Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

The Investigation and Analysis of Field Condition on the Electrical Shock Hazard of Electrical Facilities Used for Temporary Power Supply at Construction Site (임시전력 건설현장에 사용되는 전기설비의 감전위험에 관한 현장실태 조사 및 분석)

  • Gil, Hyoung-Jun;Lee, Bok-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.6
    • /
    • pp.197-204
    • /
    • 2004
  • The temporary power installations are to be used for temporarily supplying power during work at construction sites and have a minimum of protective devices to differ from permanent installations. There are many risk factors caused by loose working environments, deterioration of installations at construction sites. To analyze risk factors of temporary power installations, the investigation and the questionnaire were carried out side by side for power receiving system patch and panel boards, and were performed by researcher, the related expert, engineer of Korea Electrical Safety Corporation all over the country. The objects were variable such as an airport, an apartment, a municipal playground As a result, there are many problems such as a bad lock, poor protection of charging department. Solvable methods are improvement of the related regulation safety education, safety check and so on. In the future, the analytical data can be applied to prevent the electrical shock at construction site, and can be used to stabilize electrical installations.

Monte Carlo Simulation-Based Cost Estimation for Floating Trash Barrier Maintenance (몬테카를로 시뮬레이션 기반 부유 쓰레기 차단막 유지관리 비용 추정 방안)

  • Kim, Seokhwan;Kim, Taegeon;Kim, Hongjo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.2
    • /
    • pp.231-235
    • /
    • 2024
  • Marine debris entering through rivers negatively impacts the environment and poses a direct threat to human health. While barriers to prevent the outflow of floating debris are being installed, attention to their maintenance, especially the scheduling of garbage collection, is insufficient. Currently, maintenance relies on a sequential collection method based on the experience and know-how of field workers, with little systematic research to support it. In response, this study proposes a new feedback-based collection method based on YOLOv7, Monte Carlo simulation for trash collection analysis. The proposed method conducts collection based on the amount of trash detected by remote sensors such as CCTV, and the expected costs are statistically and economically compared using Monte Carlo Simulation (MCS). The results showed that the new collection strategy offers a cost advantage of about 63 % over the existing strategy.

Development of Design Process Management Model using Dependency Structure Matrix for Constructability (시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발)

  • Park, Moon-Seo;Ham, Young-Jib;Lee, Hyun-Soo;Kim, Woo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.65-74
    • /
    • 2010
  • The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.

Application and Adequacy Evaluation of Mobile Sewage Treatment Facilities for Concrete Wastewater Treatment Generated during Construction (공사 중 발생되는 콘크리트 폐수처리를 위한 이동식 오수처리 시설의 적용 및 적정성 평가)

  • Wooseok Jeong;Kyungik Gil
    • Journal of Wetlands Research
    • /
    • v.25 no.2
    • /
    • pp.91-98
    • /
    • 2023
  • Some concrete wastewater generated during construction is in the form of non-point pollution sources that workers, managers, and users are unaware of, and it is not easy to manage as it flows through sewage pipes. Due to these characteristics, construction sludge is inflow into rivers and sewage pipes in the form of non-point pollution sources in an unmanaged state. This study applied the D.W.S method to the concrete retaining wall removal method installed on the road, and the resulting concrete wastewater was physically and chemically treated through a mobile sewage treatment facility, and it was examined whether it met the removal efficiency and wastewater discharge acceptance standards. Accordingly, it is intended to meet the standards for effluent concentration of wastewater during construction by removing 73.5% of BOD and 89.1% of SS through physical and chemical treatment through portable sewage treatment facilities during construction. In addition, we would like to review the adequacy and economic analysis of calculating environmental conservation costs for physicochemical treatment through portable sewage treatment facilities and sewage treatment generated during construction.

Analysis of the Impact of the Expansion of Direct Construction Works and Suggestions on the Application (직접시공 확대의 영향 분석 및 직접시공의무제도 적용을 위한 대응방안 제언)

  • Lee, Meesung;Kim, Siyeon;Yu, Ilhan;Han, Ju-yeon;Son, JeongWook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.15-23
    • /
    • 2021
  • As the construction production system is reorganized as part of the construction industry innovation plan, direct construction is expanding. According to this trend, this study analyzed the impact and problems of the expansion of direct construction through the position of the construction industry and a study of foreign cases. In addition, by diagnosing the impact of the measures to expand direct construction from various aspects, countermeasures were suggested to suitably apply the direct construction mandatory system. Also, for each alternative, effects and problems were evaluated through interviews with experts in policy/administrative and architecture fields. The alternatives for expanding and improving the efficiency of the direct construction mandatory system derived from this study are four items: granting the discretion of the client, differentiation by scale of construction, utilization of construction guarantee system, and introduction of flexible working group leader system. As a result of the expert interview, all of them were evaluated to have a positive impact directly and indirectly on the expansion of direct construction. This study contributes literature to the application of the direct construction mandatory system by examining the current status of direct construction, and suggests a direction for expanding direct construction through deduction of alternatives for applying the direct construction mandatory system and expert evaluation.

