• Title/Summary/Keyword: 건설 정보 모델링

Search Result 232, Processing Time 0.02 seconds

Dynamic Performance Evaluation of New Type PSC Railroad Bridges (신형식 PSC 철도교량의 동적성능 평가)

  • Choi, Sanghyun
    • Journal of the Society of Disaster Information
    • /
    • v.7 no.4
    • /
    • pp.259-265
    • /
    • 2011
  • After the commercial opening of the KTX in 2005, the high speed railroad has been rapidly emerged as the major transportation means due to its high energy efficiency. Recently, the government has announced its plan to build the future transportation system around the high speed railroad. Based on this policy, the existing lines as well as the lines under construction or design are planning to increase design speed. In this paper, the suitability of the mid-span PSC girder bridges for the high speed railroad is evaluated via dynamic analysis. IT, Precom, and WPC girder bridges are considered for the purpose of this study and, for comparison, the identical modeling method and the analysis technique are utilized. The performance indices used for dynamic performance evaluation are the natural frequency, the vertical displacement, the end axial displacement, track irregularity, etc. The KTX train is utilized as a dynamic load, and the dynamic analysis is performed up to the train speed of 420km/hr with the increment of 10km/hr.

Development of BIM based Maintenance Management Prototype System for Wastewater Treatment Plant (BIM 기반 하수처리시설 유지관리 프로토타입 시스템 개발)

  • Um, Dong-Yong;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1901-1910
    • /
    • 2014
  • Current domestic and overseas BIM practice and research efforts show very few examples that design and construction BIM data could be successfully used for efficient operation and maintenance (O&M) of infrastructure in particular. This study takes public wastewater treatment plant requiring an enhancement of operation and maintenance capability into account to develop a prototype BIM-based maintenance management system. The system is designed and implemented following a typical system development procedure and validated by the system outputs per four scenarios being considered to be main maintenance activities: The research results are expected to contribute to the upgrade of current wastewater treatment plant maintenance level, which is more demanded as water-related regulation and policy direction changes to region-based large scale O&M and asset management adoption, and overseas market participation.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

Development of BIM Templates for Vest-Pocket Park Landscape Design (소공원의 조경설계를 위한 BIM 템플릿 개발)

  • Seo, Young-hoon;Kim, Dong-pil;Moon, Ho-Gyeong
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.1
    • /
    • pp.40-50
    • /
    • 2016
  • A BIM, which is being applied actively to the construction and civil construction industries, is a technology that can maximize efficiency of various sectors from initial planning and design, construction, and maintenance, to demolition; however, it is in the introductory phase in the field of domestic landscaping. In order to introduce and promote BIM in the field of landscape design, this study developed a prototype of a library and template and analyzed the performance of trial application. For the development of a prototype, annotations and types were analyzed from floor plans of existing small parks, and components of landscape template were deduced. Based on this, play facilities, pergola, and benches were madeintofamily and templates, making automatic design possible. In addition, annotations and tags that are often used in landscape design were made, and a 3D view was materialized through visibility/graphic reassignment. As for tables and quantities, boundary stone table, mounding table, summary sheet of quantities, table of contents, and summary sheet of packaging quantities were grouped and connected with floor plans; regarding landscaping trees, classification criteria and name of trees that are suitable for domestic situations were applied. A landscape template was created to enable the library file format(rfa) that can be mounted on a building with BIM programs. As for problems that arose after the trial application of the prepared template, some CAD files could not be imported; also, while writing tables, the basis of calculation could not be made automatically. Regarding this, it is thought that functions of a BIM program and template need improvement.

A Study on the Realization of Dust Damage Compensation Calculation for the Prevention of Dust Damage in Construction Site (공사장 먼지피해 예방을 위한 먼지피해 배상액 산정 현실화 방안 연구)

  • Kim, Jinho
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.374-385
    • /
    • 2022
  • Purpose: Even if a damage is applied to the dust of the construction site containing the first-class carcinogen, it is dismissed or 5~30% of the amount of noise damage compensation is paid., Because of such loopholes, some construction companies are neglecting the dust management of the construction site, and the damage of the workers and the residents in the construction site continues. Method: The purpose of this study is to examine the problems of the calculation criteria of damage compensation amount of construction site dust, the measurement of dust concentration, the analysis of measurement data (the data of electric signboard measuring device by the mining scattering method), the prediction and evaluation methods such as modeling, and to suggest improvement measures. Result: It is found that it is impossible to calculate the amount of damages from dust damage in the construction site by calculating the current dust damage compensation amount and dust concentration modeling and measurement. Conclusion: It will receive an application for compensation for damage within the site where damage is expected (about 100m in the straight line and the boundary line of the site), and present a method of calculating the amount of compensation that differentially evaluates dust damage to the degree of dust management and compliance with dust-related legal standards.

