often redesigned by increasing or decreasing electrical power without changing design concept by the request of utility, economic factors or other factors. When the cost of power plant equipment redesigned by changing reactor power and electrical power is estimated, if its quotation is not available in the market place, cost scaling factor(CSF) applies to the cost of existing plant equipment and then the new-designed equipment cost can be calculated. In this paper, we review CSFs according to plant capacity change cases in United State DOE, EPRI, ABB, SWEC and introduce the results applied to Korean PWR 1000MWe and 1400MWe.

해외건설공사 수행절차(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • 제8호통권217호
    • /
    • pp.64-67
    • /
    • 2008
  • 해외공사는 주로 해외지점망, 외국설계회사, 발주자 또는 기존 현장을 통해 입수한 공사정보(공사비 및 공사개요, 재원, 발주자, 설계회사, 입찰일정 등)를 토대로 입찰참여 여부를 결정하며, 입찰 자격심사(PQ : Pre-qualification)를 거쳐, 입찰서를 발급받아 견적서를 작성하고 입찰에 임하게 된다. 입찰, 수주활동을 하는 동안 주요사항을 국토해양부 및 해외건설협회에 단계별로 소정의 양식에 의거 보고한다. 주요보고사항 $\Delta$ 수주활동상황보고(입찰예정일 10일 전까지) $\Delta$ 계약체결결과보고(계약체결 15일 이내) $\Delta$ 시공상황보고(매분기 종료후 30일 이내) $\Delta$ 공사내용변경보고(변경 15일 이내) $\Delta$ 준공보고(준공증명서 발급 15일 이내)

  • PDF

A review of using Function Point for the successful project (성공적인 프로젝트 수행을 위한 FP의 활용방안 검토)

  • Hwang, In-Soo;Oh, Eun-Sung;Kim, Heung-Shik
    • 한국IT서비스학회:학술대회논문집
    • /
    • 한국IT서비스학회 2002년도 창립기념 학술대회
    • /
    • pp.165-172
    • /
    • 2002
  • 전통적으로 소프트웨어 프로젝트는 납기지연, 예산초과, 높은 결함율 등으로 타 산업분야의 프로젝트에 비해 매우 높은 실패율을 기록하고 있는 것으로 알려져 있다. 이 같은 소프트웨어 프로젝트의 실패원인에 대한 많은 연구결과는 소프트웨어가 갖고 있는 범위와 요구사항 정의의 어려움, 비가시성으로 인한 초기견적의 부정확성, 역시 가시성의 부족으로 진행상황파악의 어려움에 따른 진척관리의 애로, 더욱 큰 문제는 변경의 용이성과 변경에 대한 추적의 어려움 등을 지적하고 있다. 실패한 프로젝트들의 내용을 보면 대부분 계획의 부정확성이나 위험에 대한 대처의 부족 또는 진행 중 발생하는 변경에 대한 통제의 실패에서 찾아 볼 수 있다. 정확한 예측과 위험 예방 그리고 효과적인 통제대책이 소프트웨어 프로젝트를 성공으로 이끄는 3두 마차라는 지적이다. 정확한 예측의 핵은 프로젝트 산출물인 제품에 대한 정확한 규모측정에 있고, 위험 예방은 복잡도가 높거나 불확실성이 높은 컴포넌트의 자원소요에 대한 예측과 이에 대한 준비의 소홀에서 찾을 수 있으며, 효과적인 통제대책은 프로젝트 관리 프레임워크가 튼튼하지 못하거나 이의 준수를 위한 노력의 결핍에서 찾을 수 있을 것이다. 본 논문에서는 이 3두 마차 중 가장 근간이 되고 시발점이 되는 제품의 규모에 대한 예측에 초점을 맞추어 규모측정에 가장 합리적이고 객관적이며 실용성이 높다고 현재 국제적으로 높은 평가를 받고 있는 기능점수를 프로젝트 관리에 어떻게 활용해야 프로젝트를 성공시킬 수 있을 지의 방법에 대한 검토 결과를 제시고자 한다.

  • PDF

A Comparison of Quantity Take-Offs of RC Structures based on BIM (BIM기반 철근콘크리트구조의 물량산출 비교)

  • Yoon, Jong Deok;Cho, Hyun Sik;Lee, Jae Hong;Shin, Jae Yong;Kim, Eun Suk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • 제33권1호
    • /
    • pp.35-44
    • /
    • 2020
  • In the construction industry, there is a growing demand for the accurate calculation of the quantity take-off and construction budget at the design stage, and it is likewise important to grasp changes in the construction budget and quantity take-off if design alterations are made. In addition, lawsuits related to the quantity take-off and cost of construction are frequent; therefore, the calculation of these factors using building information modeling (BIM) has emerged as an alternative. However, existing 2D-based methods are still used more frequently than BIM-based methods for quantity take-offs and construction budgets. This is because of the lack of BIM experience of estimation workers and the absence of a national standard. However, from a designer's point of view, it is necessary to understand the quantity take-off and construction cost based on BIM and accurately create the design according to the budget. In this study, the quantity take-offs of concrete, rebar, and reinforced concrete structures (apartments) in Seoul and Yeongjong were compared with the quantity take-offs based on 2D and BIM methods. From the viewpoint of the designer, we aim to increase the accuracy of BIM-based quantity take-offs.

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF