• Title/Summary/Keyword: 건설물자재

Search Result 96, Processing Time 0.029 seconds

Developing the Towercranes Planning Process in High-rise Building Project (고층 건축공사의 타워크레인 계획 프로세스 개발)

  • Chae Hee-dong;Jang Myung-houn;Lee Hyun-soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.387-392
    • /
    • 2001
  • The purpose of this study is to develop the process to support and evaluate experts' decision making on vertical transportation planning in high-rise building constructions. Experts generally carry out the vertical transportation planning by heuristic methods, so there is a possibility that their decisions failed. The failure of the vertical transportation planning can be result in much loss of time and cost. The process presented in this paper evaluates experts' alternatives, organizes the results of the vertical transportation plan, and then leads to the systematic flow of materials and crews.

  • PDF

Suggestion of the Attached Piping Material Rate for the Mechanical Fire Protection Facilities in Office Buildings (업무용 건축물의 기계소방시설 배관 부속자재 요율 제시)

  • Park, Lyool;Park, Kyung-Soon;Yoon, Hang-Mook
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.1-8
    • /
    • 2018
  • In generally, the estimation work regarding building mechanical service system in comparison with other architectural estimations is time-consuming, and the process is continuously getting more difficult because of the increased usage of the attached piping materials such as fittings and supports in addition to their complicated construction processes. In order to improve this problem, the Korean authority provides a simple method to estimate the attached material rate regarding the main piping material, which is the most time-consuming work in the architectural mechanical estimation. However, to be an applicable method on construction site, a proper conversion rate of the attached piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the suggestion of the material and labor cost rate of the attached piping materials such as the fittings and supports by work types and fitting methods of indoor fire, sprinkler, and extinguishing gas piping work of mechanical fire protection facilities in office buildings that have been designed after 2010.

A Survey on Consumer Perception on Removability of PET Bottle Labels (PET병 라벨의 분리용이성에 대한 소비자의 인식 및 실태 조사)

  • Kang, Wook Geon;Kim, Jongkyoung
    • KOREAN JOURNAL OF PACKAGING SCIENCE & TECHNOLOGY
    • /
    • v.27 no.2
    • /
    • pp.63-70
    • /
    • 2021
  • As the government strengthens its policy of separating and discharging packaging materials, consumers are increasingly dissatisfied. In order to increase consumer participation in separate discharge policy of packaging materials, it is necessary to increase the willingness to participate by reducing potential consumer problems such as removal of packaging labels. This study conducted a survey of 300 consumers aged 14 and over who recycle and discharge directly from their homes. Ninety-nine percent of consumers said PET bottles are released separately. However, only 65% of consumers removed labels (attachment labels, shrink labels) and other materials (caps, vinyl coatings, tapes, handles, bases, etc.) during separate discharge process. Nearly 52% of consumers cited 'difficulty of separation' as the main reason for not removing labels and other materials. One-way ANOVA analysis showed that 'strong adhesion', 'removal initiation problem' and 'material strength' had high mean regardless of age, which are major factors impedes label removal. Using shrink labels with perforated lines rather than adhesive labels would be more beneficial to encouraging participation in separate discharge. However, if the shrink labels do not have perforated lines or are difficult to remove, adhesive labels are often easier to remove than shrink labels because of the strong cohesiveness of shrink labels. As a result, how easy it is for consumers to remove the label is more important than technological differences. In order to increase consumer participation in packaging material and label separations, improvements in structural design are needed along with the selection of materials that are easy to separate. This study is meaningful in examining consumer perceptions, deriving problems and suggesting directions for policy improvement.

