• Title/Summary/Keyword: 건설사업관리

Search Result 1,842, Processing Time 0.021 seconds

A Study on the Smog Reduction Strategies in China (중국의 스모그 저감정책에 대한 고찰)

  • Jeon, So Hyeon;Kim, Yong Pyo
    • Particle and aerosol research
    • /
    • v.11 no.3
    • /
    • pp.63-75
    • /
    • 2015
  • Atmospheric environment in Korea is influenced by outside, especially China. The concentrations of air pollutants in China have showed decreasing trends since 2000. However, these concentration levels in China are still higher than other developed countries. The Chinese Government has tried several measures to control the air pollution. In this study, the details of the amendments and smog reduction strategies in China, especially for Beijing are reviewed and the strategies for Korean side to promote cooperation in Northeast Asia are suggested and discussed. The Chinese State Council amended the Environmental Protection Provisions and Clean Air Act and announced The Action Plan for Air Pollution Control (2013-2017), focusing on three key regions, Beijing-Tianjin-Hebei area (Jing-Jin-Ji), Yangtze River Delta (YRD) and Pearl River Delta (PRD). These policy actions and plan are mainly for the reducing coal usage and emissions from vehicles. It is suggested that, Korea should actively promote multi-national cooperation in the region to take an initiative role in environmental areas.

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF