Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.
Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.110-118
/
2007
For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.
Korean Journal of Construction Engineering and Management
/
v.12
no.1
/
pp.23-32
/
2011
Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.
Korean Journal of Construction Engineering and Management
/
v.17
no.2
/
pp.31-38
/
2016
In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.
Korean Journal of Construction Engineering and Management
/
v.1
no.3
s.3
/
pp.124-134
/
2000
In construction projects, the design information, which should contain accurate product information in a systematic way, needs to be applicable through the life-cycle of projects. However, paper-based 2D drawings and relevant documents has difficulties in communicating and sharing the owner's and architect's intention and requirement effectively and building a corporate knowledge base through on-going projects due to Tack of interoperability between specific task or function-oriented software and handling massive information. Meanwhile, computer and information technologies are being developed so rapidly that the practitioners are even hard to adapt them into the industry efficiently. 3D modeling capabilities in CAD systems are enormously developed and enables users to associate 3D models with other relevant information. However, this still requires a great deal of efforts and costs to have all the design information represented in CAD system, and the sophisticated system is difficult to manage. This research focuses on the transition period from 2D-based design Information management to 3D-based, which means co-existence of 2D and 3D-based management. This research proposes a model of a compound system of 2D and 3D-based CAD system which presents the general design information using 3D model integrating with 2D CAD drawings for detailed design information. This research developed an integrated information management system for design and specification by associating 2D drawings and 3D models, where 2D drawings represents detailed design and parts that are hard to express in 3D objects. To do this, related management processes was analyzed to build an information model which in turn became the basis of the integrated information management system.
SHOP DWG의 현주소 어디까지 왔는가? 설계에서 제조에 이르는 전 과정을 컴퓨터로 제어하고 관리하는 기술. 캐드(CAD)와 캠(CAM)은 각각 computer-aided design,computer-aided manufacturing의 약칭으로 컴퓨터보조설계와 컴퓨터보조생산을 뜻한다.
CAD는 설계도면을 한 장씩 수작업으로 제도하지 않고 설계 데이터베이스의 정보를 CRT(cathode ray tube)에서 화상을 보고 합성하면서 설계하므로 작업을 최적화 할 수 있다. CAD로 설계된 설계도의 내용은 CAM을 통해 NC(수치제어)공작기계에 정확한 작업동작을 지시하게 되며, 작업관리∙가공∙조립∙검사 등의 제조과정을 컴퓨터로 관리하여 작업속도와 제품의 정밀성을 높이게 된다. 최근에는 건축현장의 2D system이 보편화되어 있지만 건축현장의 핵심이라고 할 수 있는 기계설비의 기계실, 또는 조립화 공법 등에는 3차원 CAD∙CAM시스템이 개발되어 입체형상을 화면에 3차원으로 재현할 수 있고, 대상물의 표면적∙부피∙무게∙강도 등의 물리적 성질도 자동 계산하여 최적상태에서 현장의 시공에 적용할 수 있게 되었다. 1960년대 초 미국에서 자동차 모델∙엔진, 항공기 부품 등 의 설계에 수작업의 한계를 느껴 개발되었으며, 한국에서는 70년대 중반에 도입되어 운용되고 있다. 이에 따라 프로그램 회사들은 다양한 방법 등을 SHOP DWG에 적용하여 판매경쟁이 치열하다.
