Improvement plan going into other countries of domestic construction companies (국내 건설업체의 해외진출 활성화 방안)

  • Park, Hwan-Pyo;Shin, Eun-Young;Lee, Kyo-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.225-234
    • /
    • 2008
  • The engineering competitiveness of domestic construction companies is 70$\sim$80% of advanced countries. And Korean' companies fall behind China and South-East Asia in a competitive price. Recently, there are increased the amount of overseas order received in Korean construction companies. But, there is not enough the supporting policy of government. Therefore, this research compared and analyzed the competitiveness of domestic construction companies throughout benchmarking support system of overseas construction in advanced companies. Such research was obtained through business trip & consultation with related specialists for the difficulties of domestic companies in advancing into overseas market. This research provided governmental plans to advance into overseas market. First, this research provided assurance system and connected plan of ODA(Official Development Assistant) in construction. Second, this research suggested the improvement of overseas marketing survey and overseas construction marketing center. Third, this research provided the support system of bidding information and the training system of professionals.

A Study on Improving Architect Property Insurance for Safety Accidents of Building (건축물 안전사고에 대비한 건축사 손해보험 개선 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.32-40
    • /
    • 2019
  • This study analyzed operating condition and the problems of damage compensation insunace (property insurance) for qualified architect and derived some suggsetions for improvement. The Certified Architects Act requires all building design and construction supervision to buy property insurance. This study proposes following suggestions to solve problems of current architect property insurance. Firstly, we need to increase the insurance purchasing rate of damage compensation insurance for qualified architect. It is necessary to clearly specify the matters concerning the submission of insurance policies by the architects, which is currently carried out by the Minister's official letter, in the form of official announcement. Secondly, proper insured amount should be adjusted. In order to insured substantial compensation capacity, total amount of insurance should be enlarged. Thirdly, the insurance period should be extended to one year after completion of building to allow compensation for accidents due to design negligence. Generally, the design defect can mostly be identified within one year after completion. Fourthly, insurance coverage should be extended. In the long run, it is essential to enlarge the scope of the security not only to property damage but also to human losses. Finally, an accident record sharing system should be established among insurance companies, so that proper insurance premiums or discounts can be made based on the system.

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

A Case Analysis of the Economic Impact on Accidents during Excavation (터파기 공사 사고의 경제적 영향 사례분석)

  • Go, Kwang-Ro;Lee, Ghang;Choi, Myung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.7-10
    • /
    • 2008
  • As the land price in the downtown area increases, buildings are becoming bigger, deeper and higher. Consequently, the importance of underground construction has increased. Although construction engineers make every effort to complete underground construction without any problem, construction failures like landslides and the collapse of a retaining wall occur because of the uncertainty of the soil conditions as well as the unexpected risks of excavation work. In order to prevent potential excavation accidents, it is essential to understand the causes and impacts of such accidents. However, there are only a few examples of construction failures, which show the economic impact on accidents during excavation because of the sensibility of the information. This paper presents two cases of excavation accidents, which were investigated by construction insurance company. The compensation for the accidents paid by the insurance company was compared with the estimated costs calculated based on the estimation method for excavation accidents proposed by our previous study. The comparison results showed that the estimate calculated by our method was much less than the actual compensation because the estimate solely focused on the construction costs whereas the compensation included other external factors.

  • PDF

Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project (플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Ahn, Sung-Jin;Kim, Tae-Hui;Nam, Kyung-Yong;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2019
  • Due to the increasing demand for and complexity of plant construction projects, unpredictable risk factors are on the consequent increase. For that reason, the quantitative risk analysis is being called for, in order for the development of a risk assessment model using risk indicators for the plant construction projects. This study used the claim payout data collected at a global insurance company to reflect the actual financial losses in plant construction projects as dependent variables in the risk assessment model. In terms of independent variables, the geographic information, i. e., landform, and the construction information including test-run, schedule rate, total cost and duration are adopted. In addition, this study suggests that the regression model containing such independent variables that are statistically significant can be applied to as a foundational guideline for the plant construction project risk analysis during the phase of construction and commissioning.

