Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.33-43
/
2014
Goods, services and construction works needed by central government entities, local government entities, and other public institutions are procured with national budget. For efficient budget execution, Article 9 Paragraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter "State Contract Act") provides for the criteria for determining estimated price. Sub-paragraph 2 of the paragraph provides for the "determination of estimated price by cost calculation". On this legal basis, pricing criteria for the determination of estimated price, based on the project purpose, are announced by responsible authorities. This study analyzes the pricing criteria for technology services and proposes a price calculation methodology that can ensure transparency, as a practical improvement for more rational and efficient budget execution in the public sector.
Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.499-502
/
2007
The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.
Korean Journal of Construction Engineering and Management
/
v.18
no.5
/
pp.50-58
/
2017
The efficient communication process is essential to guarantee the completeness of design and secure the quality to meet the contractor's needs. However, using the existing communication methods based on the design and documents, it is difficult to effectively understand the drawings and specifications that are very complicated, and sufficient technical experiences would be required. Ineffective and inefficient communication among users, designers and project participants during the design process would raise the possibility of functional interferences of the object, induce conflicts, cause a design change, and accordingly incur losses of the project in terms of cost and time. The purpose of this study is to suggest improvement direction of communication in accordance with the requirements, by investigating the present state and the project participants' understanding of design communication. And also, it presents the application model of QFD that the project participants could share and define, and feedback the requirements as well as conducting analysis of improvement factors based on the survey.
Korean Journal of Construction Engineering and Management
/
v.19
no.4
/
pp.61-69
/
2018
Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.
Korean Journal of Construction Engineering and Management
/
v.9
no.3
/
pp.108-117
/
2008
The appearance of the large distribution facility of large enterprise putting first reaches get to the various effect until change of leisure life and life pattern of the consumers from the distribution industry of the interior of a country. Competition of the distribution facility upgrade of the distribution facility and it shows the aspect which becomes the semi-department store, and construction cost is appearing different in proportion to each form or scale. Therefore, purpose of this study was to facilitate amicable construction progress between the owner and the builder through estimating the proper construction cost. This study investigated and analyzed the actual cost of 15 domestic distribution facilities and these datums were used to estimate the proper construction cost. This cost shows that from new project accomplishment through analysis of prediction construction cost for feasibility study from initial plan and design step and can be utilizable elementary data bH decision method to whether or not to propriety of distribution facilities business.
Korean Journal of Construction Engineering and Management
/
v.24
no.2
/
pp.37-49
/
2023
In this study, we proposed resource allocation methodologies to improve the productivity of steel bridge manufacturing plants based on the constraint theory which is very popular in the area of manufacturing industries. To this end, after defining the painting process as a bottleneck, three resource allocation methodologies were developed: Operation Specific Resource Allocation (OSRA), Product Specific Resource Allocation (PSRA), and General Resource Allocation (GRA). As a result of experiments for performance evaluation using a simulation model of the steel bridge supply chain, GRA showed the best performance in terms of the Number of Work-In-Process (NWIP) and Waiting Time (WT), in particular, as workload itself and its variability were increased, the performance gap with the specific resource allocation became further deepened. On average, GRA reduced NWIP by 36.2% and WT by 34.6% compared to OSRA, and reduced NWIP by 71.0% and WT by 70.4% compared to PSRA. The reduction of NWIP and WT means alleviating the bottleneck of the painting process, which eventually means that the productivity of the steel bridge manufacturing plant has improved.
Korean Journal of Construction Engineering and Management
/
v.24
no.3
/
pp.42-51
/
2023
Freeze and burst water meter in winter causes many social costs, such as meter replacement cost, inability of water use, and secondary damage by freezing water. The government is making efforts to modernize local waterworks, and in particular, is promoting SWM(Smart Water Management) project nationwide. In this study suggests a new freeze risk notification information service based on the temperature by IoT sensor inside the water meter box rather than outside temperature. In addition, in order to overcome the quantitative and regional limitation of IoT temperature sensors installed nationwide, and AI based temperature prediction model was developed that predicts the temperature inside water meter boxes based on data acquired from IoT temperature sensors and other information. Through the prediction model optimization process, a nationwide water meter freezing risk information service was convinced.
The Journal of the Convergence on Culture Technology
/
v.9
no.4
/
pp.593-599
/
2023
There is risk of derailment due to various factors such as vehicle-track load imbalance in curved parts, so urban railways install and operate derailing prevent guard rails. The angle-type derailing prevent guard rail is composed of various parts including the guard angle. Even if derailment does not occur, various damages occur in the components, so continuous maintenance is required. Through the damage status analysis, the components of the angle-type derailing prevent guard rail with high damage frequency were classified, and conditions for the occurrence of various damages were investigated. In addition, a numerical analysis using a precise 3D numerical model was performed to analyze the cause of the damage analytically. In order to analytically simulate the derailment situation, the static ultimate load condition was applied, and the actual drawing of the angle-type derailing prevent guard rails, rails, and wheels was used for modeling. By analyzing the results of the damage status investigation and finite element analysis, we tried to investigate the damage of the components.