3D GIS의 기술 동향

  • Lee, Ji-Yeong
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2010.06a
    • /
    • pp.185-185
    • /
    • 2010
  • 문명 발전에 의해 생활공간이 더욱더 복잡해짐에 따라 현실 세계의 3차원 공간으로서의 이해가 필요해졌고, 3차원 공간을 효율적으로 관리 및 분석하기 위하여 3차원 GIS에 대한 중요성이 대두되기 시작하였다. 현재까지의 3차원 GIS는 1990년대에 들어서 3차원 가상도시의 등장으로 도시 모델의 3차원 가시화에 대해 많은 연구가 진행되어 왔다. 이러한 3차원 가상도시는 도시 관리 차원에서 도시공간의 표현, 분석, 모델링, 시뮬레이션 등을 통하여 도시정보의 체계적이고 효율적인 관리를 가능하게 한다. 3D GIS 기술의 활용 사례로는 3차원 도시 경관 분석 및 도시 계획, 3차원 시뮬레이션, 3차원 위치기반 서비스, 도시 행정 관리 등이 있다. 3차원 도시 경관 분석 및 도시 계획 활용 분야에서는 3차원 GIS를 활용하여 새롭게 건설되는 건물들이나 토지 이용 변경에 따른 경관 분석을 가상공간에서 시뮬레이션 분석함으로써 경관 변화 예측 및 적합한 경관 설계에 대한 분석을 한다. 3차원 시뮬레이션의 경우 환경오염도 분석, 최적의 입지선정, 개발 전후의 경관 차이, 각종 재난에 따른 위험도 분석, 경관과 일조량 분석 등을 미리 가상도시에 시뮬레이션 함으로서 불필요한 업무를 줄일 수 있고 발생할 수 있는 결과 값을 예상할 수 있다. 3차원 위치기반 서비스의 경우 자신의 위치를 비교적 정확히 측정함으로서 생소한 도시를 방문하거나 위치를 찾아갈 경우 최단 경로 및 최적 경로를 탐색할 수 있다. 앞으로의 3차원 GIS 기술 동향으로 유비쿼터스 환경에서의 시공간분석(Temporal GIS)과 3차원 실내공간인지 기술 개발 등으로 볼수있다. 시공간분석은 시공간 질의를 통한 공간정보의 시간에 다른 변화 계산 또는 예측된 결과를 분석할 수 있고, 시공간 분석에 사용되는 공간적, 시간적 정보의 조합은 적어도 3차원 이상의 정보를 나타내기 때문에 필요에 따라 다양한 결과를 산출 할 수 있다. 종합적으로 시공간분석은 GIS의 분석 범위를 넓혀 주며 실시간 GIS 응용시스템 개발을 위한 주요 과업이다. 3차원 실내공간정보 표현기법과 공간분석 및 공간인지 기법을 이용한 통한 유비쿼터스 환경에서의 3차원 실내공간인지 기술 개발을 통해 최근 공간정보를 기반으로 한 위치기반서비스내 u-서비스 즉, 인간 행태의 분석, 관리 및 응용을 지원하도록 한다 이는 위치기반서비스 사용자의 주변상황에 대한 인지능력을 향상시켜주고 최근 사회적 이슈가 되고 있는 U-City의 성공여부에 직접적인 영향을 미칠것이다. 이를 위해 다음과 같은 기술개발이 수행되어야 할것이다. 첫째로, 공간인지 기술을 위한 3차원 실내공간표현 방법 개발, 둘째로, 3차원 실내공간정보를 이용한 공간분석 및 공간인지 기법 개발, 마지막으로 유비쿼터스 환경에서 3차원 실내공간인지를 위한 미들웨어 개발을 통해서 공간정보의 활용을 macro-scale 공간에서 micro-scale로 확산될 것이다. 그러므로, 본 세미나를 통해서, 3차원 GIS의 활용의 보편화와 대중화를 위해서는 3차원 데이터 획득 및 처리 방법, 3차원 공간데이타베이스, 공간 분석 및 가시화에 대한 기술적 이슈들을 논하고자 한다.

