• Title/Summary/Keyword: 건설사업비

Search Result 737, Processing Time 0.028 seconds

Development of a Failure Probability Model based on Operation Data of Thermal Piping Network in District Heating System (지역난방 열배관망 운영데이터 기반의 파손확률 모델 개발)

  • Kim, Hyoung Seok;Kim, Gye Beom;Kim, Lae Hyun
    • Korean Chemical Engineering Research
    • /
    • v.55 no.3
    • /
    • pp.322-331
    • /
    • 2017
  • District heating was first introduced in Korea in 1985. As the service life of the underground thermal piping network has increased for more than 30 years, the maintenance of the underground thermal pipe has become an important issue. A variety of complex technologies are required for periodic inspection and operation management for the maintenance of the aged thermal piping network. Especially, it is required to develop a model that can be used for decision making in order to derive optimal maintenance and replacement point from the economic viewpoint in the field. In this study, the analysis was carried out based on the repair history and accident data at the operation of the thermal pipe network of five districts in the Korea District Heating Corporation. A failure probability model was developed by introducing statistical techniques of qualitative analysis and binomial logistic regression analysis. As a result of qualitative analysis of maintenance history and accident data, the most important cause of pipeline damage was construction erosion, corrosion of pipe and bad material accounted for about 82%. In the statistical model analysis, by setting the separation point of the classification to 0.25, the accuracy of the thermal pipe breakage and non-breakage classification improved to 73.5%. In order to establish the failure probability model, the fitness of the model was verified through the Hosmer and Lemeshow test, the independent test of the independent variables, and the Chi-Square test of the model. According to the results of analysis of the risk of thermal pipe network damage, the highest probability of failure was analyzed as the thermal pipeline constructed by the F construction company in the reducer pipe of less than 250mm, which is more than 10 years on the Seoul area motorway in winter. The results of this study can be used to prioritize maintenance, preventive inspection, and replacement of thermal piping systems. In addition, it will be possible to reduce the frequency of thermal pipeline damage and to use it more aggressively to manage thermal piping network by establishing and coping with accident prevention plan in advance such as inspection and maintenance.

Analysis of Domestic Water Consuming Pattern and Metered Water Use (생활용수 소비패턴 및 실사용량 분석)

