• Title/Summary/Keyword: 건설사업관리 적용

Search Result 584, Processing Time 0.027 seconds

A Study on the Evaluation Criteria of Safety Competency of Construction Manager (건설사업관리자 선정평가에 안전역량 평가항목 적용 연구)

  • Kim, Dosu;Joh, Hyunwoo;Kim, Gwanghee;Joo, Jinkyu;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.46-54
    • /
    • 2020
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

A Study on the Practical Utilization Analysis and Linkage Scheme of WBS and OBS from the Construction Manager (CMr) Perspective (건설사업관리자(CMr) 측면에서의 WBS와 OBS의 실무적 활용도 분석 및 연계 방안에 관한 연구)

  • Yang, Jinkook;Seo, Boram;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.57-64
    • /
    • 2020
  • Construction management performs a variety of tasks, and the buildup of the WBS and OBS is one of the core tasks. However, the practical utilization of WBS and OBS is low in the current construction management work. In this study, we conducted a survey of related experts to analyze the understanding, utilization level, application effect, and connectivity of WBS and OBS. As a result, it was identify that the standardization and linkage of WBS and OBS should be secured so that the construction manager (CMr) could apply it. Therefore, we extracted management control factors through expert in-depth interviews and workshops and conducted AHP importance analysis. Analysis results of importance shows that there is a high importance of strengthening the link between WBS and OBS and updating OBS due to changes in WBS. The results presented are not direct solutions, but are expected to provide a standard for construction managers to consider.

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.

Implementation Status of TPMS in GS E&C's Overseas Projects (GS건설 해외 Project의 TPMS 적용 현황)

  • Lee, Jun-Bok;Park, Chan-Jeong;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • GS E&C applies TPMS(Total Project Management System) to all construction projects. This system is applied to all overseas projects, it is successfully used not only GS E&C but also subcontractors, vendors and clients. TPMS collects data spontaneously that is used to each participant, improves effectiveness in construction projects and gives transparency to all participants while sharing same information. This paper is aimed to share successful case study focusing on document management system, and how to develop TPMS in the future.

  • PDF

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

Application of Incentive on Design VE to Public Design-Build Projects (공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안)

  • Lee, Hun-Woo;Jung, Jae-Hoon;Kim, Hae-Gon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.284-288
    • /
    • 2006
  • Ministry of Construction & Transportation prescribes that all of the construction works including Design-Build whose cost more than then billion won must be applied VE at the design phase. It is difficult to apply VE at the design development phase to design-build projects under current design-build contract because design should be proceeded with fixed price by bidding. Therefore the present study suggests an application of incentive which can maximize the effectiveness of design VE in design-build projects after analysing current design-build's characteristics and difficulties of design VE application.

  • PDF