  • PDF

Study on Damage Information Management Plan for Maintenance and Operation of River Facilities (하천시설 유지운영을 위한 손상정보 관리방안 연구)

  • Joo, Jae-Ha;Nam, Jeung-Yong;Kim, Tae-Hyung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.9-18
    • /
    • 2021
  • Recently, the rapid proliferation, introduction, and application of the fourth industrial revolution technology has emerged as a trend in the construction market. Building Information Model (BIM) technology is a multidimensional information system that forms the basis of the fourth industrial revolution technology. The river sector utilizing this information-based system is also being actively reviewed, for example, the current measures for maintenance. In recent years, active research and current work should be done to reflect the need for river experts to introduce BIM into the river field. In addition, the development of tools and support software for establishing various information systems is essential for the activation of facility maintenance information systems reflecting advanced technology and to establish and operate management plans. A study on the maintenance of river facilities involves using existing drawings to build a three-dimensional (3D) information model, check the damage utilizing it, and inform it, and utilize it as the data for maintenance reinforcement. This study involved determining a method to build a river facility without the existing information system and using the property maintenance information with 3D modeling to provide a more effective and highly utilized management plan to check maintenance operations and manage damages.

Using the Binomial Option Pricing Model for Strategic Sales of CER's to Improve the Economic Feasibility of CDM projects (이항옵션가격 모형을 활용한 CER 판매전략 구축과 이를 통한 CDM 사업 수익성 향상 방안에 관한 연구)

  • Koo, Bonsang;Park, Jong-Ho;Kim, Cheong-Woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.111-121
    • /
    • 2014
  • The Clean Development Mechanism (CDM) allows New & Renewable Energy projects to make additional income by selling CER's, which represent the amount of Green House Gases(GHG) that is reduced in the project. However, forward contracts used to hedge fluctuating market prices does not allow projects to sell CER's at a premium. As an alternate approach to maximize CER revenue, CER's are modeled as a 'real option', in which CER's are sold only above the desired sales price. Using the Binomial Option Pricing model, the resultant lattices are used to determine whether to sell, defer or abandon the option at individual nodes. Overlaying Pascal's Triangle on the lattices also enabled the calculation of the annual probabilities for deferring CER sales without incurring downside losses. Application to an actual Landfill Gas project showed increased overall NPV, and that CER sales could be deferred at a maximum of 2 years. The proposed framework allows transparency in the analysis and provides valuable and strategical information when making investment decisions related to CER sales of CDM projects.

A feasibility modeling of potential dam site for hydroelectricity based on ASTGTM DEM data (ASTGTM 전지구 DEM 기반의 수력발전댐 적지분석 사전모델링)

  • Jang, Wonjin;Lee, Yonggwan;Kim, Seongjoon
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.545-555
    • /
    • 2020
  • A feasibility modeling for potential hydroelectric dam site selection was suggested using 1 sec ASTGTM (ASTER Global Digital Elevation Model) and Terra/Aqua MODIS (Moderate Resolution Imaging Spectroradiometer) derived land use (MCD12Q1) data. The modeling includes DEM pre-processing of peak, sink, and flat, river network generation, watershed delineation and segmentation, terrain analysis of stream cross section and reservoir storage, and estimation of submerged area for compensation. The modeling algorithms were developed using Python and as an open source GIS. When a user-defined stream point is selected, the model evaluates potential hydroelectric head, reservoir surface area and storage capacity curve, watershed time of concentration from DEM, and compensation area from land use data. The model was tested for 4 locations of already constructed Buhang, BohyunMountain, Sungdeok, and Yeongju dams. The modeling results obtained maximum possible heads of 37.0, 67.0, 73.0, 42.0 m, surface areas of 1.81, 2.4, 2.8, 8.8 ㎢, storages of 35.9, 68.0, 91.3, 168.3×106 ㎥ respectively. BohyunMountain and Sungdeok show validity but in case of Buhang and Yeongju dams have maximum head errors. These errors came from the stream generation error due to ASTGTM. So, wrong dam watershed boundary limit the head. This study showed a possibility to estimate potential hydroelectric dam sites before field investigation especially for overseas project.