• Title/Summary/Keyword: 건설공장

Search Result 327, Processing Time 0.031 seconds

Fundamental Properties of Concrete Block and Brick using Casting foundry Fly Ash (주물공장 플라이애쉬를 혼합한 콘크리트 블록 및 벽돌의 기초적 성질)

  • 김희성;진치섭
    • Journal of the Korea Concrete Institute
    • /
    • v.13 no.2
    • /
    • pp.87-92
    • /
    • 2001
  • Until now, disposal of casting foundry fly ash generally depends on reclamation. This is the great loss from a point of view saving of resources and utilizing industrial wastes. Therefore, a study on the use of fly ash as a substitute material for construction is necessary in order to utilize industrial wastes, to reduce cost of production, to improve quality in producing concrete products, and to protect environment from pollution. In this study, concrete products(hollow concrete block and concrete brick) using casting foundry fly ash as a substitute materials for cement, are produced. And experiments are conducted based on Korean Industrial Standards. Finally, the used methods of casting foundry fly ash as a substitute materials in industry are presented.

회원사 동정

  • Korea Electrical Manufacturers Association
    • NEWSLETTER 전기공업
    • /
    • no.93-14 s.87
    • /
    • pp.20-24
    • /
    • 1993
  • PDF

Application Possibility of Folding Pre-fabricated Rebar Cage in Domestic Construction Fields (접이식 철근 선조립 공법의 적용 가능성 검토에 관한 연구)

  • Jung, Young-Chul;Lee, Byung-Yun;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.125-132
    • /
    • 2010
  • Recently, construction companies have had difficulty in managing their business due to economic hardship domestically and abroad, decreased orders, and low profitability due to intensified competition. To address these issues, construction companies need to develop or introduce construction methods that improve productivity. The purpose of this study is to investigate a re-bar construction method that reduces the high expenses of transport by folding a pre-fabricated re-bar cage. It was concluded that the application of rebar pre-fabrication would be activated and the productivity of construction sites improved by adopting the folding rebar pre-fabrication method.

현장탐방 - 이라크 비스마야 신도시 건설 PC플랜트 및 아파트 기계.소방설비공사 윤창기공(주)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.295
    • /
    • pp.57-68
    • /
    • 2015
  • 내전 후 전쟁 상처를 복구 중에 있는 이라크는 주택, 인프라, 사회 서비스망 구축의 필요에 따라 지난 2010년 이라크 기획청(Ministry of Planning, MOP)이 이라크의 삶의 질 개선을 위한 국가개발계획(Iraq National Development Plan, 2010 ~ 2014)을 수립하고 15개 주정부와 쿠르드 자치정부 지역에 100만호 주거 시설 제공을 위한 국가 주택 프로그램을 발표했다. 이에 따라 2017년까지 주택과 교통인프라, 에너지, IT, 의료, 보안 등에 걸쳐 총 2,750억불(약 300조원)을 이라크 재건사업에 투자할 계획이다. 또 2030년까지는 에너지 분야에 5,000억불 투자 등 정유공장, 발전소, 도로, 인프라, 공공시설 및 군시설 등 다양한 분야에 최소 7,000억불에 달하는 예산을 투입할 예정이다. 한화건설은 지난 2012년 80억 달러 규모의 이라크 비스마야 신도시 건설공사를 수주해 우리나라 해외건설 역사상 최대 규모의 프로젝트 기록을 세웠다. 또한 이 계약으로 우리나라 해외건설 누적 수주액 5,000억 달러 돌파에 크게 기여했다. 윤창기공(주)(대표 백종윤)는 비스마야 현장에서 PC 플랜트 현장의 기계설치공사와 하우징 현장의 기계설비 및 소방공사를 담당하고 있다. 본지는 이라크 현장에 있는 윤창기공(주) 정몽준 소장과 김용우 소장을 이메일로 만나 보았다.

