• Title/Summary/Keyword: 건설성과

Search Result 1,614, Processing Time 0.029 seconds

Formulating International Entry Strategies for World Bank Consulting Projects Through Country-level Competitive Analysis: A Vietnam Case Study (세계은행 엔지니어링 사업의 국가별 경쟁력 분석을 통한 해외 진출 전략 구축에 관한 연구 - 베트남 사업을 중심으로-)

  • Koo, Bonsang;Shin, Byungjin;Yu, Youngsu;Jung, Jaewon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.57-66
    • /
    • 2017
  • Using bidding data collected from the World Bank's open database, this research performed a series of competitive analyses of the major countries that have participated in the Bank's engineering consulting services contracts in Vietnam. The goal of the analysis was to evaluate the performance of Korean engineering firms to date, and provide strategic recommendations for future projects. Results showed that Korean firms had a high bid acceptance rate, comparable to major developed countries. The success was attributed to the high technical scores in the selection process. Comparatively, financial scores were not competitive and inferior to developing countries such as China and India. Results of a 'Skitmore' analysis revealed that Korea was competitive in medium size projects and were situated between developed and developing countries. Korea thus needs to increase participation in basic and detailed design services, 2) improve labor costs through 'localization' and latest technologies, and 3) and venture into larger sized projects.

A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior (BIM기반 공동주택 마감 물량 산출 정확도 연구)

  • Lee, Moon-Kyu;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.12-22
    • /
    • 2013
  • Construction industry throughout the construction projects life cycle using BIM is able to manage information. Among them, BIM-based quantity take-off is directly connected to the data of the construction business as an important management element that is essential for one of the management factors of feasibility study and economic analysis. In addition, the result of BIM-based quantity take-off can be varied depending on modeler, so the exact guideline for BIM modeling is necessary. The BIM-based quantity take-off in terms of reliability and accuracy of the information is very important. Therefore, this study verified the BIM modeling of the apartment interior materials using both separate object and composite object was validated the quantitative comparison of the difference in BIM-based quantity take-off for accuracy & reliability judgment of BIM-based quantity take-off and realistic & desirable suggestion of BIM modeling way. As the result of this study, it is preferable to model various interior materials to use separate object for the purpose of correct BIM-based quantity take-off, but the realistic way of the BIM modeling using both separate object and composite object jointly was verified in order to judge BIM-based quantity take-off in terms of work productivity.

Performance-Oriented Procurement Process and VE/PSC for Private Finance Initiatives (민간투자사업의 성능중심적 발주방식 및 PSC의 활용방안)

  • Lim Jong-Kwon;Park Heung-Min;Jung Kun-Ho;Woo Ji-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.51-58
    • /
    • 2004
  • The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation

  • PDF

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.

Applicable Building Range for the Introduction of the Building Separation and Dismantling System (건축물 분별해체 제도 도입을 위한 적용 대상 건축물 범위 설정)

  • Park, Ji-Sun;Song, Tae-Hyeob;Choi, Dong-Ho
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.1 no.3
    • /
    • pp.189-196
    • /
    • 2013
  • In order for efficient recycling and eco-friendly treatment of construction waste, there is a need to apply a building separation and dismantling technique early on in the stage of waste generation. This study was conducted to analyze the relevant domestic circumstances and propose the applicable range of buildings in order to introduce a building separation and dismantling system to Korea. For this purpose, related policies and systems implemented overseas and the current situation of buildings were examined, and the workability of separation and dismantling of buildings according to their uses was compared. Also, the economic impact of the separation and dismantling system was examined and a survey was conducted, seeking the opinions of the relevant companies regarding the need for the system and the selection criteria for eligible buildings. Based on the results, it was determined that it would be impossible to apply the separation and dismantling system to all buildings in Korea, considering the current technical power and economic situation, and that the system should be introduced in phases, according to the building classification determined based on floor area and use, as the cost may vary depending on a number of variables including the level of difficulty and field conditions.

