• Title/Summary/Keyword: 건설사업관리 프로세스

Search Result 166, Processing Time 0.025 seconds

A Study on Optimizing of Roof-Top Photovoltaic Arrays Arrangement Based on Three-Dimensional Geo-Spatial Information (3차원 지형공간정보 기반 지붕형 태양광 어레이 배치 최적화 연구)

  • Kim, Se-Jong;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.151-159
    • /
    • 2011
  • Due to the Korean government's renewable energy support policy such as the renewable energy utilization building certificate and enlarging the compulsory ratio of investment on the public building, the rooftop photovoltaic projects are expanding rapidly. It is very important for the rooftop photovoltaic projects to analyze the shading effect of the adjacent structures or own facilities. But, the photovoltaic arrangements are planned by the experience of the designers or simple graphic tools. The purpose of this study is to build the process model for optimizing of rooftop photovoltaic arrangement based on three-dimensional geo-spatial information.

Deducting the Critical Enhancement Task of Green Remodeling based on IPA Method (IPA 기법 기반 그린리모델링 중점 강화 업무 도출에 관한 연구)

  • Kwon, Young-In;Hwang, Doo-Won;Jung, Sung-Ho;Lee, Ki-Seok;Park, Jong-Il;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.58-69
    • /
    • 2016
  • As issue of global environment, Korea government sets the specific goal to reduce CO2 emission by 26.9% in construction industry up to 2020. Korea government is encouraging Greenremodeling and progressing the pilot to establish the guideline and instruction. However, There is a lack of the study on establishing process, tasks of Greenremodeling, and Greenremodeling guidelines and instructions are also insufficient, so the vitalization of Greenremodeling is difficult. Therefore, the purpose of this study is deducting Greenremodeling process and the critical enhancement task of Greenremodeling. For that, deducting the Greenremodeling tasks through analyzing of previous research and taking counsel from experts, and drawing the critical enhancement tasks of Greenremodeling using IPA method. From now on, It is conducted in Greenremodeling business and expected to contribute Greenremodeling market.

The Significance and Management of Hyporheic Zone (지표수-지하수 혼합대 의의와 관리 필요성)

  • Ko, Dongwoo;Lee, Namjoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.283-283
    • /
    • 2021
  • 혼합대는 지표수와 지하수의 수리적 교환이 일어나는 경계부로써 1) 수문학적 관점에서는 하도와 하상간의 물교환이 이루어지는 공간으로 다양한 물리적·화학적 작용이 발생, 2) 생지화학적인 관점에서는 하상 간극수 흐름에 의한 전이대(ecotone)를 형성하여 용존산소·영양물질·용존유기탄소의 이동뿐만이 아니라 지하수로부터 열에너지·무기염류의 공급을 유도하면서 높은 생지화학적 활동과 변환을 야기하는 산화·환원 반응구역, 3) 생태적인 관점에서는 저서생물과 지하 유기체종을 특징으로 하는 서식지이나 잠재적인 레퓨지움(refugium) 등의 관점에서 해석될 수 있다. 국내 하천환경의 생태학적 지속가능성을 위한 지표수-지하수 혼합대 관리에 대한 중요성이 점차 증대되고 있지만 우리나라는 여전히 지하수의 이용 및 보전과 지하수의 안정적인 수량·수질 확보를 목표로 관리를 추진하고 있다. 따라서, 실질적인 지표수-지하수 혼합대에서 발생하는 다양한 현상의 이해나 관리방안에 관한 연구는 아직 미비한 상황이다. 지표수-지하수 혼합대에 관한 보고서, 논문 등을 종합하여 혼합대의 영향인자를 살펴보면 1) 수리수문 특성에는 수리전도도·하천 수위·하천 유속·하천수 수온, 2) 수질 특성에는 유기오염물질·영양염류, 3) 수생태 특성에는 대형무척추동물 등으로 분류할 수 있다. 지금까지 단일 연구분야의 접근방법으로 다양한 현장측정기법 및 모델링을 통한 혼합대 연구가 수행되고 있지만, 혼합대가 가지는 환경적 중요성에 대한 이해와 인식이 부족하고, 혼합대 내부에서 발생하는 복합적인 프로세스로 인해 전문가들조차 연구에 어려움을 가질 것이다. 지표수-지하수 혼합대의 효율적인 관리를 위해서는 수리수문·수질·수생태 등 다양한 시각에서 접근하여 학제간 융합연구를 통해 기초 데이터를 상호교환하고, 기존의 혼합대 조사에 부족한 부분을 해결할 필요가 있다. 향후 하천 기저유출 및 혼합대 기초자료 구축, 혼합대 흐름 정량화, 하천복원사업에 의한 혼합대 영향 규명 등의 연구를 수행함으로써 혼합대를 체계적으로 관리할 수 있는 기술 방안을 제시할 필요가 있다.

