• Title/Summary/Keyword: 건물경계

Search Result 174, Processing Time 0.025 seconds

Three Dimensional Building Construction Based on LIDAR Data (LIDAR 자료기반의 3차원 건물정보 구축)

  • Yoo, Hwan-Hee;Kim, Kyung-Whan;Kim, Seong-Sam
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.13-22
    • /
    • 2006
  • Realistic 3D building construction in urban area has become an important issue because of increasing demand of 3D geo-spatial information in many application. Contrary to the conventional 3D building model construction approach using aerial images and high-resolution satellite imagery, it has been researched widely in building reconstruction using high-accuracy aerial LIDAR data in the latest. This paper presents a method for 3D building construction through building outlines extraction by LoG operator's Zero-crossing and line generation and refinement by Douglas-Peucker algorithm.

  • PDF

Building Extraction and Digital Surface Models Generation from Stereo pairs of Aerial Images (입체 항공사진영상을 이용한 DSM생성 및 건물경계추출)

  • 유환희;김성우;성민규
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.16 no.2
    • /
    • pp.177-185
    • /
    • 1998
  • There is an increasing request for 3D data and outlines on building for urban planning and design. This paper describes an approach to extract building using Digital Surface Models(DSM) and stereo pairs of aerial images. DSM contain informations not only about the topographic surface like Digital Elevation Models(DEM), but also about buildings and other objects higher than the surrounding topographic surface, e.g. tees. We therefore describe our approach consisting of two step procedures. The first step of the approach is to generate DSM by stereo matching using Maximum Likelihood Estimation and Dynamic Programming. The proposed stereo matching is using the cost function for finding the disparity between the left and right image, and the Dynamic Programming for solving the stereo matching problem. The second step is to detect building outlines using the DSM and the edge informations extracted from a digital aerial image by Sobel Operator. The overlay analysis of the DSM and the edge information by Sobel Operator was efficient to detect building outlines.

  • PDF

Automated Modification of Irregular Shape of Building Edges Extracted from High Spatial Resolution Satellite Imagery Using Road Direction Information (고해상도 위성영상에서 추출된 건물경계의 도로방향정보 기반 선형보정)

  • Lee Jong-Yeol
    • Proceedings of the KSRS Conference
    • /
    • 2006.03a
    • /
    • pp.173-177
    • /
    • 2006
  • 고해상도의 위성영상이 수집됨에 따라 이에서 지형지물을 자동 추출하려는 분야가 점차 중요해지고 있다. 지형지물을 수작업을 거치지 않고 추출하는 방법의 연구 중에서는 지형지물의 경계추출을 기반으로 하는 방법이 많이 이용된다. 그러나 일반적으로 추출된 지형지물 경계의 선형이 왜곡된 형태를 갖으며, 지형지물의 실제 경계의 형태와는 다소 차이가 있는 결과를 보인다. 이 연구에서는 선형이 굴곡이 있는 지형지물 중 건축물의 경계를 인접한 도로 정보를 이용하여 실제의 경계 형태에 가깝게 보정하는 방법을 검토하였다. context 정보로서 이것을 이용한다면 블록 내의 건축물의 경계를 보다 규칙적으로 정비할 수 있을 것이다. 이 연구에서는 이러한 전제를 가지고 도로로 분할된 블록 내 건축물 경계를 도로의 방향을 기반으로 보정하는 방법을 제안하였다.

