• Title/Summary/Keyword: 건설 지자체

Search Result 253, Processing Time 0.025 seconds

A Plan to Strengthen the Role of Citizens as Co-Creators of Smart City Services - Focused on the Development of Function Issue Card Technology - (스마트도시서비스 공동창의자로서의 시민 역할 강화 방안 - 기능카드 기법 개발을 중심으로 -)

  • JI, Sang-Tae;PARK, Jun-Ho;PARK, Joung-Woo;NAM, Kwang-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.2
    • /
    • pp.1-11
    • /
    • 2021
  • Lately, the Korean Government has gradually expanded participation by local residents who are users of the area in the smart city project for the construction of region specialization smart city service (hereinafter called "Smart Service") and the enhancement in the citizen's awareness. However, due to the lack of information on smart service-related technology, there has been a limitation in getting the specific opinion of citizens in the process of designing the Smart Service. In this study, reports made by 4 four local governments which were selected for implementation of 2019 "Smart Town Challenge Projects" were reviewed to diagnose the actualization level of the smart service suggested by citizens through the living lab. The analysis results show that though the smart service plan was established by using diverse design thinking methodology through the living lab, there was a limitation in having citizens design the specific functions of the smart service. So, this study suggests the function issue card technique which can be used by modulating and freely combining four elements such as information collection, processing, supplying method and technique of the smart service and the service contents. This function issue card technique was directly applied to the living lab of the smart city project to verify its effectiveness. It was found that through this technique, citizens can combine the functions and contents of the smart service to materialize smart services at the level of detailed functions. The function issue card technique suggested in this study is expected to contribute to the actualization of opinions for the role of citizens as co-creators in solving local problems in the citizen participation type smart city plan in the future, thus helping the design of the regional specialization smart service.

A Study on the Parking Supply and Management Strategics for Multi-Family Housing Sites (공동주택 주차공급 및 관리방안 연구)

  • 안정근
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.2
    • /
    • pp.41-53
    • /
    • 1999
  • The rate of automobile ownerships has been increased significantly in multi-family housing sites so that government has made new parking regulations increasing the rate of parking supply by the high demand of parking lots in multi-family housing sites. However, the new regulation of parking supply has several problems that it applies to only new multi-family housing sites and disregards to the locational distinctions around the sites. It also has reduced to the open spaces in the sites and increased the price of housing units especially to the small size units of multi-family housing sites by increasing the number of underground parking lots. Furthermore, the residents have not been equal opportunity to access their parking lots even though they have been charged to equal amount of financial burden for the construction of underground parking lots. This research aims to relieve above problems by analysing parking supply and demand management strategies both domestic and foreign countries, and suggest to new parking management system for multi-family housing sites in 21st Centuries. This research reveals that most of multi-family housing sites want to be applied 1) diverse parking supply regulations considering the locational distinctions of sites, 2) parking lot ownership programs, 3) charging parking fees to second vehicles, 4) increasing parking lots both in the sites and around the sites, 5) enforcing police power to the parking violation vehicles to their sites. Especially, the multi-family housing sites consisting of small & medium size of units and locating in small & medium size of cites strongly want to be accepted new Parking regulations considered their locational and social distinctions and applied police power to the parking violation vehicles in their sites compared to the other multi-family housing sites.

  • PDF

Study on Redesign of Landscape Architect Certification Requirements by Utilizing NCS (국가직무능력표준을 활용한 조경분야 자격종목 재설계 방안 연구)

