• Title/Summary/Keyword: 검측

Search Result 165, Processing Time 0.027 seconds

A Framework of Automating Inspection Task Generation for Construction Projects (건축 시공단계 검측 업무 자동 생성을 위한 프레임워크 개발)

  • Jo, Seuckyeon;Lee, Jin Gang;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.40-50
    • /
    • 2023
  • Quality control (QC) is an essential work for the successful construction project execution. Recently, robust application of ICT to the QC tasks leads to utilizing innovative technologies and equipment. However, overall planing of QC works needs to take place before applying new technologies to each and individual QC task. The objectives of this research involve developing a database and an algorithm that identifies QC tasks and related information upfront. In addition, the researchers developed a methodology to generate inspection tasks in conjunction with construction work tasks. The Korean Ministry of Land and Transportation provides standard supervision checklists. They were classified based on criteria of inspection items, methods, period and the scope. Reinforced concrete work was selected as a case study for validation of the method. This framework can function when planing construction tasks with any type of planning tools and innovative technologies. The researchers expect this framework may contribute to various construction projects when developing QC plans and tasks with applicable technologies.

A Study of Analysis Method for the Track geometry measuring data on High Speed Railway (고속철도 궤도검측자료 분석기법에 관한 연구)

  • Kang, Kee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.1
    • /
    • pp.47-51
    • /
    • 2006
  • Measuring the track geometry of a high-speed railway is the most important task in track construction and track maintenance work. Measuring accuracy is particularly sign the formulation of the maintenance plan and in the assessment of the work quality, and because it can set the train speed limit. To determine the track geometry of a high-speed railway, it is important to use KNR's track recording coach (EM-120). According to the result of the spectrum analysis, noise near the 1-m wave band was found on the track recording data. A new filter was thus applied to remove the noise from the track recording data. A similar result can be acquired when this method is used in real track geometry.

Application of Augmented Reality to Steel Column Inspection (강기둥 시공검측을 위한 증강현실의 적용)

  • Shin, Do-Hyoung;Song, Yong-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.55-60
    • /
    • 2008
  • Inspection of steel columns which is one of the most critical elements in construction requires trained surveyor(s). Also it takes time to handle survey device(s) delicately for accurate measurements. To improve the inspection process of steel columns, the previous studies developed the AR prototype system, ARCam, and showed that ARCam is a promising inspection device that can reduce inspection time. However, ARCam still requires a surveyor to make measurements based on his visual perception and judgment This study proposes an algorithm for automatic inspection based on ARCam. The algorithm is based on image processing and computer vision and focuses on the inspection of steel column plumbness. This method will make measurements without a surveyor's judgment. The ultimate purpose of the automatic inspection is to minimize the surveying labor, thus reducing inspection time and cost.

  • PDF

High Speed Rail Measurement System of HSR-350x (한국형고속열차 고속 궤도검측시스템)

  • Kim, Sang-Soo;Park, Choon-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.2
    • /
    • pp.115-119
    • /
    • 2008
  • Korean Train Express (KTX) has opened to commercial traffic since 2004 at maximum speed 300km/h. As the speed of the train becomes higher, the conditions of the rail affect the behavior of the running train. To secure the safety and reliability of high speed railway, it is necessary to inspect rail irregularities and to maintain the rail regularly. The authors designed the high speed rain measurement system over 300km/h. And we installed the system to Korea High-speed Railway (HSR 350x). In this paper, we introduce the high speed rail measurement system for HSR 350x and show verification of the performance of the system through test runs.

Structure of Integrated Adaptive Catenary Inspection System for Improved Safety (안전성 고도화를 위한 융합-가변형 전차선 검측시스템의 구조)

  • Kim, Ji-Yoon;Kim, Jung-Phyung;Kim, Woo-Saeng
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.9
    • /
    • pp.147-152
    • /
    • 2015
  • Almost all existing inspection methods for catenary system have relied on dedicated track inspection cars. Two factors make it necessary to modify the conventional method: First, the climate has become increasingly similar to that of a subtropical area. In addition, high speed trains have been developed that can run as fast as 450Km/h. This paper presents a visual catenary inspection system structure that incorporates roadbed information for high-speed running environments. Conventional catenary inspection systems determined the degree of wearing only for the trolley wire. The facility inspection system presented in this paper on the other hand utilizes visual and sound data of inspection targets and adjusts inspection frequency and sensitivity depending on the geographic data.

