• Title/Summary/Keyword: 건설사업관리

Search Result 1,845, Processing Time 0.032 seconds

A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts (기술용역 대가기준의 문제점 및 개선방안)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.33-43
    • /
    • 2014
  • Goods, services and construction works needed by central government entities, local government entities, and other public institutions are procured with national budget. For efficient budget execution, Article 9 Paragraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter "State Contract Act") provides for the criteria for determining estimated price. Sub-paragraph 2 of the paragraph provides for the "determination of estimated price by cost calculation". On this legal basis, pricing criteria for the determination of estimated price, based on the project purpose, are announced by responsible authorities. This study analyzes the pricing criteria for technology services and proposes a price calculation methodology that can ensure transparency, as a practical improvement for more rational and efficient budget execution in the public sector.

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF

Communication Awareness Survey and Design Communication Method Using QFD (설계 커뮤니케이션 인식조사 및 QFD를 이용한 설계 커뮤니케이션 방안)

  • Bae, Yujung;Kwon, Won;Cho, Jaeho;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.50-58
    • /
    • 2017
  • The efficient communication process is essential to guarantee the completeness of design and secure the quality to meet the contractor's needs. However, using the existing communication methods based on the design and documents, it is difficult to effectively understand the drawings and specifications that are very complicated, and sufficient technical experiences would be required. Ineffective and inefficient communication among users, designers and project participants during the design process would raise the possibility of functional interferences of the object, induce conflicts, cause a design change, and accordingly incur losses of the project in terms of cost and time. The purpose of this study is to suggest improvement direction of communication in accordance with the requirements, by investigating the present state and the project participants' understanding of design communication. And also, it presents the application model of QFD that the project participants could share and define, and feedback the requirements as well as conducting analysis of improvement factors based on the survey.

The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

A Study on the Presumption of Proper Construction Cost of Distribution Facilities by Analyzing Actual Construction Cost (실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구)

  • Go, Seong-Seok;Kim, Hyun-Sik;Lee, Hyun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.108-117
    • /
    • 2008
  • The appearance of the large distribution facility of large enterprise putting first reaches get to the various effect until change of leisure life and life pattern of the consumers from the distribution industry of the interior of a country. Competition of the distribution facility upgrade of the distribution facility and it shows the aspect which becomes the semi-department store, and construction cost is appearing different in proportion to each form or scale. Therefore, purpose of this study was to facilitate amicable construction progress between the owner and the builder through estimating the proper construction cost. This study investigated and analyzed the actual cost of 15 domestic distribution facilities and these datums were used to estimate the proper construction cost. This cost shows that from new project accomplishment through analysis of prediction construction cost for feasibility study from initial plan and design step and can be utilizable elementary data bH decision method to whether or not to propriety of distribution facilities business.

Analysis of Productivity Differences in Steel Bridge Manufacturing Plants According to Resource Allocation Methods for the Bottleneck (병목공정 자원할당 방식에 따른 강교 제작공장 생산성 차이 분석)

  • Lee, Jaeil;Jeong, Eunji;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.37-49
    • /
    • 2023
  • In this study, we proposed resource allocation methodologies to improve the productivity of steel bridge manufacturing plants based on the constraint theory which is very popular in the area of manufacturing industries. To this end, after defining the painting process as a bottleneck, three resource allocation methodologies were developed: Operation Specific Resource Allocation (OSRA), Product Specific Resource Allocation (PSRA), and General Resource Allocation (GRA). As a result of experiments for performance evaluation using a simulation model of the steel bridge supply chain, GRA showed the best performance in terms of the Number of Work-In-Process (NWIP) and Waiting Time (WT), in particular, as workload itself and its variability were increased, the performance gap with the specific resource allocation became further deepened. On average, GRA reduced NWIP by 36.2% and WT by 34.6% compared to OSRA, and reduced NWIP by 71.0% and WT by 70.4% compared to PSRA. The reduction of NWIP and WT means alleviating the bottleneck of the painting process, which eventually means that the productivity of the steel bridge manufacturing plant has improved.

A Study on the development of big data-based AI water meter freeze and burst risk information service (빅데이터 기반 인공지능 동파위험 정보서비스 개발을 위한 연구)

  • Lee, Jinuk;Kim, Sunghoon;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.42-51
    • /
    • 2023
  • Freeze and burst water meter in winter causes many social costs, such as meter replacement cost, inability of water use, and secondary damage by freezing water. The government is making efforts to modernize local waterworks, and in particular, is promoting SWM(Smart Water Management) project nationwide. In this study suggests a new freeze risk notification information service based on the temperature by IoT sensor inside the water meter box rather than outside temperature. In addition, in order to overcome the quantitative and regional limitation of IoT temperature sensors installed nationwide, and AI based temperature prediction model was developed that predicts the temperature inside water meter boxes based on data acquired from IoT temperature sensors and other information. Through the prediction model optimization process, a nationwide water meter freezing risk information service was convinced.

A Study on Relationship between Structural Safety and Maintenance of Derailing Prevent Guard Rail (탈선방지 가드레일의 구조안전성과 유지보수 상관성에 관한 연구)

  • Jung-Youl Choi;Hyeon-Yo Park;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.593-599
    • /
    • 2023
  • There is risk of derailment due to various factors such as vehicle-track load imbalance in curved parts, so urban railways install and operate derailing prevent guard rails. The angle-type derailing prevent guard rail is composed of various parts including the guard angle. Even if derailment does not occur, various damages occur in the components, so continuous maintenance is required. Through the damage status analysis, the components of the angle-type derailing prevent guard rail with high damage frequency were classified, and conditions for the occurrence of various damages were investigated. In addition, a numerical analysis using a precise 3D numerical model was performed to analyze the cause of the damage analytically. In order to analytically simulate the derailment situation, the static ultimate load condition was applied, and the actual drawing of the angle-type derailing prevent guard rails, rails, and wheels was used for modeling. By analyzing the results of the damage status investigation and finite element analysis, we tried to investigate the damage of the components.

Future climate change of Jeju Island according to SSP scenarios (SSP 시나리오에 따른 제주도 지역의 미래 기후변화 전망)

  • Kim, Chul-Gyum;Cho, Jaepil;Chung, Il-Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.414-414
    • /
    • 2022
  • 본 연구는 2022년도 "제주특별자치도 수자원 부존현황 조사 및 분석 사업"의 연구비 지원에 의해수행되었습니다.최근 IPCC 제6차 평가보고서(AR6)에 새롭게 적용된 미래 기후변화 시나리오인 SSP (Shared Socioeconomic Pathways)에 따른 제주도 지역의 미래 기후변화를 강수량, 기온, 기준증발산 등을 중심으로 분석하였다. 미래의 기후변화 자료로서 19개의 GCM 모형으로부터 도출된 4개의 SSP 시나리오(SSP1-2.6, SSP2-4.5, SSP3-7.0, SSP5-8.5)를 활용하였다. 제주도 지역의 3개 기상청 ASOS 지점(제주, 성산, 서귀포)을 대상으로 상세화된 기후변화 자료를 이용하여 지점별 및 지역별 미래 전망을 분석하였다. 기준증발산량은 기온자료만을 이용하는 Thornthwaite 방법을 활용하여 산정하였으며, FAO-56 Penman-Monteith 기준증발산량과의 차이를 최소화하기 위하여 시공간적 보정계수를 적용하였다. 과거기간(1985~2014년)을 기준으로, 미래기간(2021~2095년)을 3개 구간(2021~2045년, 2046~2070년, 2071~2095년)으로 나누어 분석하였다. 제주도 전체에 대한 평균적인 전망은 대부분의 SSP 시나리오에서 강수량, 기온, 기준증발산량 모두 미래 후반기로 갈수록 점차 증가하는 경향을 보였으며, SSP1-2.6 시나리오에서만 기온과 기준증발산량이 미래 전반기(2021~2045년)에는 크게 증가하다가 중반기(2046~2070년)와 후반기(2071~2095년)에는 비교적 일정한 것으로 전망되었다. 과거기간과 비교하여 미래 후반기 SSP5-8.5 시나리오에서 가장 크게 증가하는 것으로 전망되었으며, 강수량은 17%, 기온은 38%, 기준증발산량은 58%까지 증가하는 것으로 분석되었다. 지점별로는 제주 지점이 다른 2개 지점(성산, 서귀포)에서보다 더 많이 증가할 것으로 전망되었다. 제주 지점의 경우 SSP5-8.5 시나리오에서 연 강수량은 19%, 평균기온은 42%, 기준증발산량은 70%까지 증가하는 것으로 나타났다. 증가되는 크기는 강수량은 서귀포, 성산, 제주 지점 순으로 전망되었으며, 기온과 기준증발산량은 반대로 제주, 성산, 서귀포 순으로 증가량이 클 것으로 전망되었다. 그러나 GCM 모형에 따라 전망결과가 다양하게 나타나기 때문에 이에 대한 불확실성을 고려한 미래 대응이 필요하다.

  • PDF

Application of Filtering Method to Improve the Quality of Automatically Measured Discharge Data (자동유량측정 자료의 개선을 위한 필터링 방법의 적용)

  • Chang, Kwon-Hee;Kim, Chi-Young;Kim, Soo-Jun;Song, Jae-Hyun;Kim, Hung-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1405-1409
    • /
    • 2010
  • 최근 우리나라는 물 부족 국가로서 물의 효율적 관리 필요성 증대, 기후변화에 따른 가뭄 홍수 피해 증가 등으로 신뢰성 있는 수문자료구축이 필요성이 요구되고 있다. 그 중 유량측정 분야는 모든 수자원 계획과 관리의 근간이 되는 분야로 그 중요성 또한 간과 할 수 없는 부분이다. 현재 우리나라에서는 한국건설기술연구원 산하 유량조사사업단에 의해 유량측정 주요지점에 자동유량측정 시설을 설치하고 이를 운영함으로써 각 지점의 특성에 따라 적절한 방식을 채택하여 이동시간차방식 초음파 유속계(UVM, Ultrasonic Velocity Meter)와 도플러방식 초음파유속계(ADVM, Acoustic Doppler Velocity Meter)를 설치하면서 향후 수문계측 분야 선진화를 위한 기초자료를 제공하고 있다. 하지만 실시간 무인화 계측시스템에 의해 제공되는 자료가 양질의 자료임을 보장할 수 없는 현실이기 때문에 측정된 기초자료의 필터링을 통한 자료의 질적 개선이 필요하다. 따라서 본 연구에서는 기존에 전산분야의 필터링 방법으로 널리 알려져 있는 LPF(Lowpass Filter)와 KF(Kalman Filter)를 이용하여 자동유량측정 자료의 필터링 방법으로 활용하고, 그 적용성을 검토하였다. 본 연구를 통해 기존 유량자료의 문제점을 개선하고 효율적인 유량조사를 위한 기초자료 확보 방법으로 활용될 수 있을 것으로 기대된다.

  • PDF