• Title/Summary/Keyword: 건축공사

Search Result 1,826, Processing Time 0.031 seconds

주택건설촉진법시행령 개정(안)에 대하여

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.5 s.301
    • /
    • pp.16-25
    • /
    • 1994
  • 건설부에서 지난 1월 7일 주택건설촉진법을 개정, 공포함에 따라 이의 시행에 필요한 주택건설촉진법시행령개정(안)이 지난 3월 26일 입법예고 됐다. 이 안은 300가구 이상 공동주택 공사감리를 건설기술관리법에 의한 감리전문회사가 담당하고, 300가구 미만 공동주택 공사감리는 건축사법에 의한 감리자(건축사)가 해야 한다는 내용으로 최근 건축사협회는 이에 대한 의견을 관계당국에 제출하는 등 강력한 입장표명을 하고 있다. 이와 관련, 본지에서는 주택건설촉진법시행령(안)의 주요내용과 그에 따른 건축사협회 입장을 알아보고 아울러 건축관계전문가의 의견을 들어본다.

  • PDF

The Economic Impact of Excavation Work Failure on a Construction Project (터파기 공사 사고가 공사에 미치는 경제적 영향)

  • Go, Kwang-Ro;Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.643-646
    • /
    • 2007
  • As increase of the land price at downtown area, it makes people more and more interested of improving the space utilization such as makes buildings bigger, deeper and higher. Therefore, the importance of the underground construction which is the basic principle has been increased. As constructors have to complete underground construction as soon as possible with the minimum costs, they concentrate on the whole process of underground structure. Although they makes every these efforts, construction failure still happen because of the uncertainty of the condition of soil and the unexpected danger of underground construction. To make matter worse, there are only some examples without detailed information like 'how much this breakdown damage to the construction?' so it is the anther problem that most of people doesn't recognize the economical negative impact of underground structure breakdown. This report would make people understood the importance and risk of the underground construction by showing some analysis which was assumed from the real accidents.

  • PDF

A Study on the Improving Management Method for the Small Projects Applying Senior Construction Engineer (고령 건설기술자를 활용한 소규모공사의 공사관리방법 개선에 관한 연구)

  • Song Jin-Woo;Lee Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.305-310
    • /
    • 2004
  • The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than $200m^2$ of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing all the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.

  • PDF

A Study on the Development of a Non-supporting Form for Basement Wall and the Analysis on Its Economical Efficiency (지하옹벽 무지주 거푸집 개발 및 경제성 분석에 관한 연구)

  • Kim, Jae-Yeob;Lee, Sang-Woo;Sohn, Young-Jin;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.161-168
    • /
    • 2009
  • In an architectural construction, underground construction is a critical path forming a major part of the total construction period and cost, and particularly in big cities, its size has been increasing every year. A basement wall currently constructed in the field needs a large functional work force, and the construction is under progress by the Euroform and Soldier system, which is disadvantageous in terms of the construction period. Therefore, in this research, non-supporting forms which are applicable to the buildings construction were developed, based on the non-supporting forms partly used in some civil engineering works. In addition, the size of a form was assumed and its economical efficiency was compared to that of the Euroform and Soldier system which is used most in construction fields, and the results were analyzed. The study results showed that the construction cost of composite non-supporting forms was higher than that of the Euroform and Soldier system by about 8%, and the construction cost of non-composite non-supporting forms were lower than that of the Euroform and Soldier system by about 9%. However, in the case of composite non-supporting forms, the amount of concrete and reinforcing rods remarkably decreased in structural construction, so it has the effect of an economical cost reduction compared to the construction cost of existing walls by about 35%

A Improvement of Energy Efficient Ratings for Public Buildings (공공사옥 건축물 에너지효율등급 향상을 위한 개선기법 및 사례)