  • Baek, Jeong-Hee;Kim, Kyu-Seoub;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.5
    • /
    • pp.129-139
    • /
    • 2012
  • Recent changes in landscape architectural field, such as keen attention on central and local government, checks of other related fields, circumstances both inside and outside the construction industry, assume hostile attitude towards qualification system in landscape architecture. By securing the original function of qualification meets the environmental changes and accords to the technical development, practicality and serviceability of qualification as well as credit rating and professional status can be enforced. Framework redesign on landscape architecture National Technical Qualifications(NTQ) is required in order to meet the demand in the industrial fields and to reflect the technical changes. National Competency Standards(NCS) was selected as a precedent study to enhance the practicality and serviceability of NTQ as well as to avoid duplication on qualified requirements. It would provide a model to redesign the framework of landscape architecture NTQ. In this study, questions in NCS and in landscape architecture certification are compared and analyzed to review the suitability of the present landscape architecture certification items. In conclusion, the creation of master landscape architect under the present system, and the subdivision of the technician's license level to planting technician and the facility are recommended. The ability units to be qualified for each level, which would be used for future NTQ standards and university curriculums in relevant fields, are also suggested in this study.

A study on the realtime renewal and update of digital map using general survey (일반측량 성과도를 활용한수치지도의 실시간 수정갱신 체계화 연구)

  • Lee Sang-Gil;Kwon Jay-Hyoun;Yang Hyo-Jin;Cho Seong-Kil
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2006.05a
    • /
    • pp.146-151
    • /
    • 2006
  • 현재 국가지리정보유통망을 통해 유통되고 있는 수치지도(Digital map)는 대부분 항공 측량사진(Air survey Photographs)이나 위성영상(Satellite images)을 통해 취득된 토지 피복의 형상을 기반으로 제작된 지도들이다. 정사사진으로부터 취득된 지형정보를 기호화, 단순화한 수치지도는 실제 사물의 형태와 많은 차이가 있어 지형과 시설물의 변이를 사실대로 반영하지 못한다. 특히 최근 들어 지하시설물이나 건축기술의 발달로 층별 구조가 다양해진 건축물의 형태 등은 정사사진으로는 식별이 불가능하고 건물의 경우 지붕의 형태로 묘사되는 등 표현에 한계가 있다. 도심지역을 대상으로 제작된 1/1,000수치지형도나 일부 지자체나 공공기관 등에서 제작된 $1/500{\sim}1/2,500$ 수치지형도는 상세한 지형정보를 포함하고 있는 높은 정밀도의 수치지도이지만, 도시지역의 변이가 빠르게 일어나고 있기 때문에 자료 신뢰성과 최신성을 유지하는데 한계가 있다. 따라서 본 연구는 현지조사나 측량에 의존하고 있는 정사사진으로부터 취득이 불가능한 지형자료의 취득이나 수년단위인 갱신주기의 한계를 극복하고 실시간으로 수치지도를 수정갱신 할 수 있는 대안으로 일반측량성과도의 활용방안을 제시하고자 한다. 일반측량업에서 생산되는 일반측량성과도는 임시 도근점에 의해 측량을 실시하고 지적경계점과 현황기지점을 도해법에 의해 지적도와 중첩시켜 제작한 측량도로서, 일반측량 성과도에 절대좌표체계를 부여하고 수치지도와 매칭 기법을 제시함으로서 경제적이고 신속한 실시간 수치지도 수정갱신체계를 확립할 수 있고, 자료의 공유함으로써 중복측량을 방지할 수 있다.보 등)를 활용, 구축된다. 교통분석용 네트워크는 구축시점에 따라 현재 및 장래 네트워크로 구분되며 장래 네트워크는 기준년도부터 2031년까지 5년 단위로 계획된 장래도로를 반영하여 구축된다. 교통주제도 및 교통분석용 네트워크는 국가교통DB구축사업을 통해 구축된 자료로서 교통체계효율화법 제9조의4에 따라 공공기관이 교통정책 및 계획수립 등에 활용할 수 있도록 제공하고 있다. 건설교통부의 승인절차를 거쳐 제공하며 활용 후에는 갱신자료 및 활용결과를 통보하는 과정을 거치도록 되어있다. 교통주제도는 국가의 교통정책결정과 관련분야의 기초자료로서 다양하게 활용되고 있으며, 특히 ITS 노드/링크 기본지도로 활용되는 등 교통 분야의 중요한 지리정보로서 구축되고 있다..20{\pm}0.37L$, 72시간에 $1.33{\pm}0.33L$로 유의한 차이를 보였으므로(F=6.153, P=0.004), 술 후 폐환기능 회복에 효과가 있다. 4) 실험군과 대조군의 수술 후 노력성 폐활량은 수술 후 72시간에서 실험군이 $1.90{\pm}0.61L$, 대조군이 $1.51{\pm}0.38L$로 유의한 차이를 보였다(t=2.620, P=0.013). 5) 실험군과 대조군의 수술 후 일초 노력성 호기량은 수술 후 24시간에서 $1.33{\pm}0.56L,\;1.00{\ge}0.28L$로 유의한 차이를 보였고(t=2.530, P=0.017), 술 후 72시간에서 $1.72{\pm}0.65L,\;1.33{\pm}0.3L$로 유의한 차이를 보였다(t=2.540, P=0.016). 6) 대상자의