An Improvement Plan of Ex-post Settling up System on the Social Insurance of Construction Project - Focused on the National Pension and National Health Insurance - (건설공사 사회보험료 사후정산제도의 문제점 및 개선방안 - 국민연금 및 국민건강보험을 중심으로 -)

  • Oh, Chi-Don
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.1
    • /
    • pp.29-36
    • /
    • 2019
  • In the past, social insurance premiums, such as national pension and national health insurance, is contained within the costs of construction projects, have been lowered due to price competition of companies participating in the bidding. The government is implementing the "Ex-post settlement system" to improve the problem. Therefore, the purpose of this study is to examine the concept of an Ex-post settlement system and background of its introduction and to identify problems in the management of the system. The problems of the Ex-post settlement system are: 1) avoiding the participation of construction workers, 2) the rigidity of the insurance premium settlement method in construction field, and 3) the cause of direct construction cost reduction. The ways to improve these problems are: 1) excluding social insurance premiums from construction project cost, 2) securing flexibility of the settlement method of insurance premiums in construction field, and 3) expanding the scope of persons eligible to participate in social insurance.

A Basic Study on Quantification Model Development of Human Accidents based on the Insurance Claim Payout of Construction Site (건설공사보험 사례를 활용한 건설현장 인명사고 정량화 모델 개발 기초연구)

  • Ha, Sun-Geun;Kim, Tae-Hui;Kim, Ji-Myong;Jang, Jun-Ho;Son, Ki-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.195-196
    • /
    • 2017
  • The number of human accidents in the construction industry is increasing every year, and it constitute the highest percentage among industry. This means that activities performed to prevent safety accidents in the country are not efficient to reduce the rate of accidents in the construction industry. In order to solve this issue, research has been conducted from various perspectives. But, research regarding to quantification model of human accidents is insufficient. the objective of this study is to conduct a basic study on quantification model development of human accidents. To achieve the objective, first, Cause of accident is defined the through literature review. Second, a basic statistic analysis is conducted to determine the characteristics of the accident causes. Third, the analysis is conducted after dividing into four categories : accumulate rate, season, total construction cost, and location. In the future, this study can be used as a reference for developing the safety management checklist for safety management in construction site and development of prediction models of human accident.

  • PDF

Estimation of Construction Equipment Expenses - Bulldozer and Loader - (표준품셈의 기계경비 산정 현실화를 위한 자료 조사.분석 -불도우저와 로우더를 중심으로-)

  • Huh, Young-Ki;Kim, Kyung-A;Ahn, Bang-Ryul;Tae, Yong-Ho;Park, Hee-Sung;Kim, Chang-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.155-166
    • /
    • 2008
  • The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

A Study on the Contractor's Liability for the Defects in the Public Construction Works (공공건설사업의 하자에 대한 수급인의 책임에 관한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2002
  • Although Public Construction Works in Korea have been executed according to Government Contract Act, and nature of contract is very complicated. So it is difficult to define liability for the defects. Therefore the studies on the defective performance and contractor's defects liability were remained one of the non-cultivated virgin land. As a result, contract privy waive the right to claim or generally resolve the problems. Therefore domestic and overseas liability for the defects was investigated and liability for the defects, under and after construction, on the defective performance and defects, was analysed. With a literature research, contractor's defect liability was systematically analyzed, problems were defined and resolution of the problem were suggested item by item in this study.

  • PDF

Analysis of Primary Internal and External Risk Factors According to the Accident Causes in Construction Site (건설현장의 사고원인에 따른 내·외부 리스크 핵심 요인 분석)

  • Yu, Yeong-Jin;Kim, Taehui;Son, Kiyoung;Lee, Kyoung-Hun;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.519-527
    • /
    • 2016
  • The demand of construction risk analysis is rapidly increased to improve the competitiveness of construction companies and the sound management of the construction project. However, estimating the amount and uncertainty of the risk is difficult due to the wide range of risks in the construction industry. Moreover, most of the research on risk management of construction risk is only focused on the causes of risk without separate the internal and external risk. This study statistically analysis the internal risk and external risk based on the accidents cases which are caused at construction sites to define the difference and importances of the risk. An accident cause analysis and T-test analysis are carried out to reach the goal of study. The results of the study are expected to be used as a guideline of construction project risk analysis.