• Title/Summary/Keyword: 건설기술인력

Search Result 271, Processing Time 0.032 seconds

과학기술계동정

  • Korean Federation of Science and Technology Societies
    • The Science & Technology
    • /
    • v.35 no.9 s.400
    • /
    • pp.94-95
    • /
    • 2002
  • 2002산학연 여름 연합심포지엄 '화학산업의 새로운 진로' 한국고분자학회 외/국제물리올림피아드 한국 준우승/'아름다운 도로'선정계획 - 건설교통부/기업 '연구클러스터' 육성에 나서/재CIS과협 생명공학세미나 개최안내/퇴직 기술인력 일자리 찾기 쉬워진다 '산업기술인력 아웃플레이스먼트센터' 설립 추진 - 산업자원부/2002 대한민국 벤처창업대전 개최 - 중소기업청

  • PDF

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

A plan for the development of high skilled manpower in the plant construction industry (플랜트 건설산업의 경쟁력 향상을 위한 전문 인력양성 방안)

  • Lee, Kkoch-Nim;Jun, Young-Joon;Noh, Jae-Yoon;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.699-703
    • /
    • 2007
  • The recent plant order of oversea in domestic engineering and Construction Companies have been growing since 2003. In 2006, the total order came out 2.54 billion dollar. And in a quarter of 2007, the Ministry of Commerce announced that total order already came out 900 million dollar. They expect that the plant industry in the global market will be grown more in near future. However, even though there is growing plant businesses in oversea specially focused on the Middle East area, the domestic large engineering and Construction Company now face up the shortage of specialty manpower. Moreover, the domestic small and medium enterprises have same problems as large companies have. The plant construction industry is expanding rapidly, but the supply of specialty manpower can not follow its growing business. Also, most new supplied manpower is the person who graduated recently and received the degree in the different civil engineering track other than the plant major track, they are required to be re-educated. So, it is unable to deploy in short time. Also, there is shortage of manpower in the Construction Management financing division. Consequently, this project will study the efficient method of training for specialty manpower, provide the solutions.

  • PDF

건설현장 재해예방을 위한 안전관리제도 내실화 방안-재해예방 기술지도 중심으로

  • Park, Dae-Seong
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.35
    • /
    • pp.60-71
    • /
    • 2006
  • 기술지도제도는 전문기술인력을 활용하여 재해율이 높은 중ㆍ소규모 현장의 건설재해를 효율적으로 관리하기 위해 정부가 간접적인 안전관리 전문제도로 도입하였다. 하지만 IMF 이후 급격히 변화된 건설현장 안전관리 체계와 재해율 증가, 지도기관 업체의 난립과 부실한 지도업무수행 등으로 기술지도제도의 실효성에 많은 문제점이 발생하고 있다. 따라서 본 연구에서는 기술지도제도의 운영 실태와 관계 법령, 설문조사 자료를 분석하여 문제점을 도출한 후 제도 운영상의 개선 방안, 지도기관의 전문성 강화 방안, 자율적인 안전관리 유도 방안으로 구분한 내실화 방안을 제시함으로써 효율적인 재해예방대책으로서 기술지도제도의 신뢰성을 제고시키는데 그 목적이 있다.

  • PDF

업계탐구-은산토건(주)

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.33
    • /
    • pp.26-29
    • /
    • 2005
  • 정도와 홍익, 인화와 단결. 은산토건(주)는 1993년 창업아래 "정도와 홍익"의 경영이념 하에 오직 성실과 신용을 바탕으로 우수한 인력의 확보, 신기술의 적극적 도입, 최상의 자재사용, 전사적 자원 관리인 ERP 시스템 도입, 안전품질환경의 생활화로 고객으로부터 신뢰와 만족을 받는 국내 최고의 전문건설업체가 되고자 끊임없는 노력과 자긍심을 바탕으로 매진하여 왔다.

  • PDF

The State of Art of RFID Technology for Construction Project in Korea (RFID 기술의 국내적용 실태)

  • Chang, Sang-Hyeok;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.819-822
    • /
    • 2007
  • Recently, U-Construction is a topic word of construction industry. U-construction is construction with IT technology that is ubiquitous. That will help that domestic construction industry which is lower technology than developed countries overcomes the competition. RFID technology which can be transmission of massage and the receipt of a massage with non touch is core of U-construction. The RFID technology has a big range of application. Man ${\cdot}$ Quality ${\cdot}$ Process ${\cdot}$ Safety ${\cdot}$ Distribution management is already applied to construction industry and especially, The Man ${\cdot}$ Safety management are spreaded widely. This thesis analyzes that the State of Art of RFID Technology to Construction in Korea through the survey and RFID Technology becoming wider by construction scale and period. Process' Distribution management show the trend which becomes wider by construction scale and period.

  • PDF

특급기술자 전문교육 시행

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.216
    • /
    • pp.50-51
    • /
    • 2008
  • 국토해양부는 특급기술자에 대한 의무학점제 전문교육 내용을 담은 '건설기술인력 교육훈련 방법 및 이수인정 기준' 제정안을 지난 6월 9일 고시하고, 7월 1일부터 시행에 들어갔다. 건설기술관리법 개정으로 신설된 특급기술자의 학점제 전문교육 시행 방법은 특급기술자의 경우 3년마다 전문교육을 통해 90학점을 채워야 한다. 90학점 중에는 반드시 전문교육으로 35학점을 이수한 후 나머지 55학점은 수강교육과 무형식 교육으로 획득하면 된다.

  • PDF

Key Competency Factors of Professional Engineer in Environment - friendly Construction Industry (친환경 건설 전문 인력의 핵심 역량 요인 분석)

  • Park, Soyeon;Kim, Suryeon;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.73-82
    • /
    • 2018
  • The Environment - friendly construction industry has developed rapidly with sustained development of related technologies and government assistance. However, there is lack of consideration for nurturing professional manpower for Environment - friendly construction industry. In order to support rapid growth, it is necessary to analyze the competency of professional manpower to prepare for successful Environment - friendly construction industry. Thus, this research derive competency variables through the literature review and experts' interview was applied toward an validating of the key variables. Further, a survey of competency factors for sustainable construction was performed and analyzed through exploratory factor analysis. The result showed that four key competency factors were derived, and two factors stood out : Understanding of Sustainability and Affective Competency. The meaning of this research is to investigate relationship between the characteristics of Environment - friendly construction and importance of competency factor.