• Title/Summary/Keyword: 건설제도

Search Result 1,282, Processing Time 0.026 seconds

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

A Basic Study on the Methodology to Introduce Warranty Contracting for Pavements in Korea (도로포장 성능보증(Warranty) 계약제도 도입방안에 관한 기초연구)

  • Kim, Tae-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.66-74
    • /
    • 2008
  • Warranty contracting for pavements construction has been widely used in Europeans countries, Japan, and the U.S. and the benefits of warranty contract has been proven. This research investigated the European, U.S., and Japanese warranty contract policies and compared pros and cons. The most appropriate warranty contract policy solution is developed to fit in the Korean construction industry culture. Three main conclusions have been developed in this study: (1) performance specifications should be developed; (2) the systematic method is required to estimate the appropriate costs of performance bond and warranty period, etc.; and (3) short and long term plans for adopting performance warranty contract in Korea are suggested.

A Study of the Introduction and Application of Partnering to the Alternative Dispute Resolution(ADR) (재판 외 분쟁해결제도로서의 파트너링 도입에 관한 연구)

  • Lee Tai Sik;Jeong Hyun Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.329-332
    • /
    • 2001
  • Alternative dispute resolution(ADR) techniques, like negotiation, arbitration, meditation, have been used to resolve dispute in Korea construction industry with litigation. Nowadays, in construction, there are growing numbers of disputing cases, because of the different viewpoint of the owner and the constructor, great demand of opening market, and bad construction business situation. As the name implies, ADR plays an important roles after disputes have already arisen. This paper suggests the one of the solutions that prevents disputes befor they have been occurred. There are some proves that the partnering has a substantial effect on reducing disputes and time reduction and improving communication among the parties. This paper proposes the partnering model for the one of preventive methods to solve disputes.

  • PDF

CM Market Revitalization Strategies in Domestic Public Construction Projects based on Questionaries and Delphi Techniques (델파이기법을 이용한 국내 공공공사 용역형 CM 시장의 활성화 전략)

  • Oh, Se-Wook;Han, Seung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.131-142
    • /
    • 2012
  • Since CM for Fee has been introduced in domestic market of construction industry, Construction Management(CM) has been familiar with one of the established delivery systems in Korea. However, CM(CM for Fee) construction market has been stagnant consistently due to recent economic recessions. The fundamental causes of the current depression of CM construction market are highly related to the social/environmental factors(such as owner's negative perception about CM services, exclusive formation of the CM markets, unfeasible fee and limitations on technology developments in CM services) and the shortage of institutions associated with CM. Accordingly, fundamental improvements on the CM environment are required. This study suggests the feasible methods for improvement on CM system based on fundamental analysis of problems related to the environmental factors by conducting a delphi technique with professional personnels on various positions in CM markets.

Analysis of Construction Management Market Using System Thinking (시스템 사고를 이용한 건설사업관리 시장 영향요인 분석)

  • Kim, Yoon-Woo;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.239-245
    • /
    • 2012
  • The necessity of professional construction management has been increased as a construction project is getting larger, more complex and specialized. Thus, the CM market has steadily expanded since 1996 in Korea. Despite the external expanding of the CM market, experts claim that domestic CM regulations and infrastructures should be revised. Therefore, this paper developed a causal map which consists of elements vitalizing CM market. Then, the simulation model using NUMBER (Normalized Unit Modeling by Elementary Relationships) to predict the size of the CM market is established. As a result, in the case of more regulation related CM, the quantity of CM projects could not reach of construction supervision until 2020. This paper can be used as a baseline providing a prospection of the change of CM market according to causal relation between the improvement as well as the base of revitalization research of CM market based on non-institutional factors change.

A Study on Optimal CM Service and Practice Considering the Characteristic of Owner (발주자의 특성을 고려한 CM업무 최적 활용에 관한 연구)

  • Kim Hae-Sun;Park Young-Ho;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.638-641
    • /
    • 2003
  • This paper suggests that construction management services should be performed considering the owner's and the project's characteristics through the examples of the successful projects. For this study, the critical CM services in each phase regarding schedule management, cost management and information management are presented and the problems of the CM delivery system in Korea are analyzed with respect to policies, users, suppliers/CMrs and construction environments. Besides, the situation of the delivery systems in Korea and the differences of each delivery system are presented. It is concluded that, for the settlement of CM delivery system in public construction market and, ultimately, the successful execution as an agent of the owner, CMr should diversify the services and give the optimum CM services appropriate for each project's characteristics.

  • PDF

Adjustment of Contract Price according to Introduction of Pay Adjustment (건설공사 지불규정제도 도입에 따른 공사비조정방안)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.175-180
    • /
    • 2010
  • Despite continuous efforts by the construction industry to achieve better quality, it doesn't seem that much has been improved. This is mainly because current specifications do not satisfy a change in the market environment, which is that a higher level of quality is now demanded by users. Quality improvement efforts have been satisfied merely to meet specifications. On the other hand, advanced countries have been experienced great success in their construction techniques and have reduced costs by introducing apay adjustment system to the construction industry, in which compensation is based on performance. Following their example, Koreashould introduce such a pay adjustment system in order to motivate the members of our construction industry to achieve better quality and a higher level of construction techniques. However, there has been a lack of a rational approach to the development of a system for cost coordination, as well as performance and quality inspection. Thus, in this study a legal and logical plan was developed that can be used to adjust the construction cost, along with the performance inspection of quality results, in order to introduce a pay adjustment system that is appropriate for domestic regulations.

Market effects analysis of when lowering the threshold value of construction services under WTO GPA (WTO 정부조달협정 건설서비스 양허하한선 인하시의 건설시장 변화와 대응방안)

  • Moon, Hyuk;Kim, Myeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.72-82
    • /
    • 2009
  • Lowering threshold value of construction services is extremely sensitive issue to the small and medium enterprises in construction industry. Because it means opening the construction markets where the small and medium construction companies compete intensely. Nevertheless, it is absent that the analysis on the effect of opening the market lowering threshold value of construction services under Government Procurement Agreements or Free Trade Agreement. This research is to analyze the effects of lowering threshold value of construction service which have been agenda repeatedly in the international agreements such as WTO and FTA. The current threshold value of construction services of Korea under WTO GPA are 5million SDR where the government delivers and 15million SDR where the local government or the public institution deliver. However major parties to an entente such as USA and EU have been demanding to lower threshold value of 15 million SDR where the local government or the public institution deliver to 5million SDR. The analysis figure the effect of this lowering threshold value to be a market reduction by 2trillion Won as '07 fiscal year basis. This market shrinkage will effect to the small and medium construction companies in local considerably.

가스시설 기술기준

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.314
    • /
    • pp.73-84
    • /
    • 2016
  • 최근 기술개발과 건설시장의 다양화로 가스설비공사 분야의 성능기준과 제도 및 법령도 빠르고 다양하게 변하고 있다. 이에 따라 가스법령 및 KGS코드에 대한 이해와 올바른 시공방법, 기술기준 등을 현장에서도 쉽게 이해하고 편리하게 활용할 수 있도록 한국토지주택공사에서 일목요연하게 정리한 자료를 게재한다.

  • PDF