• 제목/요약/키워드: 건설공정관리

Search Result 657, Processing Time 0.022 seconds

Automation of Sampling for Public Survey Performance Assessment (공공측량 성과심사 표본추출 자동화 가능성 분석)

  • Choi, Hyun;Jin, Cheol;Lee, Jung Il;Kim, Gi Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.95-100
    • /
    • 2024
  • The public survey performance review conducted by the Spatial Information Quality Management Institute is conducted at the screening rate in accordance with the regulations, and the examiner directly judges the overall trend of the submitted performance based on the extracted sample. However, the evaluation of the Ministry of Land, Infrastructure and Transport, the evaluation trustee shall be specified by random extraction (Random Collection) is specified by the sample. In this study, it analyzed the details of the actual site and analyzed through securing actual performance review data. In addition, we analyzed considerations according to various field conditions and studied ways to apply the public survey performance review sampling algorithm. Therefore, detailed sampling criteria analysis by performance reviewers is necessary. A relative comparison was made feasible by comparing the data for which the real performance evaluation was performed with the outcomes of the Python automation program. This automation program is expected to be employed as a foundation program for the automated application of public survey performance evaluation sampling in the future.

Structural Safety Analysis of Openable Working Table in ACP Hot Cell for Spent Fuel Treatment (사용후핵연료 처리를 위한 ACP 실증시설내 개폐형 작업대의 구조적 안전성 평가)

  • Kwon, Kie-Chan;Ku, Jeong-Hoe;Lee, Eun-Pyo;Choung, Won-Myung;You, Gil-Sung;Lee, Won-Kyung;Cho, Il-Je;Kuk, Dong-Hak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.1
    • /
    • pp.17-24
    • /
    • 2006
  • A demonstration facility for advanced spent fuel conditioning process (ACP) is under construction in KAERI. In this hot cell facility, all process equipments and materials are taken in and out only through the rear door. The working table in front of the process rear door is specially designed to be openable for the efficient use of the space. This paper presents the structural safety analysis of the openable working table, for the normal operational load condition and accidential drop condition of heavy object. Both cases are investigated through static and dynamic finite element analyses. The analysis results show that structural safety of the working table is sufficiently assured and the working table is not collapsed even when an object of 500 kg is dropped from the height of 50 cm.

  • PDF

A Study on Countermeasures for Risk Factors Through Risk Analysis of Earthwork (흙막이공의 리스크 분석을 통한 리스크 요인별 대응 방안에 관한 연구)

  • Jeon, Byung Ju;Isah, Muritala Adebayo;Kim, Hyun Bee;Lee, Yang Gyu;Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.681-688
    • /
    • 2022
  • According to a recent study, most construction companies in Korea do not manage risk effectively, and it is judged that the risk management system needs to be improved. In addition, most risk-related studies deal with risks from a macroscopic perspective, and there are few studies dealing with process risks at the project construction stage. Therefore, this study tried to suggest a risk response plan through analysis and classification of risk factors that may occur in retaining work among process risks. To this end, a workshop was held for risk experts to identify and analyze risks that may occur during the construction of retaining work for apartments. As a result of the study, it was expected that savings of KRW 4.97 billion would be possible in the 95 % confidence interval, and the maximum possible cost was reduced from KRW 15 billion to about KRW 10 billion. Based on the risk reduction ratio, it was found that risks that can be reduced without any special input cost, risks with large effects in response to risks, and risks with insignificant effects were found. Therefore, using the types and risk factors presented in this study as guides, it is expected that it will be helpful in successfully operating the project if an appropriate response strategy is prepared and systematically responded to the site conditions.