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

Characteristics of the Company Town Project in Korea : The FKI's Conception (한국에서 추진하는 기업도치의 성격 : 전경련의 구상을 중심으로)

  • Jang, Young-Jin
    • Journal of the Korean association of regional geographers
    • /
    • v.11 no.3
    • /
    • pp.381-394
    • /
    • 2005
  • There is a little agreement about the characteristics of the company town proposed by the Federation of the Korean Industries(FKI). So the purpose of this study is to figure out the FKI's company town, It is begun with the history and the characteristics of the Western company town and the company town of Japanese type. The process of the company town issue from the first proposal of the FKI is examined. Particularly, the definitions, the examples and the expected effects of the company town in the reports supporting the FKI's proposal are explored. Western company town could be characterized by the economic simplicity and the important role of single firm for supply of jobs, houses, etc. In the light of the results of this study, the FKI's company town was based on the western company town especially in definition, influenced by the company town of Japanese type and then identified with industrial clusters. Consequently there is some disaccordance among the definitions, the examples and the expected effects of the FKI's company town. Giving shape to the FKI's company town project in desirable way, it should be developed in small scale at first, with many related enterprises and public institutions to meet their spatial demand and in related with the other new town projects, for example, future innovative city and innovative cluster.

  • PDF

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.

Landscape Changes Assessment of the National Road-Focused on the National Road in Suburb Areas- (국도의 경관변화 평가-교외지역 국도를 중심으로-)

  • 홍영록;권상준;조태동
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.1
    • /
    • pp.92-102
    • /
    • 2004
  • In this study, landscape changes were examined by periods through the analysis of visual quantity on the landscape components of national road including the mountains, the sky, road pavements, street trees, paddy fields and dry fields, billboard, telegraph pole, building, structure, slope, guard fence, soundproof wall, and median strip etc. For this, subject national road in suburb arreas was selected to grasp its landscape characteristics, and divisional criteria of landscape type of the national road were suggested to look into the trend of landscape changes by periods. Findings of this study are as follows:1.Divisional criteria of landscape type of the national road include location and geometry, structure, land use, perspective, and surrounding buildings of the national road. 2.The highest visual quantity was found in road pavements by periods among landscape components of the national road. It was found that this result has a thread of connection with previous study emphasizing the importance of road geometry as one of landscape components, and road geometry shall be regarded as a visually significant component in analyzing and evaluating landscape of the national road. 3.Most distinguished factors of landscape changes of the national road by periods were median strip(F=33.296) and street tree(F=32.881), and then the sky(F=24.735) and mountain(F=23.477) showed similar level of statistically significant difference. However, statistically significance difference was not found in buildings and structures. 4.It was shown that natural elements decreased gradually but structural landscape made of artificial elements became the main in construction of the national road. This result implies that although the scenic and ecological soundness is recognized in construction of the national road, it is not out of the limitation of functionalities that is, access and mobility.

Analysis of the applicability of parameter estimation methods for a transient storage model (저장대모형의 매개변수 산정을 위한 최적화 기법의 적합성 분석)

  • Noh, Hyoseob;Baek, Donghae;Seo, Il Won
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.10
    • /
    • pp.681-695
    • /
    • 2019
  • A Transient Storage Model (TSM) is one of the most widely used model accounting for complex solute transport in natural river to understanding natural river properties with four TSM key parameters. The TSM parameters are estimated via inverse modeling. Parameter estimation of the TSM is carried out by solving optimization problem about finding best fitted simulation curve with measured curve obtained from tracer test. Several studies have reported uncertainty in parameter estimation from non-convexity of the problem. In this study, we assessed best combination of optimization method and objective function for TSM parameter estimation using Cheong-mi Creek tracer test data. In order to find best optimization setting guaranteeing convergence and speed, Evolutionary Algorithm (EA) based global optimization methods, such as CCE of SCE-UA and MCCE of SP-UCI, and error based objective functions were compared, using Shuffled Complex-Self Adaptive Hybrid EvoLution (SC-SAHEL). Overall results showed that multi-EA SC-SAHEL with Percent Mean Squared Error (PMSE) objective function is the best optimization setting which is fastest and stable method in convergence.