  • Kim, Ju Hwan;Cho, Im Young;Park, Noh Heuk;Woo, Hyoung Min;Ahn, Hyo Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1310-1315
    • /
    • 2004
  • 용수수요 추정의 기본은 수도계획에 사용할 수 있는 실사용량에 대한 조사로 이에 대한 자료가 거의 없기 때문에 각 수도사업별로 제시되는 추정방법이 조금씩 상이하며, 추정방법의 진위를 가릴 수 없이 수요추정의 악순환을 초래하고 있는 실정이다. 기존 물사용량 예측은 급수량 기준의 도시 전체에 내한 평균 LPCD를 이용함에 따라 물사용 특성을 충분히 고려찬 수 없어 지역별 실제 물사용량과 큰 오차가 유발되었다. 그러므로 수도계획 및 설계에 사용할 수 있는 신뢰성 있는 설계인자를 도출하기가 불가능하여 물수요 관리정책 수립, 수도요금체계 조정 및 누수방지계획 수립 등 경제적인 수도시설의 건설에 애로를 겪고 있다. 본 연구에서는 생활용수 중 가정용수에 대하여 세탁기, 변기, 싱크대 등 수도전에 유량계를 설치 실제 가정에서 사용하고 있는 용도별 사용량을 실측, 파악하였으며, 이로부터 얻은 용도별 사용량에 대한 기간별 소비특성을 분석하였다. 이로부터 생활용수 사용량의 소비패턴 및 시간대별 부하율 산정이 가능하며, 각종 용도별 사용수량의 소비형태를 찾아낼 수 있었다. 또한 가정용수 중 용도별 물 사용비율은 세탁용수, 변기, 주방, 목욕용수의 순으로 나타났으며 주택유형별로는 아파트 연립주택, 다세대 주택, 단독주택의 순으로 단독주택에서의 물사용량이 가장 적게 나타났다. 생활용수 공급량에 내해서는 시간별, 주별, 월별 그리고 계절변동 총량을 파악하였으며 시간대별로는 오후 3시경이 최대 소비량을 보였고, 주별로는 월요일 그리고 월별로는 7월의 용수사용량이 가장 큰 것으로 조사 되었다. 본 연구로부터 도출된 용도별 실측 물사용량 자료 및 분석결과로부터, 지금까지 공급량 기준의 계획수립이 이루어져왔던 파종 수도시설 규모결정시 합리적인 용수수요예측 및 수요관리가 이루어질 수 있을 것으로 판단되며, 용수수요의 과다예측 오해 해소 등 경제적, 과학적 물관리 정책수립을 위한 기초자료를 제공할 수 있을 것으로 기대된다.는 경제적인 방법이 될 수 있다. 하천수 등의 상호 관계 분석을 통해 장기간의 유역 물순환체계 변화를 분석할 수 있었다.골풀과, 닭의장풀과가 각 1종씩으로, 조사지점( I )보다 좀 더 많은 종이 분포하는 것으로 조사되었다. 또한 어류는 조사지점( I )에서 3회에 걸쳐 총 396개체가 채집되어 3목 8과 21종이었다. 이 중 한국 고유종은 11종이었고, 외래 어종은 검정우럭과 2종이 조사되었으며, Zacco platypus(피라미), Zacco temmincki(갈겨니), Acheilongnathus koreanus(칼납자루), Odontobutis platycephala(동사리), Coreoleuciscus splendidus(쉬리) 순으로 분포하고 있었고, Acheilognathus signifer(묵납자루)는 댐 건설 전에는 많이 분포하였으나 현장조사에서 서식을 확인 할 수 언어 개체수의 큰 감소내지 멸종된 것으로 추정되었다.에서 동시에 시행하였다. 수술 후 1년 내 시행한 심초음파에서 모든 환아에서 단지 경등도 이하의 승모판 폐쇄 부전 소견을 보였다. 수술 후 조기 사망은 없었으며, 합병증으로는 유미흉이 한 명에서 있었다. 술 후 10개월째 허혈성 확장성 심근증이 호전되지 않아 Dor 술식을 시행한 후 사망한 예를 제외한 나머지 6명은 특이 증상 없이 정상 생활 중이다 결론: 좌관상동맥 페동맥이상 기시증은 드물기는 하나, 영유아기에 심근경색 및 허혈성 심근증 또는 선천성 승모판 폐쇄 부전등을 초래하는 심각한 선천성 심질환이다. 그러나 진단 즉시 직접 좌관상동맥-대동맥 이식술로 수술적 교정을 해줌으로써 좋은 성적을 기대할 수 있음을 보여주었다.특히 교사들이 중요하게 인식하는 해방적 행동에 대한 목표를 강조하여 적용할 필요가 있음을 시사하고 있다.교하여 유의한 차이가 관찰되지 않았다. 또한 HSP 환자군에서도 $IL1RN^{*}2$ allele 빈도와 carriage rat

  • PDF

The Optimal Operation on Auxiliary Spillway to Minimize the Flood Damage in Downstream River with Various Outflow Conditions (하류하천의 영향 최소화를 위한 보조 여수로 최적 활용방안 검토)

