A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

건설소식

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.6 s.191
    • /
    • pp.78-81
    • /
    • 2006
  • 300억 이상 공사 최저가 낙찰/ 국민임대주택 11만가구 건설/ 중대재해 발생 즉시 보고해야/ 하도급법 위반 제재 강화/ 아파트 건설공사 쏟아진다/ 표준품셈 상시관레체계 구축/ 미국 플랜트 자격증 국내서 딴다/

  • PDF

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.