Safety Management of Steel Pipe Scaffold using UAV (무인항공기(UAV)를 활용한 건설현장 가시설물 안전관리)

  • Jun, Byong-Hee;Kim, Nam-Gyun;Jun, Kyo-Won;Choi, Bong-Jin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.3
    • /
    • pp.59-67
    • /
    • 2019
  • In this study, the UAV (Unmammed Aerial Vehicle) was applied for the photogrammetry of the construction site and the safety management of steel pipe scaffold. The research site is a temporary facility for building reinforcement on Samcheok Campus of Kangwon National University. The installation condition of the steel pipe scaffold was investigated, and the pillar distance, the beam distance and the wale distance were surveyed. As a result, it was found that the beam distance of the scaffold in the longitudinal direction was in good agreement with the standard, but the pillar distance and the wale distance were found to be less than the standard. Three-dimensional data can be used in drone shooting to enable three-dimensional measurement, so that it is possible to measure facilities hidden or located inside other facilities. Through the drone shooting, the condition of the site can be quickly recorded and the surveying can be carried out without interfering with the work of the field personnel. Although the installation of the temporary structure must be strictly observed to ensure the safety of the workers, it is found that the installation standards are still neglected in the field. In order to prevent this practice, it was thought that the legal system should be supplemented so that it could be checked periodically by using UAV in the field process management.

A Vibration Evaluation and Improvement Scheme for Open Test Blasting (노천시험발파의 진동평가와 개선방안)

  • Kim, Eung-Rok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.310-315
    • /
    • 2017
  • Although studies evaluating the effects of the blasting vibration on the adjacent structures from various angles have continued, cases of securing the safety of the adjacent buildings and researching the proper blasting method for the field condition by analyzing the vibration waveform of the measuring field while performing the open pit blasting are poor. Therefore, it is necessary to present a remedy for blasting pattern selection through test blasting that is appropriate for field conditions, and is economical and efficient. In this study, open pit blasting work was conducted based on the separation distance applied according to the standard blasting method by test blasting and the vibration regulation standard in the road expansion construction site to measure the blasting vibration value, and the vibration prediction equation by blasting methods was examined using a regression analysis computer program to calculate K, N, and R of the confidence level 95%. By setting the blasting allowed vibration standard of the test blasting target area to 0.3cm/sec, and the charring weight and blasting method by the separation distances according to the blasting vibration estimation equation of the open pit blasting guideline and the blasting vibration estimation equation of the test blasting were compared/analyzed, it was possible to identify the factors that increased the working expenses. In addition, the measurement and analysis of the adjacent structures during open pit blasting and the blasting vibration were performed after selecting the most adjacent structure to the open pit blasting spot to analyze the problems on the test blasting procedure and analysis method in the open pit blasting design/construction guidelines, which appeared in the process of completing open pit blasting construction, and a remedy is presented.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

A Study on the Evaluation of Environmental Load Based on LCA Using BIM - Focused on the Case of NATM Tunnel - (BIM을 활용한 LCA기반 환경부하평가에 관한 연구 - NATM 터널 사례 중심으로 -)

  • Lee, Yang-Kyoo;Han, Jung-Geun;Kwon, Suk-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.477-485
    • /
    • 2018
  • To control manage environmental load during construction work, it is required to ascertain an accurate quantity for materials those are using during the construction. In construction industrial nowadays, especially on design part, there are lots of mistakes occurred on quantity take-off between plan documents and actual work. That mistakes are caused by omission of design items, overcount because of interference each materials or simple calculate error. Besides, in case of a construction project, engineers are impossible to design perfectly due to a lot of invalid variable in a construction site. Thus, design errors and changes occur frequently in the process of construction work or design due to such unclear elements. And in case of LCA assessment based on 2D design, there is difficult for an engineer who is in charge to calculate the volume of materials manually using drawings and relevant specifications. This study is aimed for examining and verifying a high reliable method of evaluating environmental load which is useful in construction process through comparing LCA analysis. In addition, this study provides the method of calculating the volume of materials and LCA assessment in working on the basis of 2D design, using the specifications which is used for LCA evaluation, and possibility of utilizing the LCA assessment by introducing BIM design technic to improve the former problem through comparing and analyzing the previous method with 3D-based evaluation process.