Journal of the Korea Institute of Building Construction
/
v.14
no.4
/
pp.314-321
/
2014
Nuclear power plant projects are being increased all over the world. The construction of nuclear power plants needs huge money and time, which makes conducting a detailed analysis of productivity through the whole process. Reinforced-concrete works productivity field data was collected for more than one year and analyzed from a nuclear-power-plant project in Korea. The productivities of formwork, rebar-work, and concrete pouring were $0.54m^2/man{\cdot}day$, $0.06ton/man{\cdot}day$, $1.98m^3/man{\cdot}day$, respectively. Moreover, it is revealed that 'Day of the Week' is a driver of the formwork activity and 'Overtime' is for all of the three. The results will be a great interest of industry personnel estimating time and cost of a new nuclear power plant.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.7
/
pp.1-7
/
2019
To overcome the limitations of existing rainwater drainage systems, we compared and analyzed a newly developed eco-friendly channel-type rainwater drainage system. We also developed an integrated evaluation index to quantify the improvement of the new system. The concept of Life Cycle Assessment (LCA) was applied to calculate and compare the costs of each process and to develop the integrated evaluation index, which considers the carbon emissions by each process. As a result, the cost was reduced by 53% overall compared to an O-type system and by 63% compared to a U-type system. In addition, when applying the integrated evaluation index, the new system was evaluated to be over 80% in the four processes compared to the existing systems. When applying the evaluation index to sites in Anyang and Incheon, the new system was improved by 35-100% compared to existing systems.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.72-75
/
2009
본 논문에서는 현재 국내에서 구축되어 있지 않은 3차원 BIM 기반 설계 및 시공 환경으로의 패러다임 전환에 대비하여 3차원 BIM 지향적 구조설계 프로그램인 SDP 제품군을 사용하여 BIM 프로그램들을 연동한 3차원 BIM 철근배근 자동생성 시스템을 개발하고자 한다. 현재 국내 건설업계의 치열한 수주경쟁으로 수익률저하/철근 등 자제가 폭등/인건비 상승/배근시공도 작성 인력 부족 및 신뢰성 저하 및 납기 지연 등의 기존 현황의 문제점 등을 SDP 제품군을 이용하여 구조설계/배근시공도 작성/정밀 골조물량 산출을 통합 지원하는 엔지니어링 컨설팅 환경을 구축하여 구조설계 시 V/E 동시 수행, 골조공사비 10% 절감, 배근시공도 및 물량산출 납기 최소로 단축, 배근시공도 정확성 향상/설계 및 시공 변경에 신속 대응, 공정 대비 발주 물량 관리 기능을 제공함으로써 고수익, 고효율, 고품질 의 엔지니어링 컨설팅 수행이 가능하다. 3차원 BIM 을 기반으로 철근현장가공에서 공장가공 전환 가속화로 국가적 물량 절감을 기대할 수 있고, 3차원 BIM 구조설계 및 골조공사 환경 구축 및 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.
Korea Mechanical Construction Contractors Association
월간 기계설비
/
no.4
s.201
/
pp.30-36
/
2007
ESCO란 에너지 절약회사(Energy Saving Company) 또는 에너지 서비스 회사(Energy Service Company)를 뜻하는 용어로 지난 1992년 정부에서 에너지 절약을 촉진하기 위해 정책자금을 도입하면서 등장했다. 이들 기업은 정부에서 정책자금을 빌려 공장이나 아파트 등 에너지 사용자에게 에너지 절약시설을 지어주고 에너지를 줄인양만큼 투자비를 회수해 간다. 고유가가 계속되면서 에너지절약 전문기업인 ESCO 단위 사업규모가 점차 대형화되고 있다. ESCO 투자실적은 1998년 이후 에너지절약 시설 개체 사업의 급속한 증가에 힘입어 매년 급격히 성장하고 있다. 최근에는 2천억원대의 시장규모를 가지고 2005년에는 건당 평균 9.1억원이 지원된 것으로 나타났다. 에너지관리공단 자금지원팀의 자료에 의하면 ESCO투자사업 자금지원은 1993~1998년 197건에 480억원이 지원됐으나 2005년에는 202건에 1,829억원이 지원된 것으로 나타났다. 지난 2006년 9월 말 현재 ESCO투자사업 자금지원은 106건에 1,020억원이 대출 은행에 추천된 것으로 알려졌다. 또한 에스코 사업분야가 조명기기·보일러 등 단순설비 교체에서 열병합발전소·냉난방설비, 공정개선 및 폐열회수 등 복합설비 쪽으로 확대되고 있는 것으로 나타났다. 따라서 에너지 소비가 큰 화학 철강 제지 등 산업체, 대형병원, 산업단지 등이 새 에너지 절감 시스템을 도입하면 에너지 효율성 개선에 효과적인 사업이다. 본지는 지난호에 ESCO사업 현황과 투자사례를 게재하고, 이번호에는 ESCO사업 지원시책과 외국의 ESCO활동 현황 및 국내의 ESCO 투자사례를 게재할 계획이다.
