• Title/Summary/Keyword: 건축물 정보관리의 모델

Search Result 63, Processing Time 0.034 seconds

A Work Process Model for a Quality Management in Steel Frame Work (철골공사의 품질관리 업무 프로세스 모델 개발)

  • Kim, Jong-Seong;Kim, Hyoung-Joong;Byun, Eun-Jung;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.150-158
    • /
    • 2007
  • As higher and bigger buildings, steel structure is so for a basic building structure. Quality management of the steel frame work is started from pre plan phase. And classification and relation of works is very important in quality management. The purpose of this study is developing a quality management model for the better quality management in a steel frame work. This model consider a interrelationship of works and $input^{\circ}{\S}utput$ information, and based on the actual condition of current quality management.

Information Modeling of Railway Track using Information Iinkage of Railway Alignment and Alignment-based Objects (철도 선형중심의 객체 정보연계를 통한 철도 궤도부 정보모델 생성 방안)

  • Kwon, Tae Ho;Park, Sang I.;Shin, Min Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.507-514
    • /
    • 2017
  • As BIM has been widely used in the field of architecture, efforts to apply BIM to civil engineering structures are increasing rapidly. Since commercial BIM softwares are focused on building structure, it is difficult to apply to alignment-based civil infrastructures. In this study, we proposed a method to generate an information model that reflects cant by sharing information between alignment-centered modeling tools and BIM authoring tools to manage information of railway track. The railway track modeling process consists of classifying structures into continuous and non-continuous structures, creating continuous structures by alignment-centered modeling tools, and using the shared alignment information to generate information model of the non-continuous structures. Non-continuous structures were generated by an algorithm that calculates the position and rotation information of each structure based on discretized railway alignment and cant information transmitted to the BIM authoring tools. The availabilities of proposed method were studied by applying to the osong test-line. Using the test model, it was shown that the objects were identified, the properties were extracted, and the quantities of each structure were calculated.

POC : Establishing Dataset for Artificial Intelligence-based Crack Detection (POC : 인공지능 기반 균열 탐지를 위한 데이터셋 구축)

  • Kim, Ji-Ho;Kim, Gyeong-Yeong;Kim, Dong-Ju
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.45-48
    • /
    • 2022
  • 건축물 안전 점검은 대부분 전문가의 현장 방문을 통한 육안검사다. 그중 균열 검사는 건물 위험도를 나타내는 중요한 지표로써 발생 위치, 진행성, 크기를 조사하는데, 최근 균열 조사 방식에 대해 객관성과 체계성을 보완할 딥러닝 개발이 활발하다. 그러나 균열 이미지는 외부 현장에 모양, 규모도 많은 종류라 도메인이 다양해야 하는데 대부분 제한된 환경과 실제적인 균열 검사와는 무관한 데이터로 구성되어 실효적이지 않다. 본 연구에서는 균열 조사에 적합하고 Wild 환경에 적용 가능한 POC 데이터셋을 소개한다. 기존 균열 공인 데이터셋 4종의 특징과 한계점을 분석을 토대로 고해상도 이미지로써 균열의 세부 특징을 담았고 균열 유사 환경과 조건들을 추가 촬영해 균열 검출에 강인하게 학습되도록 지향하였다. 정제 및 라벨링 작업을 거친 POC 데이터 셋은 균열 검출모델인 YOLO-v5으로 성능을 실험하였고, mAP(mean Average Precision) 75.5%로 높은 검출률을 보였다. POC 데이터셋으로 더욱 도메인에 적응적(Domain-adapted)인 인공지능 모델을 개발하여 건물, 댐, 교량 등 각종 대형 건축물에 대한 안전하고 효과적인 안전 관리 도구로써 활용할 것을 기대한다.

  • PDF

Research on the Construction of an Automation Model for Maintenance Managers Based on Smart Devices (스마트 디바이스 기반 유지보수 관리자용 자동화 모델 구축에 관한 연구)

  • Park, Jihwan;Chung, Suwan;Lee, Seojoon;Song, Jinwoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.72-80
    • /
    • 2021
  • Based on the previous year's statistics, 37% of buildings in South Korea are aged over 30 years. As the number of the aging buildings increases, so does the need for maintenance. Building maintenance involves a significant number of works; the work of 'maintenance manager' accounting for the largest part. Currently, the maintenance history record is mostly in drawing or handwritten form which makes reviewing the data highly time consuming. Therefore, to improve the convenience of maintenance works and optimize historical data management, the existing maintenance process was analyzed. Problems were derived and a smart device-based automation model was established. In order to establish a smart device-based automation model, ① general flow of facility management process was analyzed and related articles were reviewed, ② current maintenance process was optimized, ③ functional block diagram of BIM Data, COBie Data, IoT, and AR-based automated maintenance management model was created, ④ a smart device-based automated maintenance management model was constructed, ⑤ finally, the above system was verified by testing the aforementioned model in the field site, evaluating the time required for the maintenance process and reviewing maintenance history data against the current one.

Risk Management for Environment Protection in Job Site Utilizing BIM Method (BIM을 활용한 현장시공의 친환경 위험관리에 관한 연구)

  • Li, Teng;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.111-114
    • /
    • 2010
  • With the rise of green technology, the environmental question causes people’s attention more and more, based on objective of the sustainable development, the green risk has already begun to appear. In the paper the definition of the green risk of construction project is given, it analyzes and identifies the green risk of construction project from three aspects, based on BIM, the relation with green risk was found. Though the relation, the management of green risk was analyzed and we may take some measures to reduce the unnecessary risk and waste.

