• Title/Summary/Keyword: 검측 시스템

Search Result 50, Processing Time 0.026 seconds

Image Edge Detection Technique for Pathological Information System (병리 정보 시스템을 위한 이미지 외곽선 추출 기법 연구)

  • Xiao, Xie;Oh, Sangyoon
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.5 no.10
    • /
    • pp.489-496
    • /
    • 2016
  • Thousands of pathological images are produced daily per hospital and they are stored and managed by a pathology information system (PIS). Since image edge detection is one of fundamental analysis tools for pathological images, many researches are targeted to improve accuracy and performance of image edge detection algorithm of HIS. In this paper, we propose a novel image edge detection method. It is based on Canny algorithm with adaptive threshold configuration. It also uses a dividing ruler to configure the two threshold instead of whole image to improve the detection ratio of ruler itself. To verify the effectiveness of our proposed method, we conducted empirical experiments with real pathological images(randomly selected image group, image group that was unable to detect by conventional methods, and added noise image group). The results shows that our proposed method outperforms and better detects compare to the conventional method.

Utilizing Technology in Measurement System for Catenary Current: - Focusing on Testing Results for Kyoungbu High-speed Line in Korea - (조가선 전류 검측 시스템의 활용기술 연구 - 고속선 경부2단계 시험결과를 중심으로 -)

  • Park, Young;Jung, Hosung;Lee, Kiwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1465-1469
    • /
    • 2013
  • The resent developed high speed train called HEMU-430X (Highspeed Electric Multiple Unit - 430km/h eXperiment) recorded a 421.4 km/h in Kyoungbu high speed line in Korea. A verity of measurement systems are used to check the performance between pantograph and catenary system. An innovative measurement system is adopted to check the current of catenary wire in the track side during HEMU-430X test running. This paper presents the measurement results of catenary current in kyoungbu high-speed line and describe its utilizing technology in the experimental results of catenary current. In order to analyze field testing results, the current ratio between contact and catenary current have been analyzed by means of Carson-Pollaczek equation. And the current wave forms between catenary and contact wire are presented based on the simulation results.

Application of 3D Scanner for Tunnel Construction Using IT (터널 정보화 시공을 위한 3차원 스캐너의 활용 방안)

  • Son, Jae-Won;Min, Won;Ahn, Jae-Gyu;Heo, In-Wook
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.162-165
    • /
    • 2010
  • 우리나라 대형 건설시장의 하나인 터널 시공은 계획 대비 많은 물량과 자재의 소모로 인해 이들 정보의 지속적 관리를 통한 정확한 물량 및 자재 산출 정보 예측에 대한 관심이 꾸준히 요구되고 있는 실정이다. 대부분의 시공현장에서는 굴진의 정확도 검측을 위해 광파기를 사용하고 있다. 광파기는 공사 초기 시부터 유지된 원점으로부터의 정확한 좌표를 사용하고 있어 취득된 정보는 신뢰할 수 있으나, 몇 개의 기준점을 측량하여 굴진방향 및 공사의 진척도를 평가하는 방식이므로, 전체적인 면을 측정하지 못한다는 단점이 있다. 이에 반하여 3차원 스캐너는 제원에 따른 반경 내의 모든 점들을 계측하여 그 정보를 선이 아닌 면으로써 파악하지만 위치에 대한 정확도를 포함할 수 없다. 이러한 문제점을 보완하기 위하여, 광파기와 3차원 스캐너를 동시 활용하는 본 시스템은 현장에서 소모된 자원의 정확한 양을 체크하여 굴진정도를 파악하여 공사의 전반적인 진도를 관리할 수 있다. 또한 여굴의 발생 여부를 직접 확인하고 계획대비 소모된 물량정보를 통해 자재관리를 할 수 있게 된다. 마지막으로 추후 발생할 수 있는 하자에 대한 정확한 근거를 제시하여 균열 및 누수 등에 대한 정확한 원인 파악을 제공할 수 있다는 장점들을 제공한다.

  • PDF

Implementation of Real-Time Monitoring System for Overhead Contact Wire in Electric Railway (전차선로 검측을 위한 실시간 화상처리 시스템 구현)

  • Park, Young;Cho, Young-Hyeon;Lee, Ki-Won;Kwon, Sam-Young;Park, Hyun-Jun;Jang, Dong-Uk
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2006.06a
    • /
    • pp.543-544
    • /
    • 2006
  • This paper describes a simple real-time monitoring system for use in measurement subsystem of contact wire and geometry of overhead contact wire in electric railway. The system has been consists of a high speed CMOS camera with resolution $1024\;{\times}\;1280$ pixels, line type laser source with a power equal to 300 mW, and PC-based image acquisition system with PCI Express slot. National instrument LabVIEW (8.0) and vision acquisition software have been used in application programming interface for image acquisition, display, and storage with a frequency of sampling of 500 acquisitions per second.