  • PDF

Design Guidelines of Elevated Buildings for Antarctic Environment (I)-Wind Load (남극환경을 위한 고상식 건물의 Design Guideline에 관한 연구(I)-풍하중)

  • Kim, D. H.;Kwon, K.C.S.;Rohde H.F.
    • Journal of Ocean Engineering and Technology
    • /
    • v.4 no.2
    • /
    • pp.22-34
    • /
    • 1990
  • 남극환경은 남극의 거센 바람 및 이에 수반되는 적설현상을 피하기 위해 땅에서 띄우는 고상식 및 지하에 설치하는, 두가지의 형태를 취하고 있다. 고상식의 경우 건물밑으로 바람을 통하게 함으로써 적설현상을 피하는데 효과적이기는 하나 남극의 거센 바람에 대응하기 위하여 구조적인 문제를 해결해야 하는 취약점을 지니고 있다. 본 연구는 경계층난류풍하를 이용하여 고상식 남극건물에 가해지는 풍하중을 파악함으로서 남극건물의 design guide line을 제시하였다.

  • PDF

Accuracy on the Edge Detection Using High-Resolution Satellite Image (고해상도 위성 영상을 이용한 경계검출에 대한 정확도 분석)

  • 박운용;문두열;홍순헌;윤경철
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.529-534
    • /
    • 2004
  • 고해상도 위성영상을 이용하여 수치지도를 제작함에 있어 가장 큰 문제점은 레스터 자료인 위성영상에서 경계검출을 통해 벡터자료의 형태로 제작하는 어려움이 있다. 본 연구에서는 경계검출을 통하여 위성영상에서 지형의 경계를 검출해내고, 이를 스크린 디지 타이징 기법을 적용하여 벡터라이징 한 후 나타난 결과를 국토지리정보원의 수치지도와 비교하여 정확도를 비교ㆍ평가하였다. 대상 범위는 대전광역시 유성구 가정동 일부지역을 IKONOS로 촬영된 공간해상도 1m의 위성영상을 사용하였다. 위성영상의 전처리는 기하보정과 정사보정을 거친 후 영상강조를 하였고, 여러 가지의 필터링을 적용하여 경계검출을 수행하였다. 경계검출 방법 중에 하나인 Sobel 연산자를 적용한 후 축척 1:5,000 수치지도와의 중첩을 통하여 표준편차(Root Mean Square Error : RMSE)를 산출하여 비교ㆍ분석하였다. 그리고 스크린 디지타이징 기법을 적용하여 추출한 벡터자료를 건물, 도로 및 임야로 분류하여 수치지도와 중첩하여 정확도를 분석하였다. 그 결과 건물과 도로의 경우에는 공공측량 작업규정에서 정하고 있는 축척 1:5,000의 평면위치 허용오차 기준을 만족하고 있지만, 임야의 경우는 축척 1:10,000 이상의 허용오차기준에 만족되고 있음을 알 수 있었다.

  • PDF

DEM Extraction from LiDAR DSM of Urban Area (도시지역 LiDAR DSM으로부터 DEM추출기법 연구)

  • Choi, Yun-Woong;Cho, Gi-Sung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.1 s.31
    • /
    • pp.19-25
    • /
    • 2005
  • Nowadays, it is possible to construct the DEMs of urban area effectively and economically by LiDAR system. But the data from LiDAR system has form of DSM which is included various objects as trees and buildings. So the preprocess is necessary to extract the DEMs from LiDAR DSMs for particular purpose as effects analysis of man-made objects for flood prediction. As this study is for extracting DEM from LiDAR DSM of urban area, we detected the edges of various objects using edge detecting algorithm of image process. And, we tried mean value filtering, median value filtering and minimum value filtering or detected edges instead of interpolation method which is used in the previous study and could be modified the source data. it could minimize the modification of source data, and the extracting process of DEMs from DSMs could be simplified and automated.

  • PDF

Building Detection Using Edge and Color Information of Color Imagery (컬러영상의 경계정보와 색상정보를 활용한 동일건물인식)

  • Park, Choung Hwan;Sohn, Hong Gyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.519-525
    • /
    • 2006
  • The traditional area-based matching or efficient matching methods using epipolar geometry and height restriction of stereo images, which have a confined search space for image matching, have still some disadvantages such as mismatching and timeconsuming, especially in the dense metropolitan city that very high and similar buildings exist. To solve these problems, a new image matching method through building recognition has been presented. This paper described building recognition in color stereo images using edge and color information as a elementary study of new matching scheme. We introduce the modified Hausdorff distance for using edge information, and the modified color indexing with 3-D RGB histogram for using color information. Color information or edge information alone is not enough to find conjugate building pairs. For edge information only, building recognition rate shows 46.5%, for color information only, 7.1%. However, building recognition rate distinctly increase 78.5% when both information are combined.