A Study on the Strategy to Improve Maintenance Problem Using Measurement System of Traction Return Current in High Speed Line (고속선에서 귀선전류 검측시스템을 활용한 유지보수 향상방안 연구)

  • Lee, Tae-Hoon;Park, Ki-Bum;Lim, Myoung-Sub
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.253-255
    • /
    • 2006
  • 본 논문은 고속선에서 전차선 귀선전류를 측정하여 UM71-C 궤도회로의 유지보수를 향상하고자한다. KTX 36호에 구축된 차상 검측시스템 중 귀선전류 검측시스템에서 레일 좌/우에 흐르는 전차선 귀선전류 및 레일 간의 귀선전류 차를 검측하여 불평형 상태를 비교 및 분석하였다. 이러한 결과는 궤도회로 설비들에 대한 구성요소의 기능저하를 사전 예측하여 열차의 안전운행을 확보하기 위한 자료로 활용하고, 또한 검측시스템에서 얻어진 데이터들과 비를 통해 향후 유지보수에 활용 가능한 지침 및 분석기준을 마련하고자 한다.

  • PDF

Technical Trend of Measuring System for Track Inspection (궤도측정을 위한 계측시스템의 기술동향 및 구성방안)

  • Han Young-Jae;Kim Jong-Young;Seo Sung-Il;Kim Seog-Won;Kang Yun-Suk
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1442-1444
    • /
    • 2004
  • 현재 한국형 고속전철은 시운전 시험 중에 있으며, 차량 내에 상시 계측시스템이 구성되어 있어서 차량의 전기장치 신호나 기계장치 신호를 획득하여 주행 및 제동에 관한 성능 및 특성을 분석하고 파악할 수 있다. 하지만 차량의 안전성, 승객의 승차감 확보와 궤도의 빠른 유지보수를 위해 궤도를 전문적으로 감시하고 검측하는 시스템은 구축되어 있지 않다. 그러므로 고속전철 차량에 설치되어 고속주행 중에 궤도를 종합적이고 효율적으로 측정하는 전문적인 계측시스템을 구성할 필요가 있다. 따라서 궤도틀림의 검측방법과 검측기구 및 그 원리를 이해하고 선진국의 궤도 검측기술을 파악하여 보았다.

  • PDF

A study on the period ${\lambda}$/2 of the short current(Icc) by KTX36(300km/h) (KTX36호(300km/h) 단락전류의 반파장주기(${\lambda}$/2)에 관한 연구)

  • Park, Ki-Bum;Lee, Tae-Hoon;Lee, Gi-Chun;Jeon, Yong-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1167-1168
    • /
    • 2007
  • 본 논문은 KTX36호(300km/h) 운행시 수집된 검측데이터를 효과적으로 분석하여 유지보수에 활용하기 위한 단락전류의 반파장주기(${\lambda}$/2)에 관한 연구수행 결과를 나타낸다. KTX36호는 현재 하나의 객실을 검측차로 개조하여 운행속도에서 각종 검측을 수행하고 있다. 우리나라의 고속선 궤도회로는 프랑스의 궤도회로와 달리 토공, 교량, 터널 구간으로 나뉘어 있으며, 상용전원 주파수도 프랑스는 50Hz, 우리나라는 60Hz를 사용하고 있어 정보전송을 위해 사용하는 반송주파수도 다르다. 또한 특성임피던스 와 감쇠정수/위상정수를 결정짓는 중요한 변수인 선로정수(R,L,G,C)가 다르기 때문에 KTX36호의 단락전류에 대한 반파장주기(${\lambda}$/2)는 검측데이터를 활용한 유지보수에 있어 매우 중요한 역할을 한다. 본 논문에서는 프랑스에서 사용하는 단락전류의 반파장주기 (${\lambda}$/2)에 대해 언급하고 연구결과 산출된 국내 단락전류의 반파장주기(${\lambda}$/2)를 비교하였다.

  • PDF

Logging for a Stone Column Using Crosshole Seismic Testing (크로스홀 탄성파 시험을 이용한 쇄석말뚝의 검측)

  • Kim, Hak-Sung;Mok, Young-Jin
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.139-145
    • /
    • 2010
  • An integrity testing for stone columns was attempted using crosshole S-wave logging. The method is conceptionally quite similar to the crosshole sonic logging (CSL) for drilled piers. The critical difference in the logging is the use of S-wave rather than P-wave, which is used in CSL, because swave is the only wave sensing the stiffness of slower unbounded materials than water. An electro-mechanical source, which can generate reversed Swave signals, was utilized in the logging. The stone column was delineated using the S-wave travel times across the stone column, the S-wave velocity profile of the crushed stone($V_{cs}$-profile) and that of surrounding soil($V_s$-profile). In the calculation of $V_{cs}$-profile of the crushed stone, its friction angle and Ko (coefficient of lateral earth pressure at rest) are recommended to be used. The calculation of the column diameter is not much affected by the values of friction angle and Ko.