  • PDF

Development of an Uplift Measurement System for Overhead Contact Wire using High Speed Camera (고속카메라를 이용한 전차선 압상량 검측 시스템 개발)

  • Park, Young;Cho, Yong-Hyeon;Lee, Ki-Won;Kim, Hyung-Jun;Kim, In-Chol
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.22 no.10
    • /
    • pp.864-869
    • /
    • 2009
  • The measurement of contact wire uplift in electric railways is one of the most important test parameters to accepting the maximum permitted speed of new electric vehicles and pantographs. The contact wire uplift can be measured over short periods when the pantograph passes monitoring stations. In this paper, a high-speed image measurement system and its image processing method are being developed to evaluate dynamic uplift of overhead contact wires caused by pantograph contact forces of Korea Tilting Train eXpress (TTX) and Korea Train eXpress (KTX). The image measurement system was implemented utilizing a high-speed CMOS (Complementary Metal Oxide Semiconductor) camera and gigabit ethernet LAN. Unlike previous systems, the uplift measurement system using high speed camera is installed on the side of the rail, making maintenance convenient. On-field verification of the uplift measurement system for overhead contact wire using high speed camera was conducted by measuring uplift of the TTX followed by operation speeds at the Honam conventional line and high-speed railway line. The proposed high-speed image measurement system to evaluate dynamic uplift of overhead contact wires shows promising on-field applications for high speed trains such as KTX and TTX.

Catenary Measurement System for Real-Time Automated Diahnosis (실시간 자동화 진단을 위한 전차선 검측시스템)

  • Kim, Jeong-Yeon;Park, Jong-Gook;Lee, Byeong-Gon;Hong, Hyun-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1020-1026
    • /
    • 2011
  • In this paper, we propose a method that measures the height and stagger of an catenary using the laser profile images. One line laser and area scanner CCD cameras are used. To quickly and accurately extract, from a photographed image, the area of the overhead line on which the line laser is shone, we consider the established fact that the catenary is the lowest among the electric wires. Here we are solving the the distance to the catenary if we know the distance the camera is from the ground and the angle of the catenary in the field of view. The angle will be related to the number of pixels in the image. This pixels per degree is a constant for the camera. Also, because of the different pixel resolution of the camera according to the overhead line position, we compensate the measurement result through camera calibration.

  • PDF

CNC Twisted Tube Method for 3D Coordinate Control Technology for Freeform Structure -Focused on The ARC in DaeGu- (비정형구조의 3차원 좌표제어를 위한 CNC Twisted Tube 공법 적용 -대구 대표물문화관(The ARC)를 중심으로-)

  • Ryu, Han-Guk;Kim, Sung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.434-440
    • /
    • 2013
  • Generally, the envelope of a freeform building is composed of a structure made with rectangular or C-shaped steel pipe, and steel or aluminum panel finishes on the structure. However, these construction methods increase material loss and cost and time. There are also numerous cases of misunderstanding of design and difficulties in construction, which frequently cause construction errors. Such construction errors decrease construction productivity, resulting in poor construction quality and the need for rework, as well as cost and time overruns. To solve the problem, this study proposes a 3D coordinate control technology for freeform structure implemented through a CNC(Computerized Numerical Control) Twisted tube method, and by extension, develops a BIM-based envelope construction method for freeform building.

Implementation of Optical-based Measuring Instrument for Overhead Contact Wire in Railway (전기철도 전차선로의 광학기반 형상 검측 하드웨어 구현)

  • Park, Young;Cho, Yong-Hyeon;Park, Hyun-June;Kwon, Sam-Young
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.518-518
    • /
    • 2008
  • We propose an optical-based measuring instrument of catenary system in electric railway. This system was made to utilize line scan camera as inspecting system to measure the stagger and height of overhead contact wire in railway and composed with optical type source and FPGA-based image acquisition system with PCI slot. Vision acquisition software has been used for the application to programming interface for image acquisition, display, and storage with a frequency of sampling. The proposed optical-based measuring instrument to measure the contact wire geometry shows promising on-field applications for online condition motoring. Also, this system can be applied to measure the hight and stagger or other geometry of different type of overhead catenary system.

  • PDF

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.