Impact Evaluation of Water Footprint on Stages of Drainage Works (배수공 각 작업 단계별 물발자국 영향평가)

  • Chen, Di;Kim, Joon-Soo;Batagalle, Vinuri;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.2
    • /
    • pp.225-231
    • /
    • 2020
  • Fresh water that can be used by a person of the total amount of water on the planet is increased because it is less than 0.01 % except underground water, ice and snow, etc. water management response need. In order to protect and efficiently utilize water resources, major countries are conducting water footprint studies that can quantitatively estimate the amount of water put into the operating phase of the resource harvesting phase, mainly agriculture. Korea has also recently developed a number of policies in order to cope with water shortages, and in the construction industry, as well as the need for basic research to support it has been emphasized. This study was constructed DB up to the raw material harvesting step, the transport step, the production stage in order to estimate the water consumption of resources to be put into the work process to target the drainage of the road. Water usage estimation method was utilized the method presented in the Water Footprint Manual and the environmental score card certification guide, unit water usage each drainage main method was calculated after estimating the water footprint considering the water character factor, indirect water and the direct water, the water consumption factor of material input to each process. Brown asphalt, rebar, remicon of the drainage material as a result of the water footprint calculation accounted for 97 % of the total. Drainage method is a culvert, a side channel, a culvert wing wall, reinforced concrete open channel accounted for 92.2 % of the total. Drainage total step-by-step calculated water consumption and water footprint was found in order of raw material harvesting step, transport stage, production stage. Water footprint each drainage method or total drainage material calculated in this study can be used as a base data in the agricultural and construction sectors. In order to increase the reliability of the analysis, it is believed that further overseas databases will be needed for continuous review and research.

A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction (공동주택공사의 건설용 리프트를 이용한 양중계획 타당성 분석)

  • Lee, Jun-Bok;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.185-193
    • /
    • 2008
  • In order to improve work efficiency in high-rise apartment building construction, it is required to establish the major criteria and practical method for selecting the construction lifts. It is necessary to analyze work efficiency and economic feasibility depending on speed, size and capacity of lifting equipment and characteristics of construction projects. The purpose of this research is to develop the fundamental process and information for selecting the lift in order to plan and manage the material lifting and laborers' vertical transporting in the high-rise apartment building projects more effectively. In order to satisfy the objective of the research, work performance of the lifting machines with different speed and carrying capacity is analyzed under the practical constraints. In addition, potential economic evaluation is conducted. One of the significant findings of the research is that the mid-speed lift shows 43% improvement in work efficiency compared with the low-speed lift. The results of the research will be used as the basis for developing the further optimal lifting management system.

A study on the choice of the best method of construction for building insulation and waterproof (건축물의 단열방수의 최적 공법및 구법 선정 방법론에 관한 연구)

  • Lee, Sung-Goo;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.654-658
    • /
    • 2006
  • To solve some problems that reveals in the exiting stickiness problem of the housetop, the housetop finishing impact layer can be displaced by the existing concrete block. By doing in this way, this need is rising that the excess cost should be reduced and the materials should be recycled in repairing. According to the above, this study is going to suggest the basic data on building and using of the dry process method by estimating and analyzing a overall determinate quantity through the experiment on the insulation performance among the capacity items on the outside insulation waterproof dry process suggested. In addition, choosing the building method according to the use, the peculiar property and the importance of the building can be possible by analyzing the defect causes happening in the rooftop insulation and waterproof, suggesting the better method and classifying the most proper choosing methods for the need of the building according to the importance of the main factors.

  • PDF

An analysis on CO2 emission of structural steel materials by strength using Input-Output LCA (산업연관분석법을 이용한 강도에 따른 구조용 강재의 이산화탄소 배출량 데이터 구축)

  • Hong, Tae-Hoon;Ji, Chang-Yoon;Jang, Min-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.132-140
    • /
    • 2012
  • Along with the increasing interest in environmental problems such as global warming, the South Korean government has established policies and regulations to reduce the amount of greenhouse gases, targeting a 30% reduction of $CO_2$ compared to business-as-usual levels by 2020. Thus, there have been many studies in construction field to control and reduce the amount of $CO_2$ emitted from buildings. $CO_2$ emission from the building construction could be obtained by using the life cycle assessment(LCA) methodology. In LCA, it is essential to have life cycle inventory(LCI) data of construction materials consisting of $CO_2$ emission data that have been defined and examined in a detailed way in order to obtain more accurate and detailed $CO_2$ emission of buildings. To date, however, the LCI data have been acquired only for the representative materials. Accordingly this study aimed to propose detailed $CO_2$ emission data for steel rebar and H-beam, which are the essential structural steel materials, by strength and type. To accomplish the objective, this study used Input-Output LCA methodology which is based on the Input-Output table. It is believed that the $CO_2$ emission data of steel materials acquired from this study would allow a more accurate assessment of $CO_2$ emission for diverse structural design alternatives.

A Study on the Characteristics of Environmental Impact in Construction Sector of High-Speed Railway using LCA (LCA를 이용한 고속철도 건설단계에서의 환경부하 특성에 관한 연구)

  • Lee, Cheol;Lee, Jae-Young;Jung, Woo-Sung;Hwang, Young-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.3
    • /
    • pp.178-185
    • /
    • 2014
  • This study investigates the characteristics of environmental impact from the construction phase of a high-speed railway through a Life Cycle Assessment method based on the materials used and the energy consumption of the equipment used according to the design statement. The results reveal that the contributions to environmental impact in the construction sector of a high-speed railway were 89% for civil engineering, 7% for the track system, 2% for stations and 2% for the energy and telecommunication system. In particular, the highest contribution to the impact in the civil engineering category were 54% for Global Warming, 25% for Abiotic Resource Depletion and 8% for Photochemical Oxidant Creation. The main influence factors were the use of remicon and cement. In future, the application of Life Cycle Assessment for the construction sector of railway construction will introduce efficient reduction methods according to the quantitative calculation of environmental impact.

The Analysis on the Validity of Recycling of Vertical Protective Nets Used in Construction Sites (건설현장에서 사용된 수직보호망의 재활용 타당성 분석에 관한 연구)

  • Cho, Hyun-Dae;Jaung, Jae-Dong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.479-488
    • /
    • 2018
  • The issue of waste and its recycling is perceived as a worldwide environmental problem, and the plastic waste is perceived as the biggest social problem threatening the lives of mankind. The vertical protective net, manufactured by using the plastic resin is vertically installed on the outside in case of formwork at the construction site, in order to prevent the fallen objects and scattered dusts. The objective of this study is to understand the actual use status of vertical protective net in the construction site, to examine the changes in the environment-related regulations recently strengthened in the construction site, and also to improve the field technicians' perception of it. And based on it, this study aims to suggest the measures for using the rational and environment-friendly materials and also for promoting the recycling of vertical protective net as the vertical protective nets made of plastic resin are thoughtlessly used in the construction site.

A Study on the Requisite Elements of LCCO2 Evaluation System at Planning Stage of Building (건축물 계획단계 LCCO2 평가시스템의 필요요소에 관한 연구)

  • Baek, Cheong-Hoon;Tae, Sung-Ho;Roh, Seung-Jun;Lee, Joo-Ho;Shin, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.31-41
    • /
    • 2011
  • The $LCCO_2$ evaluation programs previously developed in Korea involve limitations in establishing strategies of reducing environmental loads to optimal level in a way to put in materials directly after designing. Therefore, this study has the purpose to extract and propose elements required for the establishment of highly accurate system by counteracting swiftly in a method with high energy efficiency over cost at planning stage. To that end, existing $LCCO_2$ evaluation programs in Korea and abroad were compared and analyzed, and in the planning stage, GEM-21P and Carbon-navigator intended for the establishment of building energy performance improving strategy were selected as the evaluation program for survey. On such basis, after comparison and analysis between $LCCO_2$ calculating methods and system structures of the two programs, elements required for system establishment that can evaluate life-cycle environmental loads of building in planning stage were proposed.