  • PDF

Analysis of Productivity Differences in Steel Bridge Manufacturing Plants According to Resource Allocation Methods for the Bottleneck (병목공정 자원할당 방식에 따른 강교 제작공장 생산성 차이 분석)

  • Lee, Jaeil;Jeong, Eunji;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.37-49
    • /
    • 2023
  • In this study, we proposed resource allocation methodologies to improve the productivity of steel bridge manufacturing plants based on the constraint theory which is very popular in the area of manufacturing industries. To this end, after defining the painting process as a bottleneck, three resource allocation methodologies were developed: Operation Specific Resource Allocation (OSRA), Product Specific Resource Allocation (PSRA), and General Resource Allocation (GRA). As a result of experiments for performance evaluation using a simulation model of the steel bridge supply chain, GRA showed the best performance in terms of the Number of Work-In-Process (NWIP) and Waiting Time (WT), in particular, as workload itself and its variability were increased, the performance gap with the specific resource allocation became further deepened. On average, GRA reduced NWIP by 36.2% and WT by 34.6% compared to OSRA, and reduced NWIP by 71.0% and WT by 70.4% compared to PSRA. The reduction of NWIP and WT means alleviating the bottleneck of the painting process, which eventually means that the productivity of the steel bridge manufacturing plant has improved.

Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit (모듈러 경제성 확보를 위한 공장생산 프로세스의 다기능공 적용 방안)

  • Kim, Hakcheol;Hwang, Youngkyu;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • The Construction industry is a labor-intensive industry that its labor cost takes up about 30~40% out of the whole construction cost. However, due to a stereotype that on-site work is a 3D job there is a shortage of the labor forces. Modular construction method is to produce modular units in the plant so that workers could work stably. Also, after delivering the module from plant to the site, there will be only installment to be required that shortens construction duration. Even though the modular market is currently expanding based on military facilities in Korea, its best strengths are not demonstrated well which are shortened construction period and low cost. It also causes labor problem of production due to minimum utilization of the modular construction method. Multi-skilled labor means a technician that is able to perform more than two kinds of work with more than two techniques. Multi-skilled labor can proceed smoothly by figuring out the connectivity between the precedent and following operations. Therefore, this research is to apply the concept of Multi-skilled labors, suggest solutions and allocate manpowers efficiently. As a result, it helps to decrease idle manpowers during the operation and the total labor forces can be saved. Low cost is the original strength of the modular which can stand out so the modular market is expected to expand.

A Comparative Analysis of Construction Labor Productivity in OECD Countries (OECD 국가의 건설업 노동생산성 비교 및 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.175-185
    • /
    • 2023
  • Upon analyzing labor productivity in the construction industry across OECD countries, it was found that in 2019, labor productivity per employee in the South Korean construction industry was lower than that of major developed countries when adjusted for purchasing power parity(PPP). Specifically, when benchmarked against other countries at a base of 100, South Korea scored 76.9 in the United States, 88.4 in Japan, and 85.1 in the OECD average. Notably, South Korea ranked 25th in labor productivity per employee in the construction industry among 35 OECD countries in 2019, indicating a low standing. A comparative analysis of the construction market size and labor productivity in the construction industry across OECD countries revealed that larger construction markets did not necessarily correlate with higher labor productivity. To enhance labor productivity in the construction industry, this study proposed the active implementation of smart construction technology at construction sites and the promotion of on-site assembly work using off-site construction(OSC) technology, rather than traditional on-site labor. Moreover, it was recommended that the development of modular construction methods and technologies be expanded. In the future, if off-site production methods and modules are further developed through advanced robotics and factory automation, labor productivity is anticipated to increase due to the restructuring of production methods, such as manufacturing.

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea (BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 -)

  • Kim Duk-Kon;Kwon O-Kyung;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.48-57
    • /
    • 2003
  • BAT Korea's Factory is the one of the major projects that clearly confirms and demonstrates that Construction Management (CM), provided by a Korean CM Company to the foreign clients, enables them to successfully complete projects; with savings in time and reduction in cost, which it is $15\%$ lower than the cost of the overseas construction. Also, throughout the thorough schedule management, it was possible to commence with manufacturing one month after the completion date. The Key Success Factors was generated by the excellent construction management skills, and more importantly by the confidence gained by the client in giving a CM company full authority for the construction management of the project. This study has focus on elements of construction management applied to this project throughout the concept of 'One Stop Shop', including cost managements, contract management and value engineering etc. We hope that this study will provide useful data to enable public clients to take advantages of construction management, in a similar way to. the private clients, who have already implemented CM actively.

  • PDF