A Study on the Current Situations about the Use of Big Data for Cost Estimating Tasks in CM Companies (CM사 견적업무의 빅데이터 활용 현황에 관한 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.24-33
    • /
    • 2021
  • Cost management is a major function of CM (construction management) companies for clients and cost estimating is a critical task in that it provides a baseline for cost management and a foundation for decision making in construction projects. For this purpose, CM companies need to obtain and use good quality data, which leads to more accurate and efficient cost estimating. As the use of big data becomes increasingly important in the construction industry, researches related to the theme have become the active areas of studies. However, literature review shows that the current situations in relation to the use of big for cost estimating of CM companies are under-researched. The objective of the study is to identify key characteristics and implications in the use of big data for cost estimating of CM companies, which can contribute to develop strategies for such purposes.

A Study on the Strategy of the Use of Big Data for Cost Estimating in Construction Management Firms based on the SWOT Analysis (SWOT분석을 통한 CM사 견적업무 빅데이터 활용전략에 관한 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.54-64
    • /
    • 2022
  • Since the interest in big data is growing exponentially, various types of research and development in the field of big data have been conducted in the construction industry. Among various application areas, cost estimating can be a topic where the use of big data provides positive benefits. In order for firms to make efficient use of big data for estimating tasks, they need to establish a strategy based on the multifaceted analysis of internal and external environments. The objective of the study is to develop and propose a strategy of the use of big data for construction management(CM) firms' cost estimating tasks based on the SWOT analysis. Through the combined efforts of literature review, questionnaire survey, interviews and the SWOT analysis, the study suggests that CM firms need to maintain the current level of the receptive culture for the use of big data and expand incrementally information resources. It also proposes that they need to reinforce the weak areas including big data experts and practice infrastructure for improving the big data-based cost estimating.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Study of BIM based estimation Modeling data reliability improvement (BIM기반 견적 모델링 데이터 신뢰성 향상을 위한 연구)

  • Kim, Yeong-Jin;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.43-55
    • /
    • 2012
  • A methodology for BIM Quality Assurance in the construction industry is becoming increasingly an important issue to determine the reliability of BIM. However, the quality assurance of BIM is currently limited to check 3D models, such as clash detection and space layout while verification methods for disciplinary BIM results from structural engineering, mechanical engineering, and estimation do not exist yet. Particularly, in the BIM-based estimation mathematical equations to take off quantities are not clearly exposed so that the results are not quite accepted at practices. With the concept of reliability engineering defined in the manufacturing industry to improve reliability of outcomes of BIM-based quantity take-off, impacting factors that affect reliability of BIM-based quantity take-off were derived. It was found that the factors also include the modeling method and the features of a BIM tool. Therefore, this research aims to propose modeling and verification methods to improve reliability of BIM-based quantity take-off through the pilot test that was performed with commercial BIM tools and IFC-based BIM data.

A Study on the Application of Cost Risk Exposure methods by the Probabilistic Evaluation on the Construction Projects (확률적 평가에 의한 건설공사 비용 위험도 측정의 적용성에 관한 연구)

  • Cho Jea-Ho;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.63-71
    • /
    • 2000
  • The paper considers two non-deterministic methods of analysing the risk exposure in a cost estimate The fist method(referred to as the 'conventional statistical' method) analyses cost data directly, to describe a probability distribution for total cost. The second method(referred to as the 'Monte Carlo simulation' method) interprets cost data directly, to generate a probability distribution for total costs from the descriptions of elemental cost distribution. The common practice of allowing for risk through an all-embracing contingency sum or percentage addition is challenged. Rather than excluding conventional, non-deterministic methods, they are here presented as possibly the only of effective foundation on which to risk management in cost estimating.