  • PDF

The Slope Stabilization of Solid Waste Landfill Liner System (폐기물매립장의 사면차수체계 안정화 연구)

  • Shin, Eunchul;Kim, Jongin;Park, Jeongjun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.3
    • /
    • pp.21-28
    • /
    • 2009
  • As the natural aggregates such as sand and clay are getting exhausted, the quantity of utilizing geosynthetics is being increased in the solid waste landfill. Especially, the waste landfills have been constructed at the gorge in the mountainous area and reclaimed land from the sea in the Korean Peninsula. Those areas are not favorable for construction of waste landfill in geotechnical engineering aspect. In this study, the frictional characteristics of geosynthetics that used in the waste landfill were estimated. Then, the studies of the behavior of geosynthetics and stability of LDCRS (Leachate Detection, Collection, and Removal System) of side slope were conducted in the waste landfill by means of the pilot test, and numerical analysis. Geocomposite which is combined type or separated type is influenced on the strain itself, and also implicated in the stress and strain of geomembrane at the lower layer. The strain on the combined type of geocomposite is about 50% smaller than that of the separated type at the side slope. The lateral displacement and settlement of top at the slope with the separated type are three times greater than that of the combined type. In the numerical analysis, discontinuous plans in between ground and geosynthetic, geosynthetic and geosynthetic, goesynthetic and waste have been modeled with the interface element. The results gave a good agreement with the field large-scale model test. The relative displacements of geosynthetics were also investigated and hence the interface modeling of liner system is appropriate for analysis of geosynthetics liner system in the waste landfill.

  • PDF

Plans for the Integrated Operation of Intelligent Service Facilities (지능화시설의 통합운영 방안)

  • YIM, Du-Hyun;PARK, Jeong-Woo;NAM, Kwang-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.1
    • /
    • pp.127-136
    • /
    • 2017
  • U-City laws are divided into three categories: intellectual laws, information superhighway laws, and integrated operation center laws. Previous studies have suggested that efficient infrastructure operation and management is necessary in Ubiquitous-City (U-City). However, infrastructure is often interpreted differently by different laws. The purpose of this study was to plan for the integrated operation of intelligent service facilities by comprehensively analyzing the law system of domestic intelligent service facilities and problems in operation and management based on this critical mind. For this, present conditions and problems of intelligent service facilities were found through interviews with people who are in charge of the law system and other practitioners. The necessity of integrated use, including city information generated from intelligent service facilities and installment locations, has been demonstrated. Government ministries and local governments have established various information systems using ICT and U-City laws that specify integrated management and operation, but do not clearly specify definitions for the specific responsibility and authority for main agents participating in facility operation. A system is needed to smoothly mediate the relevant divisions so that they can use installed equipment simultaneously for efficient operation in generating city information. This objective of this study was to prepare a unitary law system for efficient installment and management of intelligent service facilities by establishing a logically linked relationship among the relevant laws and regulations. This will provide a foundation for a management system that has an integrated linkage of intelligent service facilities.