(주)우진아이엔에스는 급속한 산업경제의 변화와 무한경쟁시대에 보다 나은 기술개발 투자에도 노력을 기울여, 2000년 11월 용인공장, 생산라인을 천안으로 이전, 확장 하여 배관 및 닥트의 CAD-CAM SYSTEM, P.F.P공법, 기계실3D, 블럭화배관, 닥트자동화 시스템, 설계, 용접공정을 공장화시켰으며, 신 개발품인 S.C.D(SEMI-CON DUCT)를 신설하여 모든 건축물에 맞는 필수적인 제품을 생산함으로써 선택의 폭을 넓히고, 현장 시공능력 효율을 높이고 있다. 이번 호에서는 (주)우진아이엔에스가 95년 설계팀을 발족하여 제로시스템의 3D공법을 공장 및 현장의 SHOP DWG에 적용해왔고 최근에는“서초 프로젝트A”현장에 SHOP DWG의 최대 결집체인 3D활용의 조립화 공법을 적용하여 초고층 오피스텔현장을 시공한 사례를 게재한다. 우진아이엔에스는 30여년의 기술 축척을 바탕으로 최고의 기술력과 풍부한 경험을 통해 아셈무역센타, 타워팰리스1차, 3차 및 목동트라팰리스, 분당트리폴리스, 수원삼성전자 R4, 등 국내굴지의 초고층빌딩 시공을 근거로 초고층의 기본설계를 이해하고 SHOP DWG을 통해서 기계설비공사의 향후 나아갈 지표를 제시하고 있다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.8
/
pp.370-378
/
2020
The Construction Operations Building Information Exchange (COBie) collects and documents a large amount of information from different paths in one place during design and construction projects. This documented information is readily available as a means of continuously transferring data to the facility management systems used by building engineers. In this process, the COBie Worksheet, an open standard form, is used to input the information by simplifying the list required by the user. As a result, COBie was developed to improve dramatically how relevant information is obtained and updated to support operations, maintenance, and asset management at the design and construction stages. On the other hand, to use COBie, a great deal of manual work is required for information linkage and quality inspection with heterogeneous data models. These issues become obstacles to COBie-based facility management system development. This study analyzed the COBie information system and defined the framework for simpler operating maintenance information from BIM (Building Information Modeling). Moreover, the rules for facility management information submission, quality inspection, role definition of framework components, and information linkage were derived. COBie DB schema and support data linkages could be generated effectively based on the proposed framework in prototype development.
Choi, Gap Yong;Chang, Eun Mi;Kim, Seong Gon;Cho, Kwang-Hyun
Spatial Information Research
/
v.22
no.3
/
pp.79-87
/
2014
In order to foster rapid disaster response and public life protection, National Emergency Management Agency has been trying to spread 'Emergency Rescue Standard System' on a national scale since 2006. The agency has also intensified management of firefighter's safety on disaster site by implementing danger predication training, specialized training and education and safety procedure check as a part of safety management officer duties. Nevertheless, there are limitations for effective fire fighting steps, such as damage spreading and life damage due to unawareness of illegal converted structure, structure transformation by high temperature and nearby hazardous material storage as well as extemporary situation handling endangered firefighter's life. In order to eliminate these limitations there is a need for an effort and technology application to minimize human errors such as inaccurate situational awareness, wrong decision built on experience and judgment of field commander and firefighters. The purpose of this study is to propose a new disaster response model which is applied with geospatial information. we executed spatial contextual awareness map analysis using fire-fighting vulnerable zone model to propose the new disaster response model and also examined a case study for Dalseo-gu in Daegu Metropolitan City. Finally, we also suggested operational concept of new proposed model on a national scale.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.4
/
pp.43-49
/
2017
In recent years, the use of BIM in domestic construction has been increasing, but it is used mainly for internal and external visualization rather than for BIM design including drawings. For this reason, several studies have highlighted the lack of libraries and economic problems for BIM design. In other words, for the most economically small domestic design offices, activating the BIM design is a negative factor because it is difficult to invest the necessary manpower and cost to produce and use the required BIM library. The BIM design can be more applicable if the library can be supplied economically, easily, and quickly. In this study, BIM library business model and consideration factors that can provide BIM library service economically, easily, and quickly by considering the existing building material selection task and BIM library are presented. The proposed business model will increase the number of suppliers of BIM libraries, which are lacking in Korea, and will enable an effective BIM design at low cost and effort. If a service that reflects the business model proposed in this study is made, an integrated database that can consistently share information in the design, construction, and maintenance stages will be constructed. This can monitor the changes in material and equipment information during the life cycle of the building. The database can be used to monitor any changes in material and equipment information throughout the life cycle of a building, so that it can be used as historical data for effective design and maintenance as well as for material and equipment upgrades.
Journal of the Korea Institute of Building Construction
/
v.23
no.5
/
pp.651-662
/
2023
Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.