  • PDF

A Study on Automated Reinforcement Detailing for Reinforced Concrete Structures Using BIM (BIM 기반 철근콘크리트 구조물의 자동 배근 모델 생성)

  • Park, U-Yeol;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.507-515
    • /
    • 2024
  • Recent advancements in Building Information Modeling(BIM) have significantly impacted the construction industry, driving competitiveness and innovation. However, rebar construction, a critical component influencing project quality and cost, has lagged behind in BIM adoption. Traditional methods relying heavily on 2D drawings for rebar detailing have hindered efficiency and introduced potential errors. This paper presents a novel system designed to automate the detailed modeling of rebar, thereby promoting BIM integration within rebar construction and optimizing construction management processes. The system leverages confirmed structural drawings from the post-structural design phase to automatically generate intricate rebar models for columns and beams. To ensure adherence to domestic structural design standards, the system is developed using C# programming language and the Revit API. By automating rebar modeling, this system aims to minimize human error, reduce labor-intensive tasks, and enhance overall rebar construction efficiency through the effective utilization of generated rebar model data.

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

A Study on the Damage Analysis of Chemical Substances Explosion Accident Using GIS (GIS를 활용한 화학물질 폭발사고 피해분석 연구)

  • Ham, Tae-Yuun;Kwon, Gi-Min;Song, Moon-Soo;Yun, Hong-Sik
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.99-100
    • /
    • 2022
  • 화학산업이 발전함에 따라 잠재적인 화학물질 폭발사고 위험 또한 증가하고 있다. 순식간에 치명적인 인명, 재산피해를 남기는 폭발에 대한 영향을 예측, 분석하기 위해 다양한 해석모델이 활용되고 있지만, 폭발의 물리적 특성상 다양한 형태의 건물이 밀집된 지역에 대해서는 해석모델 사용만으로 높은 정확도의 분석을 진행하기에는 어려움이 있다. 따라서 본 연구는 GIS 공간정보와 3D 폭발 시뮬레이션의 약결합 방식을 적용하였다. 실제 연구지역과 동일한 환경을 구현하여 시뮬레이션을 구동하였고 이에 따른 폭발 규모와 폭발에 노출된 대상별 가해지는 압력 값을 도출하였다. TNT를 기준으로 위험물 저장 및 취급시설에 대한 최저 기준인 지정수량 200kg을 적용하였음에도 최대 2,960kPa의 압력이 발생하는 것으로 확인되었다. 본 연구로 도출된 결과에 건축물의 용도와 중요도를 적용한다면 토지이용계획 및 공간활용에 반영할 수 있으며, 안전관리자로 하여금 리스크 평가, BC분석, 안전관리계획 수립 등에 활용 가능하다고 사료된다.

  • PDF

A Study on the Feasibility of COBie to the Wastewater Treatment Plant (COBie 기반 하수처리시설 유지관리시스템 구축)

  • Choi, Jae-Ho;Um, Dong-Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.273-283
    • /
    • 2014
  • With the introduction of COBie (Construction Operation Building Exchange) in BIM technology enabling an automatic transfer of design and construction information to operation and management (O&M) phase, the BIM centric O&M management system development process has been tested on the subject of architectural types of building. However, for now, there is a need to investigate the technical feasibility of COBie application to civil structures including industrial facilities. This study takes both "O&M Guideline for Public Wastewater Treatment Plant" and a real wastewater treatment plant into account for the purpose, in which the latter is intended to supplement the result of the first. The findings are three-folds: (1) COBie, as an asset modeling, is not sufficient enough to encompass commissioning data, (2) more relevant IFC development and family library build-up useful to modeling wastewater treatment plant is imperative, and (3) well-planned coordination and organization of COBie data-set in line with O&M practice will enhance the feasibility of the COBie in industrial facilities. The result could be used for a basis study for COBie application, particularly in industrial facilities.

An Analysis of Vertical Position Accuracy for the Three-Dimensional Spatial Data Object Utilizing the Public Information (공공데이터를 활용한 3차원 공간정보 객체의 수직위치 정확도 분석)

  • Kim, Jeong Taek;Yi, Su Hyun;Kim, Jong Il;Bae, Sang Won
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.3
    • /
    • pp.137-143
    • /
    • 2014
  • Recently, as new paradigm for government operation called government 3.0, government is actively operating policy opening and sharing public data. In addition, the Ministry of Land are operating an open platform integrated map service (the VWorld) which provides a variety of video contents such as the country's national spatial information, traffic information and three-dimensional building for the public. According to W3C Foundation's Open Data Status Report(2013), our country has the evaluated results that the part of the government's policy support and planning is good while the part of the data management is vulnerable. So our country needs the quality improvement for the data management. In addition, a digital aerial photograph image data is required to be up-to-date for the three-dimensional spatial object data. In this paper, we present the method for enhancement of the accuracy of vertical position and for maintainment of up-to-date vertical position. Our methods evaluate the data quality and analyze the cause of error of measurement utilizing the national standard quality assessment method. The result of research shows that the accuracy of vertical position is improved if the height of the building captain is adjusted by the quality assessment values and a three-dimensional model has up-to-date data if reconstruction and extension information of construction register is utilized.