Numerical Investigation on Structural Behavior of a Lid with Stiffeners for Suction-installed Cofferdams (석션 가물막이 보강 상판의 구조 거동에 대한 수치해석 연구)

  • Kim, Jeongsoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.7-17
    • /
    • 2019
  • With increasing demand for large offshore infrastructures, suction cofferdams have been large, and the lid stiffener arrangement for a suction cofferdam has become a key element in cofferdam design to constrain the flexural deformation effectively. This study analyzed the changes in the structural behavior of a lid for a suction cofferdam due to lid stiffeners to provide insights into effective stiffener arrangements. By investigating conventional suction anchors, several stiffener patterns of a lid for a polygonal suction cofferdam were determined and analyzed. The structural performance of the stiffened lids was estimated by comparing the stress and deformation, and the reaction distributions on the edge of lid were investigated to analyze the effects of the stiffener arrangement on the lid-wall interface. Finite element analysis showed that radial stiffeners contribute dominantly to decreasing the stress and vertical deflection of the lids, but the stiffeners cause an increase in shear forces between the lid and wall; the forces are concentrated on the lid near the areas reinforced with radial stiffeners, which is negative to lid-wall connection design. On the other hand, inner and outer circumferential stiffeners show little reinforcement effects in themselves, while they can help reduce the stress and deformation when arranged with partial radial stiffeners simultaneously.

Analysis of Coastline Changes in Yeongdong Region Using Aerial Photos and CORONA Satellite Images (항공사진과 CORONA 위성영상을 이용한 영동지역 해안선 변화 분석)

  • Ahn, Seunghyo;Kim, Gihong;Lee, Hanna
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.187-193
    • /
    • 2022
  • In the Yeongdong region of Gangwon-do, coastal areas are important resources in terms of cultural, social and economic aspects. However, the coast of Gangwon-do is experiencing severe erosion, and it is concerned that its adverse effects will gradually increase. In this study, coastline changes of Yangyang and Gangneung in Gangwon-do were tracked and analyzed over a long period of time. In order to build time series image data, aerial photos from the 1940s to the present were mainly used, and data from CORONA satellite, which operated from the 1960s to the early 1970s, were collected and used together. Using 51cm resolution ortho image and 2m resolution Digital Elevation Model(DEM) as reference, ground control points were selected to perform geometric correction on the aerial photos and CORONA images. Subsequently, Canny edge detector applied to these images to extract the coastlines. As a result of analyzing the extracted and vectorized coastlines by overlaying them in chronological order, erosion and deposition occurring around the artificial structures and on the nearby beaches were observed. In this study, the effect of seasonal variation, tide, and various coastal management including the beach filling were not considered. Because coastal erosion is greatly affected by geographic factors, each local government must find its own solution. Continuous research and local data accumulation are required.

Natural, Nature-based Features (NNbF) - A Comparative Analysis with Nature-based Solutions (NbS) and Assessment of Its Applicability to Korea (자연/자연기반 특징(NNbF) - 자연기반해법(NbS)과 비교분석 및 국내적용성 평가)

  • Hyoseop Woo
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.2
    • /
    • pp.31-39
    • /
    • 2023
  • NNbF is a newly emerging approach to reduce flood risk in coastal and fluvial areas using natural features or engineered nature-based features with the expectation of co-benefits of provisional, regulating, and socio-cultural services provided by the ecosystem. NNbF is not quite different from existing, related terms based on nature, such as NbS, Eco-DRR, NI, GI, EwN, and BwN, for all these terms include expectation of benefits for human societies by directly utilizing or mimicking nature's ecological functions. If we focus on the comprehensiveness of each term's subject and object, we can say that NbS > NNbF > (Eco-DRR, NI/GI). Among the 18 measures introduced in the NNbF International Guideline in the river and floodplain management category, it was found that measures of wash lands and floodplain restoration, including levee setback/removal and side-channel restoration, seemed to be the most applicable to rivers in Korea. These selected measures could be more effective when river managers purchase riparian lands along river courses by relevant laws for river water-quality protection.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.