  • Yoo, Hyung Ju;Joo, Sung Sik;Kwon, Beom Jae;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.2
    • /
    • pp.61-75
    • /
    • 2021
  • Recently, as the occurrence frequency of sudden floods due to climate change increased and the aging of the existing spillway, it is necessary to establish a plan to utilize an auxiliary spillway to minimize the flood damage of downstream rivers. Most studies have been conducted on the review of flow characteristics according to the operation of auxiliary spillway through the hydraulic experiments and numerical modeling. However, the studies on examination of flood damage in the downstream rivers and the stability of the revetment according to the operation of the auxiliary spillway were relatively insufficient in the literature. In this study, the stability of the revetment on the downstream river according to the outflow conditions of the existing and auxiliary spillway was examined by using 3D numerical model, FLOW-3D. The velocity, water surface elevation and shear stress results of FLOW-3D were compared with the permissible velocity and shear stress of design criteria. It was assumed the sluice gate was fully opened. As a result of numerical simulations of various auxiliary spillway operations during flood season, the single operation of the auxiliary spillway showed the reduction effect of maximum velocity and the water surface elevation compared with the single operation of the existing spillway. The stability of the revetment on downstream was satisfied under the condition of outflow less than 45% of the design flood discharge. However, the potential overtopping damage was confirmed in the case of exceeding the 45% of the design flood discharge. Therefore, the simultaneous operation with the existing spillway was important to ensure the stability on design flood discharge condition. As a result of examining the allocation ratio and the total allowable outflow, the reduction effect of maximum velocity was confirmed on the condition, where the amount of outflow on auxiliary spillway was more than that on existing spillway. It is because the flow of downstream rivers was concentrated in the center due to the outflow of existing spillway. The permissible velocity and shear stress were satisfied under the condition of less than 77% of the design flood discharge with simultaneous operation. It was found that the flood damage of downstream rivers can be minimized by setting the amount allocated to the auxiliary spillway to be larger than the amount allocated to the existing spillway for the total outflow with simultaneous operation condition. However, this study only reviewed the flow characteristics around the revetment according to the outflow of spillway under the full opening of the sluice gate condition. Therefore, the various sluice opening conditions and outflow scenarios will be asked to derive more efficient utilization of the auxiliary spillway in th future.

Fish Fauna and Ecological Characteristics of Dark Chub (Zacco temminckii) Population in the Mid-Upper Region of Gam Stream (감천 중 ${\cdot}$ 상류역의 어류상과 갈겨니 (Zacco temminckii) 개체군의 생태학적 특성)

  • Seo, Jin-Won
    • Korean Journal of Ecology and Environment
    • /
    • v.38 no.2 s.112
    • /
    • pp.196-206
    • /
    • 2005
  • The fish community in the mid-upper region of Gam Stream was examined seasonally from 2001 to 2003 in order to perform an environmental impact assessment prior to a construction of Gamcheon Multipurpose Dam. Additional investigation was conducted in August 2004 to confirm the fish fauna reported and to examine the ecological characteristics of Zacco temminckii population. The total number of fish caught from the study sites was 1,081 fish representing 5 families 14 species. There were 6 Korean endemic species including Coreoleuciscus splendidus, Squalidus gracilis majimae, Microphysogobio yaluensis, Liobagrus mediadiposalis, Coreoperca herzi and Odontobutis platycephala, but no endangered or vulnerable species were found. Length-weight relation, condition factor (K) and relative condition factor (Kn) of Zacco temminckii were compared by the study sites and stream. The equations based on length-weight relation in Buhang and Gam Streams were TW\;=\;0.000004TL^{3.2357}$ and TW\;=\;0.000002TL^{3.3566}$, respectively indicating the fish in Gam Stream became more rotund as length increases. The condition factor (K) and relative condition factor (Kn) against total length of Zacco temminckii at two streams indicated that the fish (>70 mm) in Cam Stream (mean K and Kn= 1.116, 1.21 respectively) had better nutritional condition than those in Buhang Stream (mean K and Ln = 1.046, 1.14 respectively). The results were corresponded with natural disturbances such as drought and intensive rainfall from 2001 to 2003 followed by human activities such as stream repair works. Therefore, it is considered to perform environmental impact assessment with not only confirmation of fish composition but also examination of ecological characteristics in population- level.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.

