• Title/Summary/Keyword: 건설사업관리 프로세스

Search Result 166, Processing Time 0.025 seconds

A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

A Conceptual Design of Information Management Model of Ordering Service Results including Management Item by Construction Fields (건설분야별 관리항목을 포함하는 용역실적정보 관리모델의 개념적 설계)

  • Kim, seong-jin;Kim, nam-gon;Na, hei-suk
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.447-448
    • /
    • 2013
  • 본 연구는 발주청에서 발주 관리되는 설계, 감리, 건설사업관리 용역실적정보를 건설분야별 사업단계별로 관리체계를 마련하고 용역사와 발주청에서 용역실적정보를 체계적으로 등록 관리할 수 있도록 업무처리 프로세스를 개선하고자 한다.

  • PDF

Searching for Core Project Management Issues in Remodeling Projects : Focus on office building remodeling projects (리모델링 프로젝트의 사업관리 현안 발굴 연구 : 오피스빌딩 리모델링 사업을 대상으로)

  • Seo Hee-jun;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.220-223
    • /
    • 2004
  • Remodelling projects have recently emerged as an alternative construction market. Due to the limited experience of such projects, repetitive mistakes and failures in project management become concerns for those in the market sector. The objective of this paper to report preliminary findings in relation to core project management issues in office remodelling projects based on literature review and expert interviews.

  • PDF

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.