• Title/Summary/Keyword: 건설제도

Search Result 1,282, Processing Time 0.027 seconds

성장 동력 확보를 위한 한국 건설 산업의 선택

  • Ha, Yu-Jeong
    • 주택과사람들
    • /
    • s.210
    • /
    • pp.12-13
    • /
    • 2007
  • 한국건설경영협회 주최로 10월18일 오후 2시, 서울 중구 태평로 프레스센터 19층 회의실에서 한국건설경영협회 창립 15주년을 기념해 '성장 동력 확보를 위한 한국 건설 산업의 선택' 토론회가 개최됐다. 이번 토론회에서는 한국 건설 산업의 지속적인 발전과 1등 산업 성장방안을 모색하기 위해 '경영 패러다임', '초일류 건설 기업', '글로벌 건설 제도' 등 3개 분야의 주제 발표와 토론이 이어졌다.

  • PDF

Improvement the bidding system in domestic construction engineering procurement (국내 건설 엔지니어링 입 ${\cdot}$ 낙찰 제도 개선방안 연구)

  • Choi, Bong-Gun;Park, Sung-Je;Joh, Hoon-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.632-637
    • /
    • 2006
  • Our country's bidding system had made the lowest price successful bid system in foundation before introducing eligibility review system at July, 1995, and a averaged- price successful bid system or the restrictive-lowest price successful bid system had been enforced by repletion. However, they were introduced as dumping that do not reach in direct cost level of construction cost is generalized and worry about illegal construction practices rises by the lowest price successful bid system. According as they had not been promoted construction company's technical development effort or cost reduction effort, vicious circle that advocate competition principle again and recur as the lowest price successful bid system is repeated last 50 years. Therefore, I present improvement direction that can satisfy all Global Standard and real condition of our country through foreign countries example analysis to cope with the rapidly changing building circumstances socially and economically to correspond actively to the construction industry's reorganization to reconsider domestic construction engineering's competitive power.

  • PDF

법령과고시 1 - 하도급거래 공정화에 관한 법률 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.278
    • /
    • pp.38-43
    • /
    • 2013
  • 대한설비건설협회는 하도급자인 회원사의 권리보호와 원도급자의 불법 불공정 하도급 거래행위를 개선코자 국회, 국토교통부, 공정거래위원회 등 여러 관련 부처에 지속적으로 제도개선을 추진하고 있다. 특히, 원도급자가 하도급자에게 일방적으로 불이익을 강요하는 부당한 특약을 설정하거나, 원도급자의 하도급지급보증 사고발생 시 하도급자의 보증금 청구에도 보증기관이 보증금을 지급하지 않아 하도급자인 회원사의 피해가 빈번함에 따라 제도개선을 추진해 왔다. 이러한 노력으로 최근 공정거래위원회에서는 하도급법을 개정하여 하도급공사의 부당특약 금지조항을 신설하고, 하도급대금지급 보증기관의 보증금 지급사유를 법률에 명시하게 됐다.

  • PDF

법령과 고시 ②-국가를 당사자로 하는 계약에 관한 법률 시행령 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.192
    • /
    • pp.35-38
    • /
    • 2006
  • 국가를 당사자로하는 계약에 관한 법률 시행령∙시행규칙 및 회계예규가 일부 개정되었다. 이번에 개정된 주요 내용은 입찰참가자격 사전심사 대상의 확대 및 의무화, 최저가낙찰제 대상공사의 확대, 건설재해 및 제재처분 사항 관련 신인도 평가제도 개선(본지 법령과 고시① 참조), 공사의 현장설명제의 보완, 계약이행보증방법의 변경제도 도입, 부정당업자의 입찰참가자격 제한 범위 확대, 입찰방법 심의기구의 일원화 등이다. 본지는 국가계약법 시행령∙시행규칙 및 회계예규의 주요 개정 내용을 게재한다.

  • PDF

저가수주공사에 대한 이해와 대처 방안 (1)-국가공사 계약제도의 일반적 이해와 건설보증의 역할

  • 김형선
    • 월간 기계설비
    • /
    • no.10 s.219
    • /
    • pp.99-106
    • /
    • 2008
  • 최근 경기침체로 인한 건설사의 도산으로 설비업계의 어려움이 가중됨에 따라 공제조합에 대한 보증금 청구가 급격하게 증가하고 있어 조합의 부담이 커지고 있다. 이러한 사태는 고유가에 따른 원자재 가격 상승이 가장 큰 원인이나 "저가수주"도 한 몫 하고 있어 조합원 스스로 자정이 필요하다는 여론이 대두되고 있다. 이러한 문제를 근원적으로 해결하기 위한 방법 중 하나로 현행제도의 이해와 문제점 사례, 문제해결을 위한 방안 등을 자세히 알 필요가 있다. 본지는 '저가수주공사에 대한 이해와 대처방안'을 5회에 걸쳐 연재 할 계획이다.

  • PDF

Operation Plan of the Certification System for the Construction Information Standard -From the Construction CALS Standard- (건설사업정보 표준 인증을 위한 운영방안 마련 -건설CALS 표준의 관점에서-)

  • Moon, Jin-Seok;Won, Ji-Sun
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.12
    • /
    • pp.459-470
    • /
    • 2012
  • Information technical dependence degree is coming to be high from constructive information-oriented field. The size and complexity of constructive information are increasing and consequently, the standard for a construction information resource management becomes important. Currently the certification about construction information standard is being enforced part system and information-oriented level etc. from domestic. So we have a plan which will propel the diffusion strategy for the practical application of constructive information standard with introduction of the certification system about construction information standard. For a certification system preparation, we studied a feature and definition about construction information standard and analyzed domestic and foreign case. From that, we accomplished a classification and an analysis about construction information standard becomes the object of certification. And then, we selected the object of the certification through deriving necessities of certification about each construction information standard and considering the priority at the time of introduction. Finally we suggested an certification institutional operation plan about the object which is selected. Held a consultation meeting about the fact where the professional knowledge or technique is demanded and established secured directivity about authentication institutional operation plan and professionalism.

The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

Overview of PI Systems in the United States and its Application to Korea (미국의 PI제도 및 국내도입 방안)

  • Kim, Tae-Wan;Yun, Seong-Soon;Kwon, Young-In
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.57-64
    • /
    • 2005
  • Recently, several national construction projects such as Chunsung Mt. section of Kyungbu High Speed Rail or Sapae Tunnel of Seoul Outer Ring Road have been delayed or suspended due to the objections of residents or environmental organizations. Considering the development of democracy, increased public participation and interests on environmental issues in Korea, the generation of these social conflicts may be natural phenomenon. However, it is necessary to find measures to effectively implement major construction project and save costs related to social conflicts. In this paper, PI techniques in the United States are investigated and in comparison, the weakness and improvement plans for Korea's current public participation system have been suggested.

An Enhanced Operating Scheme of Evaluation System for Construction Works -Focused on the KNHC System (시공평가제도의 효과적 운영방안 -대한주택공사 제도를 중심으로)

  • Choi Jin-Woo;Jung Sang-Bong;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-284
    • /
    • 2001
  • The owner's evaluation system about the contractor's work performance is used to give the contractor some advantages or disadvantages. According to the result of evaluation of the contractor's performance in the given construction project, the owner identify the good contractors and give them some merits in the future project bidding. However, the system used in the Korean construction industry has caused many problems and has been operated improperly. As a case study, this paper investigates the current problems existed in the KNHC (Korean National Housing Corporation) evaluation system and suggests some directions for its efficient operation. In doing so, the study performed interviews with the KNHC officers and the related contractors, using a structured questionnaire

  • PDF

건설노무관리 프로그램 개발-아성정보(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.8 s.193
    • /
    • pp.58-60
    • /
    • 2006
  • 정부가 소득양극화 해소(EITC제도 도입)을 목적으로 올해부터 건설일용근로자의 임금지급조서 자료를 관할 세무서에 신고토록 의무화 했다. 올해 홍보기간을 거쳐 내년부터는 의무적으로 시행된다. 이에 따라 설비건설업계는 근로자의 노무관리 프로그램이 절실히 필요한 실정이다. 아성정보(주)가 이러한 시대적 흐름에 발맞추어 건설노무관리프로그램을 개발했다.

  • PDF