Korea Mechanical Construction Contractors Association
월간 기계설비
/
no.1
s.198
/
pp.35-42
/
2007
ESCO란 에너지 절약회사(Energy Saving Company) 또는 에너지 서비스 회사(Energy Service Company)를 뜻하는 용어로 지난 1992년 정부에서 에너지 절약을 촉진하기 위해 정책자금을 도입하면서 등장했다. 이들 기업은 정부에서 정책자금을 빌려 공장이나 아파트 등 에너지 사용자에게 에너지 절약시설을 지어주고 에너지를 줄인양만큼 투자비를 회수해 간다. 고유가가 계속되면서 에너지절약 전문기업인 ESCO 단위 사업규모가 점차 대형화되고 있다. ESCO 투자실적은 1998년 이후 에너지절약 시설 개체 사업의 급속한 증가에 힘입어 매년 급격히 성장하고 있다. 최근에는 2천억원대의 시장규모를 가지고 2005년에는 건당 평균 9.1억원이 지원된 것으로 나타났다. 에너지관리공단 자금지원팀의 자료에 의하면 ESCO투자사업 자금지원은 1993~1998년 197건에 480억원이 지원됐으나 2005년에는 202건에 1,829억원이 지원된 것으로 나타났다. 지난 2006년 9월 말 현재 ESCO투자사업 자금지원은 106건에 1,020억원이 대출 은행에 추천된 것으로 알려졌다. 또한 에스코 사업분야가 조명기기·보일러 등 단순설비 교체에서 열병합발전소·냉난방설비, 공정개선 및 폐열회수 등 복합설비 쪽으로 확대되고 있는 것으로 나타났다. 라서 에너지 소비가 큰 화학 철강 제지 등 산업체, 대형병원, 산업단지 등이 새 에너지 절감 시스템을 도입하면 에너지 효
율성 개선에 효과적인 사업이다. 지는 이번호에 ESCO사업 현황과 투자사례를 게재하고, 다음호에는 ESCO사업 지원시책과 외국의 ESCO활동 현황 및 국내의 ESCO 투자사례를 게재할 계획이다.
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.244-244
/
2022
4차 산업혁명에 따라 유역 및 하천관리 사업, 각종 풍수해 예방사업 분야에 다양한 스마트기술이 도입되고 있으나 건설현장 침수 피해 사고는 지속적으로 발생하고 있다. 굴착공사 현장에서 발생할 수 있는 침수피해를 사전에 예측하기 위해서는 공정별로 변화하는 현장상황을 반영하여 다양한 강우 시나리오를 기반으로 침수 예측 모델링이 선행되어야한다. 따라서 본 연구에서는 2차원 동수역학 모형인 HDM-2D 모형을 기반으로 굴착공사 현장 침수피해 예측 모델을 개발하여 굴착공사현장 침수 예·경보 시스템에 탑재하고자 한다. 침수피해 예측 모델은 천수방정식을 Petrov-Galerkin stabilized scheme 으로 이산화하여 해석하는 수평 2차원 동수역학 흐름해석모델로서 수로 및 지표면 등 다양한 지형 상황에서의 물 흐름을 상세하게 해석할 수 있다. 지형자료 생성 이후 경계조건 부여를 통해 수행되며 침수발생지역의 유속, 수심, 수위를 취득할 수 있다. 배수지나 굴착공사 현장에 2차원 흐름해석을 적용하는 경우 지형의 경사나 배치가 공간에 따라 변화하므로 불연속적인 흐름을 유발하여 모의결과의 계산 오차를 검토해야 한다. 2차원 침수피해 예측 모형의 정확성을 확인하기 위해 지면 돌출부가 있는 흐름 문제와 테스트베드 대상지에 침수해석 모형을 적용하였다. 돌출부 흐름 문제의 경우 돌출부를 지나며 발생하는 유속과 수심 모의 결과를 상용모형과 비교검증 하였으며 테스트베드 대상지역에 침수피해예측모형을 적용했을때 지형 경사에 따른 흐름의 변화와 침수양상을 확인할 수 있었다.
Park, Cheol-Woo;Park, Kyung-Hoon;Hwang, Yoon-Koog;Lee, Sang-Yoon;Kong, Jung-Sik;Min, Dae-Hong
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.401-404
/
2008
Bridges are exposed to very severe environment and experience, as service life increased, elevated traffic load and traffic flow, in addition to natural disasters. In comparing to other road structures, bridges may cause more significant damage, such as human-involved accidents, to the society in the event of collapse. A certain level of service shall be necessarily secured to assure the minimum safety of users. The cost for manage and preserve bridges will increase gradually and more restrictions will be loaded to efficiently distribute the limited resources, such as monetary budget and human resource etc. In order to enhance performance and serviceability of bridges with the limited resource, asset management technique has been applied into the bridge management system, which capitalizes the road infrastructures including bridges and assess them in accordance with the government finance report. In the application of asset management, there must be a tool for assess the performance of bridges and this study introduces the basic information on the definition and role of performance measures for asset management for bridges.
Journal of Korean Tunnelling and Underground Space Association
/
v.13
no.2
/
pp.133-148
/
2011
Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.
Journal of the Korea Institute of Building Construction
/
v.17
no.4
/
pp.377-384
/
2017
It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.
Algae are an important component of the ecosystem. However, the excessive growth of cyanobacteria has various harmful effects on river environments, and diatoms affect the management of water supply processes. Algal monitoring is essential for sustainable and efficient algae management. In this study, an object detection model was developed that detects and classifies images of four types of harmful cyanobacteria used for the criteria of the algae alert system, and one diatom, Synedra sp.. You Only Look Once(YOLO) v8, the latest version of the YOLO model, was used for the development of the model. The mean average precision (mAP) of the base model was analyzed as 64.4. Five models were created to increase the diversity of the input images used for model training by performing rotation, magnification, and reduction of original images. Changes in model performance were compared according to the composition of the input images. As a result of the analysis, the model that applied rotation, magnification, and reduction showed the best performance with mAP 86.5. The mAP of the model that only used image rotation, combined rotation and magnification, and combined image rotation and reduction were analyzed as 85.3, 82.3, and 83.8, respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.