Permanent Formwork of PLA Filament utilizing 3D Printing Technology (3D 프린팅 기술을 활용한 PLA 필라멘트 비탈형 거푸집 연구)

  • Jeong, Junhyeong;Hyun, Jihun;Jeong, Heesang;Go, Huijae;Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.81-89
    • /
    • 2021
  • In recent years, the design of buildings is changing from formal to creative and freeform. Accordingly, the scale of construction technology is changing to architectural design and construction of irregular buildings. Using the FDM method, which is one of the 3D printing technologies, it is possible to manufacture various forms of irregular formwork inexpensively and quickly coMPared to the existing formwork, and it seems to be able to solve the manpower problem. Using a 3D printer, the PLA filament formwork is produced in the form of a cylinder and a rectangular cuboid, and the usability of the PLA filament formwork is confirmed by examining the compression strength test and the degree of deformation and reusability over 28 days of age. Different sizes of additional specimens are also conducted according to the size. As a result of the experiment, it was confirmed that the filament formwork itself has about 3~4MPa strength. As a result of reviewing data through existing linear studies and experiments, it is appropriate to use more than 60% infill, and it is advantageous in terms of strength. As a result of cutting and dismantling the filament formwork, the surface is very clean and there is no damage, so it can be reused.

Measurement of Velocity and Discharge In Natural Streams with the Electronic Float System (전자부자 시스템을 활용한 자연하천의 유속과 유량 측정)

  • Lee, Chan Joo;Kim, Won;Kim, Chi Young;Kim, Dong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4B
    • /
    • pp.329-337
    • /
    • 2009
  • In this study we briefly introduce the electronic float system based on the GPS and RF communication technology and present some field application results. The system is capable of operating 15 floats simultaneously for making discharge measurement. Since the electronic floats (EFs) acquire flow paths, they can improve velocity measurement accuracy up to 10%. Additionally, measured velocities by the EFs show good agreement with those by an ADCP. Relative difference in sub-section area calculated by the electronic and conventional float methods is -79~71% and, due to convergent tendency of floats flowing along near banks, it increases much larger. It is possible to improve accuracy up to 5~6% in making discharge measurement by the electronic floats at site with irregular flow paths and section arrangement. The electronic float system is capable of calculating more accurate velocity and section area using position information based on GPS. By real-time measurement of velocity, cross-section area and discharge, the electronic float system is expected to reduce manpower and improve accuracy, rapidity and efficiency of flood discharge measurements.

A Correlation Analysis between International Oil Price Fluctuations and Overseas Construction Order Volumes using Statistical Data (통계 데이터를 활용한 국제 유가와 해외건설 수주액의 상관성 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.273-284
    • /
    • 2024
  • This study investigates the impact of international oil price fluctuations on overseas construction orders secured by domestic and foreign companies. The analysis employs statistical data spanning the past 20 years, encompassing international oil prices, overseas construction orders from domestic firms, and new overseas construction orders from the top 250 global construction companies. The correlation between these variables is assessed using correlation coefficients(R), determination coefficients(R2), and p-values. The results indicate a strong positive correlation between international oil prices and overseas construction orders. The correlation coefficient between domestic overseas construction orders and oil prices is found to be 0.8 or higher, signifying a significant influence. Similarly, a high correlation coefficient of 0.76 is observed between oil prices and new orders from leading global construction companies. Further analysis reveals a particularly strong correlation between oil prices and overseas construction orders in Asia and the Middle East, potentially due to the prevalence of oil-related projects in these regions. Additionally, a high correlation is observed between oil prices and orders for industrial facilities compared to architectural projects. This suggests an increase in plant construction volumes driven by fluctuations in oil prices. Based on these findings, the study proposes an entry strategy for navigating oil price volatility and maintaining competitiveness in the overseas construction market. Key recommendations include diversifying project locations and supplier bases; utilizing hedging techniques for exchange rate risk management, adapting to local infrastructure and market conditions, establishing local partnerships and securing skilled local labor, implementing technological innovations and digitization at construction sites to enhance productivity and cost reduction The insights gained from this study, coupled with the proposed overseas expansion strategies, offer valuable guidance for mitigating risks in the global construction market and fostering resilience in response to international oil price fluctuations. This approach is expected to strengthen the competitiveness of domestic and foreign construction firms seeking success in the international arena.

Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study - (친환경 리모델링 철거공사의 최적 TACT공정 개발 - 사례연구를 중심으로 -)

  • Woo, Joong-Pyung;Kim, Ki-Hyun;Hwang, Young-Gyu;Kim, Kyung-Rai;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.3-12
    • /
    • 2011
  • Technology based civilization has made a sustained advancement, resulting in economic growth and material prosperity. The outcome was the beginning of environmental destruction. Especially, in regard to construction, it has been recognized as a key culprit for pollution. As such, the construction industry has recently shown interest in the environment, as it has been applying environment friendly method of construction and reducing wastes. As the number of old common housing increases in our country, reconstruction and remodeling are implemented as a means of improvement. However, it can be said that remodeling is the inevitable option because of cost and environmental problems associated with reconstruction. As part of its feature, remodeling work is preceded by removal work. And, removal work inevitably creates construction wastes. Treatment of wastes that takes into consideration environmental aspects is important and for this, removal work that is based on environment friendly remodeling to ensure selective separation must be implemented. Yet, a removal work based on environment friendly remodeling has a lower level of output compared to existing methods. Because remodeling work by its nature has a post construction work which proceeds after it, securing work efficiency is important as the removal work is a critical path activity. Thus, the present study improves the work process of a removal work that is based on environment friendly remodeling so that it becomes a work process that includes work efficiency. For this, as a case study, old common housing has been selected, and a TACT process has been developed which is based on data acquired from environment friendly removal work. And, this study develops an optimal TACT process which is based on environment friendly remodeling by conducting a simulation for a 15 floor apartment.

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.

A Strategy to Improve Customer Service for Apartment Building Units (공동주택 상품의 고객서비스 개선 전략 연구)

  • Lee, Hyun-Min;Lee, Dong-Hoon;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.163-172
    • /
    • 2009
  • As customers are becoming increasingly important in corporate management, there is a growing demand for migration to customer-focused organizational structures. Unlike the manufacturing industry, the construction industry is non-iterative and non-standardized. As a result, a wide variety of materials, human resources, technologies and equipment must be mobilized in complex work activities to complete a structure. Consequently, surprises are bound to occur as such work activities progress. This paper intends to study a strategy that is designed to improve customer services for apartment building units. It aims primarily to focus on cost control and brand management. Housing tenants and industry experts are surveyed to collect input for issue analysis. In addition, the external circumstances and internal capabilities of major builders in Korea are analyzed, and a SWOT analysis is performed regarding market conditions related to customer service. These analysis results are utilized to develop a strategy implementation plan over different time frames, and the operational resources available for such strategy implementation are analyzed in order to forecast its performance. This research will facilitate communication between construction companies in Korea and their customers by proposing a customer service improvement strategy for apartment building units, and is expected to provide resource material for a strategic analysis of efforts to fully incorporate customer requirements

Strategy for Facilitating Old Aged Apartment Remodeling through Technology Analysis for Space Expansion (노후공동주택 리모델링시의 평면확장 적용공법 분석을 통한 활성화 방안 수립)

  • Lee, Dong-Gun;Cha, Hee-Sung;Kim, Wan-Hyuk;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.147-155
    • /
    • 2008
  • In the 1970s, increasing penetration of the housing co-housing policy, reconstruction be a great success to improve 1990‘s Old aged apartment's performance. However, in case of reconstruction, it causes the problem such as city environment destruction, resource waste, real-estate speculation etc. With the trend of sustainable construction and resource recycling, remodeling gets more attention than before. In case of country's remodeling, conventional method causes some problems such as delayed construction period and increased cost. Therefore, efforts that obtain economical efficiency are required to power remodeling through use of prefabrication method like PC technology that is useful for reduction effect of construction period, cost and site labor and excellent quality. This research indicates reduceing factor for facilitating prefabrication method and technology selecting framework through specific of Expanding Floor method and remodeling cases to increase the efficiency of remodeling, considers construction parties approaching plan for prefabrication as occasion that powers remodeling.

Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects (해외 LNG Plant 프로젝트 초기 프로세스 분석 및 지식관리시스템 프로토타입 구축)

  • Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.151-159
    • /
    • 2009
  • Recently, overseas construction projects have been increasing in the Middle East and Southeast Asia regions. These projects require various licenses and technologies for the manufacturing and handling processes. Additionally, the efficiency of the entire process management life cycle determines the success or failure of the business. Nonetheless, there exist various risks involved in the whole life cycle process due to a lack of experience and knowledge of management techniques. The objective of this paper is to analyze the business process of a LNG plant throughout the pre-construction and procurement phases, and to identify the knowledge and information needed for the development of the KMS. The study also plans to build a comprehensive knowledge management system throughout the whole life cycle as its final objective.

The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project - (대형 건축 턴키공사의 클레임예방을 위한 클레임 요인 분석에 관한 연구 - 국내 사례를 중심으로 -)

  • Yoon Jun-Seon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.205-211
    • /
    • 2005
  • Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.