The Dispute Resolution Method on The FIDIC Form of Construction Projects (건설 사업에서 FIDIC 규정의 분쟁해결 방법)

  • Lee Moo-Jong
    • Journal of Arbitration Studies
    • /
    • v.16 no.2
    • /
    • pp.239-264
    • /
    • 2006
  • Globalization of business activities and the market is making intern ational movement of capital much freer. Therefore the introduction of global standard is inevitable. Each and every country has had its own standard which restrain free exchange and cause misunderstanding and conflict between countries. A country or a company which is not capable of meeting the global standard can not be accepted in the global market. Consequently, it will eventually be left behind. It is right to say that countries and companies should accept the global standard and abide by it to survive in the competitive global market. The following preface which was introduced in the international conference co_organised by BAC, FTCTC and Tsinghua University in May, 2004 shows a timely movement for the globalization of construction business. *B A C, Beijing Arbitration Commission *FTCTC, The FIDIC-Tsinghua-CNAEC Training Center *CNAEC, China National Association of Engineering Consultants Introduction, As arbitration becomes more and more popular in the ways of alternative disputes resolution all over the world, the BAC is devoted to promoting international arbitration in China. As FIDIC contracts constitute an accepted point of reference for international construction contract, the BAC, characteristic of construction projects, is willing to facilitate the FIDIC contracts as the referred construction contracts in China. In order to carry out its purposes, the BAC, together with FTCTC is going to convene for discussion of dispute resolution and arbitration of international construction projects. FIDIC, construction contract management guide, explains arbitration as the ultimate dispute resolution method. The detail of FIDIC will be suggested in this essay.

  • PDF

The Effective Process of Apartment Housing Defect Management Using Smart Device (스마트 기기를 활용한 공동주택 하자 관리의 효율화 방안)

  • Suh, Jung-Il;Lee, Jae-Woong;Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • Recently, apartment housing tends to increase 3-4% every year by economic growth and development of construction technology in domestic construction industry. According to this tendency, construction enterprises are providing high-quality and various residential space, and residents also want high-quality apartment housing without any defect. Construction company make efforts to decrease construction defects in order to satisfy all the residents, and to improve company value. However, it is impossible to have no defect in construction because construction works are combination of many different complicated process. Because of the responsibility for the defect, conflicts between construction company and residents have been occurred. This study suggests defects management method that can be used from defect register phase to defect repair phase with a function of smart-device of the high penetration rate. The effectiveness use of the suggested method might save defects maintenance time and improve resident satisfaction about construction quality.

The Development of Noise Management Model using Active Noise Control Technique on Construction Site (능동소음제어를 이용한 건설현장의 소음관리모델 개발 - 도심지 공사현장을 중심으로 -)

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Ahn, Joseph;Kim, Sunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Recently, many people have been damaged seriously by construction noise. Accordingly, there have been increased the complaints and disputes. These complaints should be controlled strictly. Otherwise there could be delays or stops of project and losses of time and money. For this reasons, the Korean government is trying to convert from depending on the soundproof wall to noise control system focusing on noise sources. However, it is difficult to control the noise which is generated from construction site because construction equipment has very high noise level and construction noise generates temporarily and irregularly. Also, people do not know how much low frequency affect human body adversely because they cannot perceive low frequency noise easily. Hence, recently developed countries have conducted the research on the low frequency noise which damages on human physically and mentally. However, passive noise control is insufficient to reduce the low frequency noise, but only efficient to lower the high frequency noise. Thus, an approach which can complement limitations of passive noise control is needed. Therefore, the purpose of this research is to suggest the noise management model using active noise control on construction site. Also, ANC simulation has been conducted to examine its applicability on construction equipment. As a result, it is expected that there will be a reduction of construction noise and demages, as well as both mental and physical damages.

필리핀의 중재제도 고찰 (OVERVIEW OF ARBITRATION IN THE PHILIPPINES)