A Study of Design Parameter for the Field Application of High Performance Permanent Form (HPPF) Using Stainless Steel Fiber (스테인레스 강섬유를 이용한 고성능 영구거푸집적용 벽체구조물의 설계변수 연구)

  • Sim, Jong Sung;Oh, Hong Seob;Ju, Min Kwan;Ha, Woo Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.59-66
    • /
    • 2008
  • In the construction site, to improve the man-dependent form work, non-stripping form has been studied but the developed non-stripping form was hard to applied with respect to the cost, form size and performance. This study is for evaluating the adaptability of the developed non-stripping form named as high performance permanent form (HPPF). To do this, the analytical approach and parametric study were performed based on the research for fundamental material characteristic of the HPPF. The target concrete structure is a wall structure because of its effectiveness of HPPF. To evaluate the structural efficiency of the HPPF applied wall structure, FEM analysis was performed to decide the maximum placing height at one time then it was applied to design the wall structure. In the result of the analysis, the HPPF applied wall structure showed the lots of advantages that it can reduce the cost resulted from reducing concrete and steel rebar even if it has same structural performance to the conventional concrete wall structure with same dimension. With this analysis result, it can be evaluated that the HPPF applied concrete structure can be a concrete structure with the long term durability in site.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

A Case Study on Multiple-deck-charge Blasting with Electronic Detonators (전자뇌관과 다단장약을 이용한 발파 사례 연구)

  • Ko, Tae Young;Shin, Chang Oh;Lee, Hyo;Lee, Seung Cheol
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.52-58
    • /
    • 2012
  • A TBM launching shaft in DTL2 Contract 915 site is located in a typical hard Bukit Timah granite formation and lots of blasting work is required for shaft sinking. The original blast design used the electric detonator and ANFO blasts consisting of 30 holes per one blast with 1.5 m depth of drilling hole. However, significant delay of work and poor progress were expected due to the limitation of the number of blasting hole and strict vibration regulation on retaining systems. To overcome such constraints, an efficient new blasting method which can improve productivity and satisfy vibration limit was required. The revised blast design, using triple-deck blasts with electronic detonators and cartridge emulsion explosives, gives better construction performance and can reduce construction time. Such a new blasting technique can be effectively used for similar underground projects in the future where the volume of rock blasting is significant.

Evaluating Carbon Dioxide Emission from Cadastral Category based on Tier 3 Approach (Tier 3 방식에 의거한 지목별 온실가스 배출 실태평가)

  • Kim, Dae-Ho;Um, Jung-Sup
    • Spatial Information Research
    • /
    • v.19 no.3
    • /
    • pp.11-22
    • /
    • 2011
  • It is usual for the carbon dioxide emission to be calculated by official energy consumption statistics produced from a number of specialized industrial process such as refinery, power plant etc. The aim of this research was to evaluate potential of cadastral system in monitoring carbon dioxide emitted from land use. An empirical study for a cadastral category was conducted to demonstrate how a on-site measurement can be used to assist in estimating the carbon dioxide emission in terms of land use specific settings. The cadastral category based analysis made it possible to identify area-wide patterns of carbon dioxide emission, which cannot be acquired by traditional Government statistics. It was possible to identify successively increasing trends in the human-related parcels such as housing land while decreasing trends of carbon dioxide in sink parcels(eg. forest). The results indicate that the cadastral parcel could be used not only as a tool to monitor carbon dioxide emission, but also as an evidence to restrict initiation of development activities causing negative influence to carbon dioxide emission such as road construction. As a result, the research findings have established the new concept of "carbon dioxide emission monitoring based on cadastral category", proposed as an initial aim of this paper.

A Pre-study on Roh Hoe-chan Archives (노회찬 아카이브 기초 연구)

  • Ju, Hyun Mi
    • The Korean Journal of Archival Studies
    • /
    • no.68
    • /
    • pp.243-279
    • /
    • 2021
  • Rep. Roh Hoe-chan is a representative politician in Korean progressive politics. From the labor movement to the workers' political organization movement, they devoted themselves to the movement to build a progressive party. As a member of the 17th, 19th, and 20th National Assembly, he carried out legislative activities. The record he left is the record of the political power of workers, the record of the progressive party, and the record of a politician who suffers and practices. Also, as the son of a displaced person, as a student activist suffering from the restoration period, it is also a record of a human being of cultural literacy who played the cello. Archivist's basic research is expected to play a role in creating a virtuous cycle of archive management by structuring the archive and presenting various access points to various users, allowing more diverse research and use in the future.