The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

Guideline for Web 2.0 Cluster based Process and Performance Management System (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 구축에 따른 운영방안 제시)

  • Ong, Ho-Kyoung;Ahn, Jae-Gyu;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.899-904
    • /
    • 2007
  • Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.

  • PDF

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

The State of Art of RFID Technology for Construction Project in Korea (RFID 기술의 국내적용 실태)

  • Chang, Sang-Hyeok;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.819-822
    • /
    • 2007
  • Recently, U-Construction is a topic word of construction industry. U-construction is construction with IT technology that is ubiquitous. That will help that domestic construction industry which is lower technology than developed countries overcomes the competition. RFID technology which can be transmission of massage and the receipt of a massage with non touch is core of U-construction. The RFID technology has a big range of application. Man ${\cdot}$ Quality ${\cdot}$ Process ${\cdot}$ Safety ${\cdot}$ Distribution management is already applied to construction industry and especially, The Man ${\cdot}$ Safety management are spreaded widely. This thesis analyzes that the State of Art of RFID Technology to Construction in Korea through the survey and RFID Technology becoming wider by construction scale and period. Process' Distribution management show the trend which becomes wider by construction scale and period.

  • PDF

건설기계임대차 표준계약서 제정, 시행

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.216
    • /
    • pp.52-55
    • /
    • 2008
  • 공정거래위원회가 건설기계임대차 분야에 있어서 불평등한 계약관행을 개선하고 공정한 거래질서를 확립하기 위해 최근 "건설기계임대차 표준계약서"를 제정했다. 이에 따라 국토부는 지난 6월 10일 산하 공공기관 관계자 등과 간담회를 갖고 표준약관으로 제정된 건설기계임대차 표준계약서가 공사대장의 작성.비치.관리와 함께 공사현장에서 널리 사용, 정착되어 건설공사의 투명성이 제고될 수 있도록 적극적인 협조를 당부했다. 이번에 제정된 건설기계임대차 표준계약서는 지난 해 대한설비건설협회를 비롯한 4개 단체와 국토해양부가 협의를 거쳐 공정위에 건설기계임대차 표준계약서 표준 약관을 공정위에 심사, 청구한 것을 공정위가 승인한 것이다.

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

A Study on the Development of Construction Progress Management system based on BIM (BIM 기반의 건설공사 진척관리 시스템 개발을 위한 기초연구)

  • Shin, Yoon-Kyung;Kim, Sun-Hyo;Park, Sung-Han;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.525-528
    • /
    • 2010
  • 본 논문은 BIM기반 건설공사 진척관리 시스템의 개발 방향을 제안하는 것이다. 이를 위해 일차적으로 기존 4D 진척관리프로그램인 Synchro 4D와 Navisworks를 분석을 하여 문제점을 도출했다. 이를 극복하고자 국내실정에 맞는 방안 및 공정과 3D객체 연계의 효과적 방안을 제안하였고 예상공정과 실제공정의 시각적 비교 기능 및 통합건설정보관리 기능 추가를 제시하여 이 프로그램의 본 목적인 효율성 증진을 위해 향상된 진척관리 방식을 제안하고자 하였다.

  • PDF

SaaS-based construction process transfer and Safety Management System (SaaS기반의 건설공정전송 및 안전관리 시스템)

  • Kim, Eui-ryong;Jung, Soo-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.735-737
    • /
    • 2015
  • In this paper, SaaS (Software as a Service) based transport and construction process safety management systems by utilizing the construction work process management and safety management and schedule, and results for various types of construction process, achieved through high-speed wireless Internet access by applying to ensure a systematic means for safety and can quickly and accurately manage all made within the process control system. The operator should be indicated by using a smart phone to work as a supervisor report the current status and results of the operation. Also be reported to the supervisor immediately in an emergency situation and there is no vibration occurs over a period of time the smartphone is to check the danger to the operator. If the commissioner is directed to specific business processes that establish and verify the results obtained and the result is satisfied by presenting the part down the measures insufficient command of the field workers risk situations. In the case of software (server) to store all the data relating to the operation member in charge of management and security.