Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects (건축 프로젝트 개산견적 신뢰도 관리 프로세스에 관한 연구)

  • An, Sung-Hoon;Kim, Dae-Won;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.133-138
    • /
    • 2010
  • Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.

Development of Reliability for Conceptual Cost Estimates in Construction Projects (건축프로젝트 개산견적 신뢰도 향상 방안)

  • An, Sung-Hoon;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.175-180
    • /
    • 2006
  • Total conceptual cost estimates and the assessment of the reliability of these estimates are critical in the early stages of a building construction project. The purpose of this study is to propose the method to clients or estimators for improving the reliability of conceptual cost estimates by evaluating the reliability of conceptual cost estimates. The data from 83 building construction projects were collected for this study. The results showed that the proposed method can propose alternatives to clients or estimators for improving the reliability of conceptual cost estimates with the process of evaluation, review and feedback. This process can assist clients in their evaluation of the reliability of the estimated cost and the probability of exceeding the target cost, and in their re-estimation after dealing with the elements that influence the conceptual cost estimate badly.

  • PDF

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

기획단계에서의 최적 개산견적산정의 방법론 고찰

  • Kim Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.120-125
    • /
    • 2003
  • The estimated construction costs derived at the Planning stage of a project are utilized as important data determining the feasibility of overall project. Therefore the clients usually expect to have estimations of the construction cost as precise as possible and there has been extensive studies carried out by the cost specialists worldwide to satisfy this client's specific need whereas the local estimators still heavily rely on producing quantities and detail quotations only. This paper is to introduce a case study where elemental/functional area cost analysis is incorporated into a database system for the improved accuracy in cost estimations.

  • PDF

A Study on the Current Situations about the Use of Big Data for Cost Estimating Tasks in CM Companies (CM사 견적업무의 빅데이터 활용 현황에 관한 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.24-33
    • /
    • 2021
  • Cost management is a major function of CM (construction management) companies for clients and cost estimating is a critical task in that it provides a baseline for cost management and a foundation for decision making in construction projects. For this purpose, CM companies need to obtain and use good quality data, which leads to more accurate and efficient cost estimating. As the use of big data becomes increasingly important in the construction industry, researches related to the theme have become the active areas of studies. However, literature review shows that the current situations in relation to the use of big for cost estimating of CM companies are under-researched. The objective of the study is to identify key characteristics and implications in the use of big data for cost estimating of CM companies, which can contribute to develop strategies for such purposes.

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

A study on Cost~Estimating System based on Object- oriented Cad System (객체지향 캐드시스템을 활용한 견적관리 시스템 연구)

  • Song, Choon-Dong
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.1 no.1
    • /
    • pp.46-50
    • /
    • 2001
  • It is known that to automate the quantity take-off process enables you to increase the productivity best among the construction business field. However, the limitation of 2D(Two-dimension) CAD System prevented a cost-estimating system which makes the great effects on the quantity take-off process from being developed. This study aims that you can automate both the itemized statements and the quantity take-off process by using commercially available object-oriented CAD system. The commercially available CAD system today does not give us entire satisfaction. This study shows the deduction of the old boundaries of the object-oriented CAD system and the solution of those problems. And it also studied about the quantity take-off process and the automated cost-estimating system that can be used in the simple and plain repair-maintenance work such as the execution drawing which doesn't need the complicated drawings.

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.