  • Jeong, Han-Sang;Byeon, Il-Hwan;Kim, Woo-Yong;Jeong, Gyeong-Won
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2097-2098
    • /
    • 2011
  • 한국수자원공사 전북지역본부는 2009년 1월 전북 전주시 여의동에 본부신축공사를 착공하였다. 같은 해 12월 정부는 저탄소 녹색성장을 위해 신축 공공청사 건축물에너지효율 1등급 취득 의무화 제도를 시행하여 2010년 1월부터 신축되는 모든 공공청사는 건물에너지효율 1등급 취득이 의무화 되었다. 전북지역본부와 같이 진행중인 건축물에 대해서는 강제성은 없고 에너지효율 향상을 위한 제반 조치 마련토록 권고하였다. 그러나 전북지역본부는 정부정책과 공사 이미지 제고를 위해 진행중인 공사에 대해 건축물 에너지효율인증등급 향상을 위한 개선 방안을 수립하고 설계변경을 통해 결국 1등급 인증을 획득하였다.

  • PDF

Development of a Demolition Construction Risk Assessment Manual (해체공사 위험성평가 매뉴얼 개발 연구)

  • Hyung, Sung-Han;Jang, Won-Jun;Lee, Moon-Bae;Moon, Yoo-Mi
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.93-94
    • /
    • 2023
  • 해체공사는 작업의 특성상 단기간에 이루어지며, 해체공사 현장에 투입되는 근로자는 일용직 근로자가 대부분으로 안전사고의 비율이 높다. 사업장 위험성 평가에 관한 지침에는 위험성 평가시 근로자를 참여토록 하고 있으나 해체현장의 특성상 근로자가 참여한다고 하여도 위험요소를 파악할 역량이 부족할 따름이다. 또한 기존의 해체공사 안전관리 매뉴얼은 구조안전성 확보를 위한 매뉴얼로 해체 근로자의 안전을 위한 매뉴얼은 없는 실정으로, 근로자의 안전을 확보하기 위한 위험성 평가 매뉴얼이 요구되고 있다. 이에 본 연구에서는 건설공사 안전관리 종합정보망(CSI)의 해체 및 철거공사의 사고사례를 분석하였으며, 해체 및 철거 사고시 발생한 주요 위험요소를 도출하여 작업 공종별로 유해·위험요인의 파악을 손 쉽게 할 수 있도록 하였다. 또한 해체 현장 규모에 따라 대규모 현장은 빈도·강도법, 중·소규모 현장은 체크리스트법을 활용하여 위험성을 결정하고 감소대책을 수립할 수 있도록 매뉴얼을 구성하였다. 잔여 위험에 대해서는 관리카드를 만들어 해체공사 완료시까지 관리하도록 하였다.

  • PDF

장기방치공사 재개시 공사계획 및 관리

  • Cho, Sang-Young;Jung, Yong-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.8-15
    • /
    • 2004
  • 1997년 11월 IMF 영향에 따른 ○○건설사의 부도로 인해 1년동안 ('97. 11∼'98. 11) 공사가 중단된 채 방치되어 많은 문제점을 안고 공사를 재개하지 못하고 있는 현장이 전국에는 아직도 100여개 정도 산재해 있는 것으로 알고 있다. 이와 같은 현장의 공사재개를 위해서는 다음과 같은 문제점을 검토해야 한다. 첫째 기술적 문제점으로는 기초와 지하주차장 골조공사가 일부 시공중 중단되어 철근이 1년 동안 방치된 채 부식되어 있어 구조물 안전진단은 물론 부도에 따른 기 시공 협력업체들의 채무정리(22개사)에 대한 문제가 해결되지 많아 공사의 재개에 많은 어려움이 있으므로 충분한 사전검토가 필요하다. 둘째 외부적 문제점으로는 그동안 공사중단으로 인한 입주자들에 대한 신뢰확보 즉 조합 및 분양자들이 건설사의 부도로 인한 중도금 납입 거부상태는 물론 선납금, 연체이자 등의 경제적 피해 손실로 발주처에 대한 집단소송 진행 등에 따른 건설사 및 발주처에 대한 불신 해소를 어떻게 하느냐가 공사재개의 중요한 관건이었다.(중략)

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF