• Title/Summary/Keyword: 건설공정관리

Search Result 656, Processing Time 0.036 seconds

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

An Experimental Study on the Behavior of Curved Panel Parts Using Composite Materials (복합소재를 활용한 곡면 패널의 부재단위 성능 평가)

  • Park, Hee Beom;Park, Jong-Sup;Kang, Jae-Yoon;Jung, Woo-Tai
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.474-480
    • /
    • 2018
  • FRP is a new material that is lightweight, has high strength and high durability, and is emerging as a third construction material in many countries. The composite material panel targeted in this study was a curved member and is the most frequently used arch-shaped member of a structures, such as tunnels. Composite curved panels can be produced in high quality and large quantities through automation operations. On the other hand, the frequency of application is low, and the design criteria and experimental data are lacking. Therefore, this study examined the mechanical performance of the member unit first to verify its performance as structural members of the FRP curved panel. For this purpose, tensile, compression, and connection performance tests were carried out. The tensile tests showed greater tensile strength of specimens with larger curvature, and the compression tests showed that the composite section of a composite material has greater compressive strength than the concrete section. Finally, the test of the performance of the connection showed that the attachment performance of the connection was more than equal to that of the FRP composite material panel.

Development of 4D System based on New Methodology for Visualizing Construction Schedule Data for Civil Engineering Projects (토목시설물 공사관리 시각화를 취한 4D시스템 적용방안)

  • Kang, Leen Seok;Jee, Sang Bok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.95-103
    • /
    • 2006
  • One of the main functions of the 4D system includes visualizing numerical schedule data in construction. The existing 4D tools have an excellent function for simulating building projects that all activities are progressed according to vertical work zone. However, it is not easy to implement all of it in the civil engineering project because the construction activities of highway and railway projects are progressed on the horizontal work zone and the 4D simulation for those projects should include earthwork objects that depend on the natural ground condition. This study suggests a new methodology for improving those limitations of 4D system for the civil engineering project and develops a new system by the suggested methodology. To verify the developed system, this study attempts to simulate 4D object for horizontal elements such as earthwork, paving work and tunneling work. The morphing and multi-texturing techniques developed in the study can be new approaches to simulate 4D object for the earthwork such as cutting and banking whose activities are progressed on the natural ground condition. The research results can be expected as a draft function for improving the application of 4D system in civil engineering projects.

An Experimental Study on the Structural Performance of Lateral Resistance in Steel Elevator Pit (강재엘리베이터 피트 측압저항 구조성능에 관한 실험적 연구)

  • Hong, Seong-Uk;Kim, Tae-Soo;Baek, Ki-Youl
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2019
  • Steel elevator pit was developed for the purpose of minimizing the excavation, simplifying the construction of the frame and economical efficiency by improving the problems that occurred in the existing reinforced concrete. It is common to apply conventional RC method through excavation to underground structures such as underground floor collector well and elevator pit. In recent years, the use of steel collector well and steel elevator pits to reduce construction costs by minimizing the materials of steel and concrete has been continuously increasing. The steel elevator pit is an underground structure and then the performance of the welding part and the structure system is important. Specimen with only steel plate and concrete without studs could support the load more than 3 times than the specimen with deck only. Therefore, even if there is no stud, the deck (steel plate) rib is formed and the effect of restraining the steel plate and the concrete during the bending action can be expected. However, since sudden fracture in the elevator pit may occur, stud bolt arrangement is necessary for the composite effect of steel plate and concrete. It is expected that the bending strength can be expected to increase by about 15% or more depending with and without stud bolts.

Impact Evaluation of Water Footprint on Stages of Drainage Works (배수공 각 작업 단계별 물발자국 영향평가)

  • Chen, Di;Kim, Joon-Soo;Batagalle, Vinuri;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.2
    • /
    • pp.225-231
    • /
    • 2020
  • Fresh water that can be used by a person of the total amount of water on the planet is increased because it is less than 0.01 % except underground water, ice and snow, etc. water management response need. In order to protect and efficiently utilize water resources, major countries are conducting water footprint studies that can quantitatively estimate the amount of water put into the operating phase of the resource harvesting phase, mainly agriculture. Korea has also recently developed a number of policies in order to cope with water shortages, and in the construction industry, as well as the need for basic research to support it has been emphasized. This study was constructed DB up to the raw material harvesting step, the transport step, the production stage in order to estimate the water consumption of resources to be put into the work process to target the drainage of the road. Water usage estimation method was utilized the method presented in the Water Footprint Manual and the environmental score card certification guide, unit water usage each drainage main method was calculated after estimating the water footprint considering the water character factor, indirect water and the direct water, the water consumption factor of material input to each process. Brown asphalt, rebar, remicon of the drainage material as a result of the water footprint calculation accounted for 97 % of the total. Drainage method is a culvert, a side channel, a culvert wing wall, reinforced concrete open channel accounted for 92.2 % of the total. Drainage total step-by-step calculated water consumption and water footprint was found in order of raw material harvesting step, transport stage, production stage. Water footprint each drainage method or total drainage material calculated in this study can be used as a base data in the agricultural and construction sectors. In order to increase the reliability of the analysis, it is believed that further overseas databases will be needed for continuous review and research.

A Study on Leaching Characteristics of $Cr^{6+}$ in Cement Grout Materials (시멘트 그라우트재에서 $Cr^{6+}$용출특성에 관한 연구)

  • 김동우;이재영;천병식
    • Journal of Soil and Groundwater Environment
    • /
    • v.8 no.2
    • /
    • pp.62-69
    • /
    • 2003
  • The aim of research is the evaluation of the $Cr^{6+}$ emission features of the liquid injection through emission experiments in varying conditions, based on a field-mixing ratio. The results showed that the content of $Cr^{6+}$ content in cement measured had an Ordinary Potland Cement (OPC) of 25.3 mg/kg, which constitute the largest portion among the other materials. Likewise, the emission experiment of homo-gel and sand-gel generally satisfied the standard of KSLT (Korea Standard Leaching Test) in waste of 1.5 mg/L, but in case of the standard of KSLT in soil the emission of OPC $Cr^{6+}$ of 4.85 mg/kg. These conditions is a little exceeded the criteria in the ‘Ga’ area in terms of Korea Soil Environmental Preservation Law. In addition, results generated by the mock-up injection facilities revealed that $Cr^{6+}$ emission increased as Water/Cement and injection pressure increased. At injection pressure higher than 4 kg/㎤, $Cr^{6+}$ emission exceeded the water preservation standard of 0.5 mg/L. Similarly, a pattern experiment of C $r^{6+}$ emission according to pH was conducted, in order to evaluate the $Cr^{6+}$ emission features of grout materials in leachate below pH 5 such as pH 4 acid rain or landfill. Results show that $Cr^{6+}$ emission dramatically increased in high acidic or basic state. It indicates that $Cr^{6+}$ emission will probably increase in an environment where grout materials are injected. On the other hand, concentration of leachate was determined in areas where grout materials are used. The results show that the concentration of emission in an ultra purity condition does not manifest intensity, and is affected in the OPC>MC>SC order. It means that the pollutants or $Cr^{6+}$ emission increases with decreasing concentration. As such, $Cr^{6+}$ emission will probably exceed the countermeasure criteria according to the types of gout materials. Similarly, high pressure or injection will cause increased $Cr^{6+}$ emission. Therefore, the selection of materials or mixing ratio should be considered in general as well as according to specific industries, based on the strength and pH of $Cr^{6+}$ emission.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

A Study on the Circulating Water Purification System using Oxygen Solubilization and Diffusion Device (산소용해수와 확산장치를 결합한 순환형 수질정화 장치의 검증)

  • Ahn, Chang-Hyuk;Song, Ho-Myeon;Joo, Jin-Chul;Lee, Yeon-Ku;Kim, Il-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.318-318
    • /
    • 2011
  • 자연수를 가압(4~5기압)하면서 물과 공기의 비를 4:1~3:1로 혼합하면 수체 내 초미세기포(Diameter $3{\sim}10{\mu}m$)가 발생하는데 이를 산소용해수라 하며 수질정화시설 또는 양식장 등에 널리 사용되고 있다. 산소용해수의 특징은 기포의 비표면적이 넓고 10시간 이상 포화 농도를 유지하여 수체에 잔류하는 시간이 길기 때문에, 일반 산기석을 활용한 포기나 순산소 용해 등의 타 방법과 구별된다. 산소용해수의 산소전달효율은 기존 방법과 큰 차이를 보이기 때문에 실제 적용시에는 대상수를 이용하여 산소전달계수($K_{L}a$)를 사전에 산정할 필요가 있다. 본 연구에서는 한국건설기술 연구원의 안동 수자원 환경실험센터 내 실외형 콘크리트 사각반응수조에 산소용해장치 및 확산장치를 결합한 일체형 시스템을 적용시켜 2010년 9월~2011년 1월의 5개월간 결과를 분석, 본 장치의 $K_{L}a$를 산정 후 수질정화의 활용 면에서 검토하였다. $K_{L}a$의 산정에는 다양한 방법이 이용되나 용존 산소 농도의 제어에 한계가 있는 실외 대형실험장에 적합한 Lewis and Whitman의 Two-film 이론에 근거한 정상포기법을 적용하였다. 체적 $80m^3$의 수조 내에서 현장 유지용수를 대상으로 실험한 결과 산소전달계수는 $0.324\pm0.050$/min, 포화농도는 8.64 mg $O_2$/L, 도달시간은 11 /min이 산정되었으며, 이는 기존 산기석 포기의 산소전달계수 범위인 $0.105\pm0.019$ /min보다 약 3.1배 높은 결과를 보였다. 또한, 확산장치의 수류 순환 방향 및 정도를 검토하기 위하여 실험수조에서 1m단위로 격자를 구성한 후 초음파 유속계로 실측한 결과 0.0~2.5 m/s 의 평면적 유속범위를 도출하였다. 그리고 전체 순환을 고려했을 때 용존산소는 약 8시간 후 8.64 mg $O_2$/L 값에 도달하여 안정화 되었으며, 강한 수류순환과 산소용해수에 의해 하상에 존재하는 퇴적물들의 이송 및 산화촉진을 유도하였다. 이를 근거로 실험수조의 체적과 기준 가동시간인 8시간을 적용시켰을 때, 실험구 수질은 대조구와 비교하여 COD, T-N, T-P가 모두 25~35% 개선되었다. 이 결과는 여과공정 없이 단순 순환만을 고려한 물리적 수질정화 방법의 단독 활용 가능성을 나타내며, 기존 연구에서 나타난 SOD (Sediment oxygen demand) 저감 능력을 감안할 때 향후 폐쇄성 수역의 수질관리에도 효율적으로 활용할 수 있음을 시사한다.

  • PDF

Warm Start Up Time Reduction Through the Increase of Boiler Water Circulating Pump Inlet Water Temperature Rate of the Thermal Power Plant (관수온도 상승률 증가에 의한 발전용 보일러의 온간기동시간 단축에 관한 연구)

  • Kang, Hee-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.10 no.1
    • /
    • pp.47-53
    • /
    • 2014
  • The national capacity of electricity of Korea was 81,737 MW and the peak demand was renewed by the record of 71,230 MW in 2012 which has been increasing since the first lighting ceremony had taken place in the Royal Palace(Kyung-Bok Goong) in 1887. Aa the counteract on the rapid increasing of the demand, Korean government is constructing and operating the high capacity nuclear and thermal power plants, however, the operating reserve on weekdays is small while those of weekends are more than 40% of capacity, so they are providing the pumped-storage power plants with the surplus electricity during weekends and operating the power plants which cost higher production price and located in the capital area with WSS (Weekly Start and Stop) mode including the Seoul Thermal Power Plant. Since the Seoul Thermal Power Plant is spending huge amount of expenses for more than 30 times of the WSS annually due to the high production cost even though it is in Seoul, the core of the demand, I chose the power plant unit #5 which was on the grid in 1969 for the case to confirm reducing 23% of the warm start-up time by applying the "Start-up time management program", and that reducing 35% of the water temperature increasing time by accelerate the increasing rate of the inlet temperature of the water circulating pump.

  • PDF

A Fundamental Comparison and Enhancement of Simulation and Optimization Modeling Approach for Multiple Reservoir Operation (댐군 연계운영에서 시뮬레이션 기법과 최적화 모형 활용기법의 원론적 비교 및 개선방법에 대한 연구)

  • Kong, Jeong-Taek;Kim, Jae-Hee;Kim, Sheung-Kown
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.118-118
    • /
    • 2012
  • 수자원의 효율적 이용 및 관리는 심화되고 있는 기후변화에 선제적으로 대응하고 발생가능한 물위기에 대비하기 위한 필수조건이다. 그 중 가장 핵심이 되는 요소는 댐에 저수된 물을 효과적으로 이용하는 것, 즉 댐 건설목적에 따라 시간 및 공간별로 적절하게 할당시키는 것이라고 할 수 있다(Kim, 1998). 그러나 단일 댐의 운영과는 달리 수계내 댐군의 연계 운영은 매우 복잡하고 어려운 문제이다. 연계된 댐들간 저수 상황을 고려하여 유역내 시 공간적인 용수 수요의 지속적인 충족을 위하여 유입량 예측의 정확성을 높이도록 하고, 상류 댐에 최대한 저류하도록 하며, 여수로 방류 같은 불필요한 방류를 최소화 하고, 서로 상충되는 목표를 갖고 있지만, 홍수용량 및 발전수위를 최대로 확보하도록 하여야 한다. 이처럼 댐 운영을 위한 실제 상황은 단일 목적에 의한 최적화와는 달리 여러 상충되는 목적 및 구성 요소들간의 타협, 조정을 필요로 한다. 댐군의 연계운영 문제는 1960년대 초부터 현재까지 활발히 연구가 진행되어 온 분야 중 하나이나 문제의 복잡성과 어려움으로 인해 아직까지도 최선의 방안을 제시하기 어려운 문제이다(ReVelle, 2000). 이를 위한 방법은 시뮬레이션 모형 활용기법과 최적화 모형 활용기법으로 대별할 수 있으며 각 방법의 서로 다른 구조적 특성과 장단점으로 인하여 이원화된 체계로 사용되는 것이 현재의 국내 실정이다. 대부분의 실무에서는 이해도도 쉽고, 비교적 결과를 빨리 도출할 수 있는 시뮬레이션 기반의 모형을 활용하며 대표적으로 HEC-5, K-ModSim, HEC-ResSim 등이 활용되어왔다. 반면, 학계에서는 DP, MIP, SLP, SDP 등 최적화기법을 댐운영에 활용 할 것을 제안하고 있지만, 활용에 대한 거부감이 남아있는 것이 현실이다. 본 연구에서는 시뮬레이션과 최적화기법의 원론적 비교를 통해 각 방법의 장단점과 한계점을 분석하고, 왜 이원화된 사용체계로 되었는지에 대한 고찰과 이에 대한 해결책으로 시뮬레이션모형의 장점과 최적화기법의 장점을 결합한 모형을 제안한다. 국내에는 Kim and Park(1998)이 시뮬레이션 기반의 최적화 모형 CoMOM(Coordinated Multi-Reservoir Operating Model)을 개발하였으며, 이후 21C프론티어 연구사업(2001-2011)에서 모형의 보완수정 검증을 통해 실무 활용도를 높여 왔다. 본 연구를 통하여 거부감의 원천을 추적해 보고, 타당한 이유가 있는지 대한 것을 심층 분석해보고, CoMOM모형과 시뮬레이션 모형, 다른 최적화 기법들과의 원론적 비교를 통해 각 방법들의 효율적인 활용방안과 최적화모형의 구체적인 활용방안을 제시하고자 한다.

  • PDF