  • PDF

Study on the estimate system for the plastic injection molds (2B상의 WEB형 플라스틱 사출금형 견적 산출시스템 연구)

  • Sung Choi;Geun Yu Jeoung;Chan Kim Seoung;Lan Han Jung
    • Proceedings of the KAIS Fall Conference
    • /
    • 2004.06a
    • /
    • pp.224-227
    • /
    • 2004
  • 본 연구는 플라스틱 사출 금형 견적 산출 전문가 시스템에 관한 내용이다. 일반적으로 경험에 의한 견적 산출은 프라스틱 사출 금형 제조 회사의 경험이 많은 엔지니어가 직접 작성하게 된다. 이렇게 되면, 시간은 많이 소요되지 않지만, 객관성과 과학성이 결여된 견적이 산출된다. 때때로, 고객과 제조회사 간의 분쟁이 발생하게 되는 원인이 되기도 한다. 이러한 문제를 극복하기 위해, 본 연구로 개발된 시스템이 대안이 될 것이다. 윈도우 환경의 Visual Basic과 SQL 데이터 베이스를 사용한다. 이 시스템에서 얻어진 결과는 제조 현장에서 설계들에게 효과적인 지침이 될 것이다.

  • PDF

Development of DL-MCS Hybrid Expert System for Automatic Estimation of Apartment Remodeling (공동주택 리모델링 자동견적을 위한 DL-MCS Hybrid Expert System 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.113-124
    • /
    • 2020
  • Social movements to improve the performance of buildings through remodeling of aging apartment houses are being captured. To this end, the remodeling construction cost analysis, structural analysis, and political institutional review have been conducted to suggest ways to activate the remodeling. However, although the method of analyzing construction cost for remodeling apartment houses is currently being proposed for research purposes, there are limitations in practical application possibilities. Specifically, In order to be used practically, it is applicable to cases that have already been completed or in progress, but cases that will occur in the future are also used for construction cost analysis, so the sustainability of the analysis method is lacking. For the purpose of this, we would like to suggest an automated estimating method. For the sustainability of construction cost estimates, Deep-Learning was introduced in the estimating procedure. Specifically, a method for automatically finding the relationship between design elements, work types, and cost increase factors that can occur in apartment remodeling was presented. In addition, Monte Carlo Simulation was included in the estimation procedure to compensate for the lack of uncertainty, which is the inherent limitation of the Deep Learning-based estimation. In order to present higher accuracy as cases are accumulated, a method of calculating higher accuracy by comparing the estimate result with the existing accumulated data was also suggested. In order to validate the sustainability of the automated estimates proposed in this study, 13 cases of learning procedures and an additional 2 cases of cumulative procedures were performed. As a result, a new construction cost estimating procedure was automatically presented that reflects the characteristics of the two additional projects. In this study, the method of estimate estimate was used using 15 cases, If the cases are accumulated and reflected, the effect of this study is expected to increase.

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

Development of Estimation System for Housing Remodeling Cost through Influence Analysis by Design Elements (설계요소별 영향분석을 통한 공동주택 리모델링 공사비개산견적 산출 시스템 개발)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.65-78
    • /
    • 2018
  • In As urban apartment are aging, the necessity of reconstruction or remodeling to extend the life of buildings is increasing. In such a case, a co-housing association is formed to implement decisions on reconstruction or remodeling projects. At this time, the most important thing for the co-housing association is the business feasibility based on the input of the construction cost.In the case of reconstruction, it is possible to estimate the construction cost by using the accumulated construction cost data, and then evaluate the feasibility using the construction cost. However, in case of remodeling, it is difficult to calculate the accurate construction cost because the number of accumulated construction cost data is small. In addition, non-specialist clients often require estimates of various design factors, often negatively impacting the accuracy of estimates and the duration of estimates. Therefore, in this study, proposed method to reflect the opinion of the owner who is a non-expert, as a design element, and a method of calculating the expected construction cost according to the design element, and constructed this system so that it can be easily used by the non-specialist owner. In order to clearly reflect the requirements of the non-specialist owner in the estimates, extracts the design elements from the existing remodeling cases, classify them, and suggest a plan for the client to choose. In order to reflect the design factors to the estimates, the existing apartment house remodeling cases were investigated and the design factors were extracted to have a large effect on the construction cost. Finally, developed system based on MS Excel so that the above contents can be easily used by a non-specialist client. In order to verify the accuracy of the proposed estimate in this study, verified the accuracy of 80% of the results by substituting the case of remodeling quotations and obtained a positive result from the questionnaire survey to examine the ease of use of the non-specialist customer. In this study, propose an estimate estimation method using four cases. If the remodeling cases are accumulated continuously, the expected effect of this study will be higher.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF