• 제목/요약/키워드: 건설재난

검색결과 499건 처리시간 0.024초

건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안 (The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris)

  • 이희선;김동식
    • 한국재난정보학회 논문집
    • /
    • 제4권1호
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발 (A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House)

  • Lee, Yang Kyu;Park, Hong Tae
    • 한국재난정보학회 논문집
    • /
    • 제10권1호
    • /
    • pp.15-24
    • /
    • 2014
  • 본 연구는 설계 과정의 분해, 시공 과정의 조립, 공사비 적산 등 공사의 계획과 관리에 걸친 모든 공사 관리의 업무를 체계화할 수 있는 공동주택의 공사정보분류체계를 제시하였다. 또한, 본 연구는 이 공사정보분류체계를 작업순서에 따라 관계형 데이터베이스(Data Base)로 구축 방법을 제시하였고, 구축된 데이터베이스를 근거로 적산 자동화 시스템 개념 모형을 구축하였다. 이러한 적산 자동화 시스템 개념 모형은 기존 적산 시스템들의 근본적인 문제점이었던 부적절함을 해소하여 공동주택 건설현장에서 효과적으로 적용가능한 과학적인 적산 시스템으로 활용할 수 있을 것이다.

다발형 폴리아미드섬유 보강 콘크리트의 휨거동에 관한 실험적 연구 (A Experimental Study on the Flexural Behavior of Bundle Type Polyamide Fiber Reinforced Concrete)

  • Jeon, Chan Ki;Jeon, Joong Kyu
    • 한국재난정보학회 논문집
    • /
    • 제10권1호
    • /
    • pp.61-70
    • /
    • 2014
  • 일반적으로 건설재료 용도로 많이 사용되고 있는 유기섬유 보강 콘크리트는 섬유 자체의 인장강도 및 탄성계수는 낮지만, 휨거동, 균열에 대한 저항성 및 충격저항성 등의 특성은 우수하며, 내화학성이 뛰어나고 부식의 우려가 없는 것으로 널리 알려져 있다. 최근 해외에서는 유기섬유 보강재를 터널 숏크리트와 프리캐스트 세그먼트 라이닝, 교량 슬래브 및 PC제품 분야에서 일부 활용되고 있으며, 그 종류 또한 다양하다. 본 연구에서는 다발형 폴리아미드섬유를 혼입한 콘크리트의 휨거동 특성을 ASTM C 1609 및 KS F 2566에 준하여 하중-처짐 관계를 도출하여 유기섬유 보강 콘크리트의 적용 가능성을 검토하였다.

재난재해 현장의 지형인지를 위한 통합 센서 모듈 개발 (Development of an Integrated Sensor Module for Terrain Recognition at Disaster Sites)

  • 서명국;윤복중;신희영;이경준
    • 드라이브 ㆍ 컨트롤
    • /
    • 제17권3호
    • /
    • pp.9-14
    • /
    • 2020
  • A special purpose machine with two manipulators and quadruped crawler system is being developed to work at disaster sites where it is intended to quickly respond in the initial stages after the event. In this study, a terrain recognition module is developed so that the above special purpose machine can quickly obtain ground information to help choose its path while recognizing objects in its way, this is intended to enhance the remote driver's limited situational awareness. Terrain recognition modules were developed for two tasks (real-time path guidance, precision terrain measurements). The real-time path guidance analyzes terrain and obstacles while moving, while the precision terrain measurement feature provides more accurate terrain information by precisely measuring the ground in front of the vehicle while stationary. In this study, an air-cooled sensor protection module was developed so that the terrain recognition module can continue its vital tasks in the event of exposure to foreign substances, including scattered dust, mist and rainfall, as well as high temperatures.

재난 현장에서 이종 센서를 활용한 인명 탐지 기술 개발 (Development of Human Detection Technology with Heterogeneous Sensors for use at Disaster Sites)

  • 서명국;윤복중;신희영;이경준
    • 드라이브 ㆍ 컨트롤
    • /
    • 제17권3호
    • /
    • pp.1-8
    • /
    • 2020
  • Recently, a special purpose machine with two manipulators and quadruped crawler system has been developed for rapid life-saving and initial restoration work at disaster sites. This special purpose machine provides the driver with various environmental recognition functions for accurate and rapid task determination. In particular, the human detection technology assists the driver in poor working conditions such as low-light, dust, water vapor, fog, rain, etc. to prevent secondary human accidents when moving and working. In this study, a human detection module is developed to be mounted on a special purpose machine. A thermal sensor and CCD camera were used to detect victims and nearby workers in response to the difficult environmental conditions present at disaster sites. The performance of various AI-based life detection algorithm were verified and then applied to the task of detecting various objects with different postures and exposure conditions. In addition, image visibility improvement technology was applied to further improve the accuracy of human detection.

하자예방을 위한 공동주택의 하자정보DB관리시스템 구축에 관한 연구 (A Study on the Building of Defect Information DB Management System of Apartment House for Defect Prevention)

  • 장효성
    • 한국재난정보학회 논문집
    • /
    • 제9권3호
    • /
    • pp.300-314
    • /
    • 2013
  • 우리 국민의 거주 형태로 아주 큰 비중을 차지하는 공동주택의 하자는 입주민에게 큰 불편과 손실을 초래하고 있다. 그러나 시공사에서 하자정보의 관리에 조금 더 관심을 기울인다면 많은 하자를 사전에 예방할 수 있으리라 판단된다. 이에 본 연구에서는 하자 발생을 방지시키기 위한 개선된 하자정보DB관리시스템을 도출하려 한다. 먼저 대형 건설회사를 대상으로 공동주택의 하자정보DB관리시스템의 현황을 조사하여 개선된 하자정보DB관리시스템의 필요성을 확인하고, 다음으로 설문조사를 통하여 그 결과로써 현재의 하자정보DB관리시스템의 문제점과 개선 필요성을 파악 할 수 있었다. 그리하여 하자정보DB관리시스템의 개선 방안을 도출하였는데 이는 하자 발생의 예방에 도움이 될 것으로 기대된다.

씽크홀(SINKHOLE)과 부력방지 대책인 '영구배수 공법'과의 상관관계 (An Analysis iff the Mutural Relation between Sinkhole and 'Permanent under Draingage System' as A Measure of Non Floating)

  • 권회구
    • 한국재난정보학회:학술대회논문집
    • /
    • 한국재난정보학회 2017년 정기학술대회
    • /
    • pp.257-259
    • /
    • 2017
  • 최근에 국내에서 입법된 "지하안전관리에 관한 특별법"의 지하안전영향평가 등에서 지하매설물 및 굴착공사 관리의 중요성을 강조하고 있지만, 아직까지는 지하를 개발함에 있어 지반의 안전과 관련된 사항은 미흡한 실정으로 도심지 지반침하( Sinkhole) 현상이 매년 증가하고 있다. 그리고 지반침하(Sinkhole)는 발생이 될 경우 인명피해는 물론 도로나 주변 건물들에 막대한 피해를 줄 수 있는 소지가 충분한 대상으로 사료됨에도 불구하고 이러한 현상을 건설현장에서 심각하게 받아들이는 분위기는 어느 곳에서도 감지되지 않는다. 다만 정부부처나 공공기관에서 국회차원의 지대한 관심에 부응하여 이에 대해 광범위한 연구와 조사에 막대한 예산을 투입하여 다방면에서 진행되고 있는 것으로 파악되고 있다. 또한 이러한 연구결과의 자료를 근거로 하여 지반침하 사고의 주요 원인을 조사해본 결과 상하수도관 손상과 무리한 인접굴착공사 및 대부분의 대형건축공사 현장에 채택되고 있는 부력방지 대책의 일환인 영구배수공법의 무분별한 적용을 들 수 있었다. 이러한 상황에서 그 중 비용과 난이도를 고려현장에서 용이하게 저감할 수 있는 방법인 영구배수공법을 선정하여 영구배수공법의 이론적 고찰과 공학적 타당성(구조체 부상방지 안전성 검토기준)을 연구하여 무분별한 영구배수공법 적용으로 지반침하(Sinkhole)가 발생하는 것을 막아 인명피해와 도로나 구조물의 안전성을 확보하고 나아가 영구배수공법 적용으로 항구적 발생하는 천문학적인 유지관리비의 절감이 목적이다.

  • PDF

실적공사비에 의한 지하철 공사비 예측모형에 관한 연구 (A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway)

  • 박종혁;전영배;박홍태
    • 한국재난정보학회 논문집
    • /
    • 제9권1호
    • /
    • pp.11-21
    • /
    • 2013
  • 본 연구는 2004년 이후 도입된 실적 공사비 제도에 의하여 착공된 지하철 건설공사를 대상으로 실적공사비, 공사규모 그리고 시간을 고려하여 공사비를 예측하는 식을 제시하였다. 11개의 지하철공사 자료를 이용하여 지하철 공사비 예측을 위한 비용-규모 지수 n(신뢰범위:0.5~0.7)을 구한 결과, 총공사비 0.713, 순공사비 0.77로 도출되었다. 본 연구에서 제시한 공사비 예측 식 모델은 향후 지하철 공사 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석 (Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제9권2호
    • /
    • pp.164-177
    • /
    • 2013
  • 2010년부터 2013년까지 낙찰자 선정방식이 설계적합 최저가방식, 종합평가방식(입찰가격 조정, 설계점수조정, 가중치기준), 확정금액 최상 설계방식으로 변경되었다. 따라서 이 연구는 국내에서 시행된 변경된 방식에 의한 토목부분 턴키 대안입찰공사의 발주현황, 건수, 수주실적, 낙찰률 범위, 공종별 발주기관별 수주실적, 가중치 낙찰자 수주실적 등의 분석을 통해 국내 낙찰자 결정방식이 건설산업에 미치는 영향, 심의 발주방식 및 운영상의 문제점을 분석하여 제시하였다.

공정관리 과학화를 위한 지하철공사 NAS운영체계 데이터베이스 모델링 구축 (Database Model of Subway Construction NAS Operating System for Scheduling Management Science)

  • Choi, Jaejin;Cho, Byounghoo;Park, Hongtae
    • 한국재난정보학회 논문집
    • /
    • 제13권3호
    • /
    • pp.322-331
    • /
    • 2017
  • 본 연구는 한국건설기술연구원(KICT)에서 제시한 토목공사용 정보분류체계(Information Classification System)를 기반으로 지하철공사의 정보분류체계를 제시하였다. 그리고 이 기준을 근거로 NAS(Network Analysis System) 운영체계인 공사정보분류체계 - 공정도표 - 작업별 투입 자원을 연동하는 데이터 모델링을 구축하여 통합 모형을 제시하였다. 따라서 본 연구에서 제시한 데이터 모델링의 통합모형은 다른 토목시설물공사에서도 동일한 절차와 방법으로 적용할 수 있어, NAS를 기반으로 한 공정관리 과학화를 유도할 수 있을 것으로 확신한다.