The Theory of Load Estimation Method and Case Study of Hydraulic Breaker for Rock Drilling (진동기반 하중 추정기법의 이론 및 암반 천공용 유압 브레이커 적용사례)

  • Kim, Dae-ji;Cho, Jung-Woo;Oh, Joo-Young;Chung, Jintai;Song, Changheon
    • Tunnel and Underground Space
    • /
    • v.29 no.3
    • /
    • pp.135-147
    • /
    • 2019
  • This paper introduced a impact load estimation method by examining vibration transfer path analysis (TPA). The theoretical background and the load quantification procedure are explained, and a case study of hydraulic breaker is reported. We explained the merits and limitations of the load estimation method of TPA, and improvement method was suggested through case analyses of drilling equipment. The necessity of R&D of load-estimation technology was discussed. A new strategy for developing new techniques for impact load measurement was proposed.

Reliability Assessment of Ambient Noise HVSR per Observation Condition (관측 환경에 따른 상시미동의 HVSR 결과 신뢰도 평가)

  • Yoo, Byeongho;Choi, Woojeong;Choi, Inhyeok;Kwak, Dongyoup
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.23-33
    • /
    • 2022
  • The horizontal-to-vertical spectral ratio (HVSR) of ambient noise is widely used to identify the resonant frequency of a site. The frequency at the largest HVSR is regarded as the resonant frequency. The source of ambient noise is impossible to identify and control. Therefore, obtaining reliable HVSR of ambient noise requires sufficient measurement time and absence of near-field vibration. In this study, we investigated the minimum stabilization time required for a portable seismometer and the effect of the distance between the seismometer and artificial vibration on HVSR estimation. In the case of a soil site, the HVSR was stabilized after 5 minutes after sensor installation. In the case of a rock site, stabilization required more than an hour. Human-footsteps within 10 m of the seismometer strongly influenced the HVSR for the soil site. These results provide a field guideline when measuring ambient noise for HVSR.

Natural frequency equations of tapered beams (변단면 보의 고유진동수 방정식 추정)

  • 이병구;오상진;모정만
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1991.04a
    • /
    • pp.159-161
    • /
    • 1991
  • 보는 토목, 건설, 기계, 선박, 항공등 각종 구조공학 관련분야에서 가장 기본이 되는 구조단위 중에 하나이다. 구조물에서 단면을 변단면으로 하는 경우에는 재료가 절약되는 경제적 잇점이 있을 뿐만 아니라 미적 감각등 여러가지 이유로 변단면을 많이 사용하는 추세이다. 이 논문은 변단면 보의 자유진동을 해석한 결과를 통계적으로 처리하여 변단면 보의 고유진동수를 산정할 수 있는 고유진동수 방정식을 추정하는데 연구목적이 있다.

  • PDF

Estimating of Optimal Allowed Distance for Reducing Vibration and Noise Problems by Pile Driving after Drilling Method in Deep Foundation Work (천공 후 말뚝타격공법의 진동 $\cdot$ 소음 문제 해소를 위한 적정 이격거리 산정 방안 연구)

  • Park Hong-Tae;Kang Lee-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.152-163
    • /
    • 2005
  • Pile driving work causes a vibration problem in the construction site using pile foundation and often causes civil affairs by construction noise around the construction site. For the vibration and noise problems, the driving after drilling method rather than the direct driving method is being generalized for reducing vibration and noise. However, this method also causes civil affairs when the driving work is operated in adjacent area. This study suggests a criterion for evaluating an optimal allowed distance for pile driving work by the driving after drilling method. Actual surveys of vibration and noise for pile driving work in seven construction sites were used for developing regression analysis equations. The results can be a standard to estimate the allowed distance to avoid vibration and noise problems in pile driving work for deep foundation.

A case study of application Finecker Plus in field (미진동 파쇄기의 현장 적용에 관한 연구)

  • Min Hyung-Dong;Lee Yun-Jae;Song Young-Seok;Kwon O-Sung;Park Yun-Seok
    • Proceedings of the KSEE Conference
    • /
    • 2004.08a
    • /
    • pp.49-75
    • /
    • 2004
  • 소음진동 규제법의 강화, 각종 건설민원 발생 및 안전강화 관리 차원에서 현재 국내 터파기 현장 및 각종 토공사에서 종래 시행되어지던 발파공법만으로 시행하는 것은 곤란하다. 건설교통부 설계 지침에서도 진동 규제치의 차이를 두어 파쇄와 발파와의 차이를 확연히 구분하는 실정이다. 기존에 발파는 그 경험이 많아 효과적인 방법 등이 널리 알려져 있지만 파쇄의 경우는 그 시공사례가 많지 않아 그 연구의 필요성이 대두되고 있다. 본 연구는 건교부에서 제시한 암파쇄굴착공법에 사용되어지는 미진동 파쇄기에 대한 연구로써 연암, 보통암, 경암지역에서의 전색제, 적정 패턴, 진동 특성 등을 분석하는데 그 목적이 있다. 시험은 크게 1, 2 타입으로 구분하여 실시하였으며 1타입의 경우는 천공장이 1.5m(180g 장약)이고, 2타입의 경우는 2.5m(360g)이다. 두 패턴을 기본으로 저항선, 공간격을 달리하여 시험을 진행하면서 그에 따르는 진동 및 파쇄정도의 차이를 관찰할 수 있었으며 암석 강도별 예상 진동식을 제안하였다.

  • PDF

A Study on the Construction Vibrations Prediction of Bridge Structures using the Reliability Index (신뢰성 지수를 이용한 교량 구조물의 건설진동 예측에 관한 연구)

  • 박연수;우정하;전양배;김응록;김동현
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.442-449
    • /
    • 2003
  • This study presents a new analysis of blast vibration equations of a bridge structures using a reliability index. Changing the reliability makes each blast vibration equation. The blast equations are divided into three classes, having 50%, 90% and 99.9% at ${\beta}$=0, 1.28 and 3 respectively. In the result of this research, the assumption equations which used ${\beta}$=1.28 is suitable. By using these blast equations, it is possible for users to predict reliable ground vibration values upon demand.

  • PDF

The study on the tunnel double-deck blasting methods using electronic blasting systems (더블데크 전자발파를 이용한 터널 발파공법 개발 연구)

  • Lee, Jong-U;Mun, Hong-Pyo;Kim, Nam-Su;Lee, Gang-Il
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.23 no.4
    • /
    • pp.38-48
    • /
    • 2021
  • 최근 국내 건설현장들은 도심지 근접구간에서 발파진동피해를 최소화하기 위하여 전자뇌관을 이용한 미진동 전자발파공법 적용사례가 증가하고 있는 추세이다. 그러나 미진동 전자발파는 무진동 암파쇄 대체공법으로 경제성은 우수하나 시공현장에서 진동을 제어하는 공법으로 1회 굴진장을 1m 이하로 적용하고 있어 시공속도가 저하되는 문제점이 발생하고 있다. 따라서, 미진동 전자발파 수준의 진동제어와 굴착비 절감 및 시공속도를 높일 수 있는 더블데크 발파공법을 연구 및 시험을 수행하였다. 미진동 전자발파와 더블데크 전자발파 비교 시험결과 진동레벨, 발파효율, 파쇄입도, 여굴량 등이 비슷한 수준으로 평가되어 현장 적용시 굴진장 증대로 인한 공사기간 단축 및 시공비 절감이 가능할 것으로 판단되었다.