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.414-414
/
2022
본 연구는 2022년도 "제주특별자치도 수자원 부존현황 조사 및 분석 사업"의 연구비 지원에 의해수행되었습니다.최근 IPCC 제6차 평가보고서(AR6)에 새롭게 적용된 미래 기후변화 시나리오인 SSP (Shared Socioeconomic Pathways)에 따른 제주도 지역의 미래 기후변화를 강수량, 기온, 기준증발산 등을 중심으로 분석하였다. 미래의 기후변화 자료로서 19개의 GCM 모형으로부터 도출된 4개의 SSP 시나리오(SSP1-2.6, SSP2-4.5, SSP3-7.0, SSP5-8.5)를 활용하였다. 제주도 지역의 3개 기상청 ASOS 지점(제주, 성산, 서귀포)을 대상으로 상세화된 기후변화 자료를 이용하여 지점별 및 지역별 미래 전망을 분석하였다. 기준증발산량은 기온자료만을 이용하는 Thornthwaite 방법을 활용하여 산정하였으며, FAO-56 Penman-Monteith 기준증발산량과의 차이를 최소화하기 위하여 시공간적 보정계수를 적용하였다. 과거기간(1985~2014년)을 기준으로, 미래기간(2021~2095년)을 3개 구간(2021~2045년, 2046~2070년, 2071~2095년)으로 나누어 분석하였다. 제주도 전체에 대한 평균적인 전망은 대부분의 SSP 시나리오에서 강수량, 기온, 기준증발산량 모두 미래 후반기로 갈수록 점차 증가하는 경향을 보였으며, SSP1-2.6 시나리오에서만 기온과 기준증발산량이 미래 전반기(2021~2045년)에는 크게 증가하다가 중반기(2046~2070년)와 후반기(2071~2095년)에는 비교적 일정한 것으로 전망되었다. 과거기간과 비교하여 미래 후반기 SSP5-8.5 시나리오에서 가장 크게 증가하는 것으로 전망되었으며, 강수량은 17%, 기온은 38%, 기준증발산량은 58%까지 증가하는 것으로 분석되었다. 지점별로는 제주 지점이 다른 2개 지점(성산, 서귀포)에서보다 더 많이 증가할 것으로 전망되었다. 제주 지점의 경우 SSP5-8.5 시나리오에서 연 강수량은 19%, 평균기온은 42%, 기준증발산량은 70%까지 증가하는 것으로 나타났다. 증가되는 크기는 강수량은 서귀포, 성산, 제주 지점 순으로 전망되었으며, 기온과 기준증발산량은 반대로 제주, 성산, 서귀포 순으로 증가량이 클 것으로 전망되었다. 그러나 GCM 모형에 따라 전망결과가 다양하게 나타나기 때문에 이에 대한 불확실성을 고려한 미래 대응이 필요하다.
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.1405-1409
/
2010
최근 우리나라는 물 부족 국가로서 물의 효율적 관리 필요성 증대, 기후변화에 따른 가뭄 홍수 피해 증가 등으로 신뢰성 있는 수문자료구축이 필요성이 요구되고 있다. 그 중 유량측정 분야는 모든 수자원 계획과 관리의 근간이 되는 분야로 그 중요성 또한 간과 할 수 없는 부분이다. 현재 우리나라에서는 한국건설기술연구원 산하 유량조사사업단에 의해 유량측정 주요지점에 자동유량측정 시설을 설치하고 이를 운영함으로써 각 지점의 특성에 따라 적절한 방식을 채택하여 이동시간차방식 초음파 유속계(UVM, Ultrasonic Velocity Meter)와 도플러방식 초음파유속계(ADVM, Acoustic Doppler Velocity Meter)를 설치하면서 향후 수문계측 분야 선진화를 위한 기초자료를 제공하고 있다. 하지만 실시간 무인화 계측시스템에 의해 제공되는 자료가 양질의 자료임을 보장할 수 없는 현실이기 때문에 측정된 기초자료의 필터링을 통한 자료의 질적 개선이 필요하다. 따라서 본 연구에서는 기존에 전산분야의 필터링 방법으로 널리 알려져 있는 LPF(Lowpass Filter)와 KF(Kalman Filter)를 이용하여 자동유량측정 자료의 필터링 방법으로 활용하고, 그 적용성을 검토하였다. 본 연구를 통해 기존 유량자료의 문제점을 개선하고 효율적인 유량조사를 위한 기초자료 확보 방법으로 활용될 수 있을 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.