  • Panga Jr., Salvador S.
    • Journal of Arbitration Studies
    • /
    • v.19 no.2
    • /
    • pp.179-195
    • /
    • 2009
  • 필리핀의 중재제도를 규정하고 있는 법령은 다음과 같다. 즉 필리핀 민법(법률 제386호), 중재법(법률 제876호), 대체분쟁해결법(법률 제9285호), 국제상거래중재에 관한 국제 연합 국제상거래법위원회(UNCITRAL) 표준법 및 건설산업중재에 관한 대통령령(제1008호)이다. 2004년의 대체적 분쟁해결 제도(ADR) 에 관련된 필리핀 의회의 입법은 필리핀의 중재 실무와 절차에 광범위한 변화를 가져 왔다. 또한 국제중재실무에서 필리핀에 많은 도움을 주었다. 다른 한편으로는 상당한 변화를 가진 UNCITRAL 표준법의 채택과 국내 중재를 관장하는 법률속에 표준법 조항을 편입함으로써 필리핀은 분쟁해결의 대체안으로써 정책 결정의 실행에 대한 중재법의 인식과 ADR법에 있어서의 정책조문의 검토로 보다 실질적인 중재제도가 정착되는 기반을 조성하게 되었다. 국내에서 수행하고 있는 국제적인 중재는 아직까지는 비교적 적다고 생각된다. 그러나 ADR법 내에 규정된 강력한 ADR찬성정책과 ADR에 관대하고 특히 중재에 호의적인 대법원의 친중재적 판결로 인해 향후 수년내에 필리핀과 주변국과의 무역이 크게 증대될 것으로 전망된다.

  • PDF

Improvement of Apportioning Responsibility for the Time Extension in Construction Projects (건설공사 공기연장 책임구분의 문제점 및 개선방안 제시)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.60-67
    • /
    • 2007
  • Cases of the time extension have continuously transpired in the public construction projects. The potential of economical loss and claims is increased because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for the time extension. Therefore, this paper aimed to improvement of apportioning responsibility for the time extension in construction projects.

  • PDF

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF

Assessment of the Effectiveness of Unfair Trading Prevention Acts in Construction Industry (건설공사 불공정거래 방지제도 실효성 평가 및 개선방안)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.65-73
    • /
    • 2018
  • Since unfair trading practices between participants in construction project are common, the government has enforced several policies and systems to prevent or minimize the unfair trading practices in construction industry. However, not much attention has been paid to figure out which policies or acts are working or not. This paper analyzed the effectiveness of the policies and acts which are being implemented to prevent unfair trading practices and provided several suggestions to improve the performance of those acts. Survey was conducted to industry experts to collect data regarding their perceptions on those policies and acts. Then the effectiveness of the policies and acts were analyzed in terms of their importance and performance through IPA (Importance-Performance Analysis) based on the survey result. It was found through IPA that execution related acts such as investigation, exposure, and punishment for unfair trading practice have shown low effectiveness in entire construction process and dispute arbitration and mediation related center operated by authority showed low performance too. To improve the effectiveness of those acts, dispute arbitration system improvement, investigation & reporting system consolidation and enhancement practical binding force of punishment and penalty were suggested. Most of all, rules and culture for fair trading should become more established in construction industry by preventing conflict among participants through active communication.

Survey on the Crack Defects of R.C. Buildings. (콘크리트 건축구조물의 균열하자에 대한 설문조사)

  • Hong, Gun-Ho;Seo, Min-Choul;Choi, Oan-Chul
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.551-552
    • /
    • 2009
  • These days in execution of building works are increasing possibility of defect occurrences. On this, construction safety policy has been enforcing prevention for fault construction. But argument in relation to defects is increasing every day, because regulations for defects are abstract and uncertain. Therefore we analyzed patterns and reasons of defect, researched into question for rational solution about defect responsibility and responsibility period of a warranty in argument.

  • PDF

Research about sharing of compensation data between owner and contractor for construction CALS improvement (건설CALS 완성도 제고를 위한 다양한 이해당사자간 보상자료 공유방안 연구)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2010.06b
    • /
    • pp.144-147
    • /
    • 2010
  • 국토해양부에서는 건설산업의 투명성을 제고하고 생산성을 향상시키기 위해 1990년대 후반부터 건설사업정보화(CALS : Continuous Acquisition and Life-cycle Support) 사업을 진행중에 있다. CALS는 제조업의 모든 상품, 즉 주요장비 또는 다양한 상품 등을 획득하기 위한 설계, 생산과정, 또는 보급, 조달 및 이를 운영하는 운용지원과정을 연결시키고, 이들 과정에서 사용되는 각종 정보를 표준이라는 공통 창구를 통해 디지털화하여 컴퓨터상으로 정보를 통합하여 자동화시키는 개념이다. 이는 컴퓨터 네트워크를 이용해 상호 교환이 이루어지는 자동화되고 통합된 환경으로 변환시키는 정부와 기업간의 경영전략이라고 볼 수 있다. 이러한 개념에서 확장된 건설CALS는 건설공사 전 과정, 즉 기획, 설계, 조달, 시공, 유지보수 등의 과정에서 발생하는 각종 정보를 다양한 이해당사자가 교환하고 공유하기 위한 개념으로 출발하였으며, 현재 이를 지원하기 위한 5개의 단위시스템을 개발하여 운영중에 있다. 이중 용지보상시스템은 건설공사의 업무중에 시공단계에서 이루어지는 보상업무를 지원하는 시스템이다. 보상업무는 건설사업 과정 중에서 민원인과 직접대면하는 일이 많고, 액수도 클 뿐만 아니라 개인의 소유권과 밀접한 관계가 있기 때문에 분쟁의 소지가 매우 많다. 이에 본 논문에서는 보상업무 수행시 다양한 이해당사간의 각종 보상자료 교환체계 확립을 통한 업무 선진화방안 제시를 통해 업무의 투명성을 최대화하고 민원을 최소화하여, 보상업무 담당자에게는 업무의 효율성을 제고하고 민원인들에게는 국가행정에 대한 신뢰도를 높일 수 있는 보상업무 선진화 방안을 제시하고자 한다.