Changes of Street Patterns in Central Part of Taegu City (大邱市 都心部의 街路網 變化)

  • Choi, Seok-Joo
    • Journal of the Korean Geographical Society
    • /
    • v.31 no.3
    • /
    • pp.593-612
    • /
    • 1996
  • This study concern with the changes of street from the Choseon Dynasty to present days around Old-Boundary in Taegu, analyzing the backgrounds of change factors and development trends of the Taegu City. The basis element of a city structure is the street. Therefore, in this study, a chage of street space of a city was investigted. Historically, Taegu was a walled city and had a Mono-nucleus which was restricted by the castle, and served as a starting point of formation of spatial structuure. The form of the artery street took a "T" pattern, othe streets were formed in irregular shapes. As the city grew gradually, the castle was removed on account of diversification in traffic network, change of socio-economic organization in traffic network, change of socio-economic organization, formation of industrial bases and functional distribution. CBD of this city has been located within the area surrounded by these streets. This is a kind of general pattern of traditional walled cities through the world in both Western and Oriental societies. A s the begining of this centry, a 'Dark Ages' descended upon Korea because the country was under the Japanese-Korean Annexation, and, throughout this period, the urban planning was planned exclusively for Japanese. The street pattern within residential areas of Korea took the maze type, in contrast with Japanese residential areas which showed grid pattern of streets. This is another general pattern of almost of all colonial cities especially in Asia. High class residential areas were planned and built by Japanese, and they were located within 5-10 minutes' on-foot distance from the CBD hard core. This high prestige has continued until the 1980s when it occurred land use succession which commerical functions invaded into residential areas. Back in the colonial period, there was a between two hetrogeneous groups due to the fact that the Japanese lived mainly oriented the new railway system but that Koreans still lived along the old highway system which ran through the Korea Peninsula. Street netwook formed in the above process has maintained its shape without great changes after the liberation form the Japanese Colony. Taegu has, accordingly, developed ring-radial network system which has been a combination of radial and ring facilities. The present conditions of street patterns in Taegy mainly depend on 4 rings and 8 radius, with grid pattern street able to be found in Old Boundary.

  • PDF

Laying the Siting of High-Level Radioactive Waste in Public Opinion (고준위 방폐장 입지 선정의 공론화 기초 연구)

  • Lee, Soo-Jang
    • Journal of Environmental Policy
    • /
    • v.7 no.4
    • /
    • pp.105-134
    • /
    • 2008
  • Local opposition and protest constitute single greatest hurdle to the siting of locally unwanted land uses(LULUs), especially siting of high-level radioactive disposal not only throughout Korea but also throughout the industrialized world. It can be attributed mainly to the NIMBYism, equity problem, and lack of participation. These problems are arisen from rational planning process which emphasizes instrumental rationality. But planning is a value-laden political activity, in which substantive rationality is central. To achieve this goals, we need a sound planning process for siting LULUs, which should improve the ability of citizens to influence the decisions that affects them. By a sound planning process, we mean one that is open to citizen input and contains accurate and complete information. In other word, the public is also part of the goal setting process and, as the information and analyses developed by the planners are evaluated by the public, strategies for solutions can be developed through consensus-building. This method is called as a co-operative siting process, and must be structured in order to arrive at publicly acceptable decisions. The followings are decided by consensus-building method. 1. Negotiation will be held? 2. What is the benefits and risks of negotiation? 3. What are solutions when collisions between national interests and local ones come into? 4. What are the agendas? 5. What is the community' role in site selection? 6. Are there incentives to negotiation. 7. Who are the parties to the negotiation? 8. Who will represent the community? 9. What groundwork of negotiation is set up? 10. How do we assure that the community access to information and expert? 11. What happens if negotiation is failed? 12. Is it necessary to trust each other in negotiations? 13. Is a mediator needed in negotiations?

  • PDF