  • PDF

A Study on Improvements Direction for Applying BIM-based Virtual Reality of Apartment Sales Phase (공동주택 분양 관리 단계의 BIM 기반 가상현실 적용성 확보를 위한 개선방향 도출에 관한 연구)

  • Lee, Juyeon;Kim, Taekjoong;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.86-94
    • /
    • 2019
  • The purpose of this study was to analyzes the problems in terms of transmission the information of architecture in the current apartment housing sales phase, to suggest the way of application the technology of BIM-based virtual reality. For this purpose, each element technology is analyzed through analyzing the exiting studies and international technical trend of BIM-based virtual reality and motion recognition devices. And then this study analyze the present condition of apartment housing sales phase and it conduct the expert interviews for derive the problem and analyzing the importance and priority by AHP method. And finally, this study suggest the solution in terms of information delivery in apartment housing sales phase through plan for support and deriving the function about problems. The system of BIM-based virtual reality viewer that utilize a leap motion that was presented in this study, it is believed to be able to efficiently transfer the information of architecture as building information transmission system user-centric in the future of apartment housing sales phase.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

A cluster analysis of the audit result on quality management system in architectural design and engineering firms (설계 및 엔지니어링분야의 품질경영시스템 심사결과에 대한 유형분석)

  • Bae Dae-kwon;Kim Soo-Yoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.120-128
    • /
    • 2005
  • ISO 9001, the quality management system issued by the International Organization for Standardization, is being used by architectural design and engineering firms in order to strengthen the capability of business activities through the implementation of the international and advanced quality management systems. However, there have been significant problems in stable implementation and settlement of ISO 9001 in construction industry, which seem to be caused by key employees' lack of proper recognition and comprehension. The purpose of this research, accordingly, is to find and analyze nonconformity results which were found when the third party registrars audited the conformity of companies' quality management systems for ISO 9001 certification especially in architectural design and engineering firms. For this purpose this research was conducted by a cluster analysis of 647 audit reports out of representative 15 architectural design and engineering firms that have been audited periodically from 1997 to 2003 by the third party registrars. The analysis showed that the most frequent problems were generated in the areas of $\ulcorner$Design and Development$\lrcorner$ , $\ulcorner$production and Service Provision$\lrcorner$ , and $\ulcorner$General requirements$\lrcorner$ of the quality management system. The following, the areas of $\ulcorner$Monitoring and Measurement$\lrcorner$ and $\ulcorner$purchasing$\lrcorner$ were also analyzed as main factors which caused frequent nonconformity results. This research also shows that the corrective actions for nonconformity results are closely connected with the whole management activities in architectural design and engineering firms. Consequently, corrective actions for disposition of nonconformities should be implemented more specifically in order to settle and activate the quality management systems in architectural design and engineering firms.

Development of Engineering Checklist Model for Case-based Evaluation of Plant EPC Project (플랜트사업 설계사례의 체크리스트기반 평가모델에 관한 연구)

  • Lee, Sang-Youb;Son, Jae-Ho;You, Young-Hun;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.146-152
    • /
    • 2008
  • Since the year of mid 2000, the EPC industry in Korea has the highest amount of orders received due to tremendous need form middle east asia region. However, the quality requirement from the owner is getting critical, which lead to the more competitive engineering capacity equipped. In order to do so, the development of objective and quantitative evaluation model of engineering process is essential. In order to develop the engineering checklist model for case-based evaluation of EPC project, first, the general description of worldwide EPC industry as well as the literature review of prior study have been performed. Then, the survey interview with experts in the engineering area of EPC project was performed In order to Identify the engineering work tasks and the critical check items, which should be checked during engineering process. Based on these checklist, the weights of check items as well as engineering work tasks also have been defined. The developed checklist model evaluated the two EPC project cases of S company in Thailand in order to explore its applicability. From the analysis of evaluation results, it is expected that the continuous implementation of evaluation based on checklist model can help the EPC practitioner check the critical items in engineering process more efficiently and take an appropriate action for better engineering performance, which finally can lead to the Korea EPC industry being more competitive.

A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects (공동주택 리모델링 초기 단계 의사결정을 위한 확률론적 리스크 기반 비용 예측 모델 개발)

  • Lee, Dong-gun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.70-79
    • /
    • 2016
  • The current remodeling cost estimation process is not only dependent on the historical data of new building construction, but it also has a poor linkage with risk-based estimation approach. As such, there is a high risk of falling short of initial budget. To overcome this, a risk-based estimation approach is necessary by providing a probabilistic estimation in consideration of the potential risk factors in conducting the remodeling projects. In addition, the decision-making process should be linked with the risk-based estimation results in stead of intuitive and/or experience-based estimation. This study provides a probabilistic estimation process for residential remodeling projects by developing a detailed methodology in which a step-by-step approach can be achieved. The new proposed estimation approach can help in decision-making for remodeling projects in terms of whether to proceed or not, by effectively reflecting the potential risk factors in the early stage of the project. In addition, the study can enhance the reliability of the estimation results by developing a sustainable estimation process model where a risk-based evaluation can be accomplished by setting up the cost-risk relationship database structure.

Decision Support Process Model for Energy Efficient Remodeling Projects focused on Building Envelope and Renewable-energy Systems (에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델 - 건축물 외피 및 신재생에너지 시스템을 중심으로 -)

  • Shin, Young-su;Cho, Kyuman;Kim, Jae-youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.91-100
    • /
    • 2015
  • An increase in energy such as natural gas, coal, oil, has occurred to a large amounts of environment impact emissions, it is necessary to reduce in the construction industry for the energy consumption. To encourage remodeling project in developed countries of the majority, on the basis of this, remodeling project in the construction industry has grown to a large amount. Results of analysis of the research related to the advanced remodeling, analysis of the economic validity in accordance with the production and process and building elapsed years of selection alternative of remodeling there has been a problem that has not been properly reflected. In this study, a decision support model that can simultaneously choose the most cost-effective and energy-efficiency alternative. Developed process model, generates a "Remodeling Solution" that combines the renewable energy equipment and envelope system, energy performance evaluation of the application of international standards(ISO-13790, DIN V 18599), perform the economic evaluation through LCCA(Life Cycle Cost Analysis) technique, circulated evaluation and configured to output the optimal Remodeling Solution. The results of applying the model developed in the case, it was confirmed that it is possible to select a choice of cost-effective energy-saving alternative. Then, developed model through this study, it is expected to be able to help highly effective remodeling alternative to selecting by decision-makers.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.