  • PDF

An Analysis of China's Approach to Shared Rivers: Focusing on Factors of Dam projects at the Yaluzangbu River Basin (중국의 공유하천 접근방식 분석 -중국의 야루짱부(아로장포(雅魯藏布))강 댐 건설 요인을 중심으로-)

  • An, Seon-Young;Park, Sung-Je;Ryu, Si-Saeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.841-845
    • /
    • 2012
  • 최근 중국과 인도는 공유하천인 야루짱부(중국명: 아로장포(雅魯藏布), 인도명:Brahmaputra)강 유역 내 수력발전용 댐 건설을 놓고 갈등 중이다. 발단은 중국이 2010년 9월에 정식으로 착공한 짱무수력발전댐(장목수전참(藏木水電站))의 건설이다. 총길이 3,848km, 유역면적 71만여 $km^2$인 야루짱부강은 중국과 인도, 방글라데시, 부탄 4개국이 공유하고 있다. 야루짱부강의 발원지는 히말라야 산맥 북쪽 기슭의 지에마양쫑 빙하(걸마앙종(杰馬央宗) 빙천(冰川))이고 중국내 길이가 2,057km에 달한다. 강은 중국의 씨짱(서장(西藏))지역, 인도의 아루나찰 프라데시(Arunachal Pradesh)주와 아쌈(Assam)주를 경유하여 부탄, 방글라데시로 흐른다. 야루짱부강은 티베트로 잘 알려진 시짱자치구에서 발원하여 중국과 인도의 영토 분쟁지역인 아루나찰 프라데시주를 관통함으로 인해 지정학적으로 중요한 의미를 갖고 있다. 짱무수력발전댐은 시짱 지역 최대 수력개발댐으로, 인도와 방글라데시는 중국의 댐 건설로 인해 자국의 수자원의 감소와 생태계 파괴가 발생할 것을 우려하고 있다. 그러나 최근 중국과 인도의 관방은 이 같은 우려를 부인하며 인도의 아루나찰 연방당국 또한 5개 주요 지류에 1,750MW 규모의 수력발전댐을 건설할 계획을 발표하였다. 이와 같이 수력발전댐 건설과 수자원확보를 놓고 중국과 인도가 팽팽하게 경쟁하게 된 데는 중국과 인도 간의 역내 힘겨루기와 자국 내 정치적 이해, 영토분쟁지역의 존재 등이 원인으로 작용하고 있다. 본 연구는 중국의 짱무수력발전댐(장목수전참(藏木水電站)) 건설원인을 중국정부가 가진 시짱지역관리 및 개발의 필요성에서 찾고 짱무수력발전댐(장목수전참(藏木水電站)) 건설에 드러난 중국의 표면적, 내재적 의도의 분석을 통해 중국의 공유하천 접근 방식의 특징과 원인을 규명하였다. 발원지에 위치한 중국이 수자원확보경쟁에서 유리한 입장을 점하고 있는 가운데 중국에 비해 상대적으로 정치적, 경제적 열세에 놓인 하류국가들은 공유하천의 동등하게 이용할 권리를 쟁취하기 위해 필요한 협상력을 갖고 있지 못하다. 따라서 하류국가들은 중국의 의도를 파악하여 이를 토대로 적절한 대안을 마련해야 할 필요성이 있다. 중국의 공유하천접근방식의 원인과 특징에 대한 분석은 남북통일 후 중국과 하천을 공유하게 될 우리나라에 시사하는 바가 클 것이라 생각된다.

  • PDF