Study on Method for Measuring Partial Hausdorff Distance between Spatial Objects for Updating GIS OB (GIS DB 갱신을 위한 공간 객체간 Partial Hausdorff Distance 측정 방법 연구)

  • Bang, Yoon-Sik;Huh, Yong;Choi, Jae-Wan;Yu, Ki-Yun
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.06a
    • /
    • pp.419-426
    • /
    • 2008
  • 본 논문에서는, 건설도면의 건물 경계선을 이용하여 기존 지형도의 건물 레이어를 자동 갱신하는 과정에서 건물 객체간 유사를 측정하는 과정에서 Hausdorff 거리 측정 방법을 적용해 보았다. 서로 다른 축척에 의하여 발생하는 형상의 세일도 차이에서 발생하는 오차를 최소화하기 위하여 partial Hausdorff 거리를 적용하였다. 이 때 partial fraction을 정의하기 위한 기준으로 폴리곤 절점, 경계선 길이, 폴리곤 면적을 이용한 세 가지 방법을 적용하였다. 이 기준을 실제 데이터에 적용한 결과, 경계선 기준과 폴리곤 면적 기준 방법이 절점 기준에 비하여 안정적이라는 것과, 적용 기준에 따라 적절한 partial fraction 값을 사용하면 잡음에 의한 영향을 최소화할 수 있다는 것을 확인할 수 있었다.

  • PDF

Efficient Dynamic Analysis of High-rise Buildings Having Belt Walls Connected by a Sky-Bridge (스카이브릿지로 연결된 벨트월이 있는 고층건물의 효율적인 동적해석)

  • Lee, Dong-Guen;Kim, Hyun-Su;Yang, Ah-Ram;Ko, Hyun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.3
    • /
    • pp.231-242
    • /
    • 2009
  • In the design of a sky-bridge, repetitive boundary nonlinear time history analyses are required to accurately predict dynamic behaviors of the connected buildings because the connection systems of a sky-bridge usually have high nonlinearity. If a conventional finite element model for entire high-rise buildings is used for repetitive boundary nonlinear time history analyses, computational efforts could be significant. In this study, an equivalent cantilever model considering the belt-wall effect has been proposed for an efficient dynamic analysis and a performance evaluation of vibration control of high-rise buildings connected by a sky-bridge. To verify the accuracy and efficiency of the proposed equivalent model, boundary nonlinear time history analyses of 49- and 42-story example buildings connected by a sky-bridge have been performed for wind excitation. Based on the analytical results, it has been verified that the proposed equivalent model can provide accurate dynamic responses of building structures connected by a sky-bridge with significantly reduced computational efforts.

A Study on the Decision of the Interface Height in Compartment Fire (건물화재시 경계면 선정에 관한 연구)

  • 허만성
    • Fire Science and Engineering
    • /
    • v.11 no.2
    • /
    • pp.11-17
    • /
    • 1997
  • The objective of this research is to study on the decision of the interface height in a room in case of trashcan, chair, carpet and sofa as a fire starter in a residential room by performing the experimental studies. For the decision of the interface height, the temperatures of various positions in fire room are measured and the averaged temperatures are calculated from these measured temperatures every time and height. The temperatures of all positions in fire room are obtained as the basis of the measured temperatures and the middle point of the highest temperature slope is decided as the interface point. The interface heights were distinct and were around 1[m] maintaining constant state. However, at the time of the maximum temperature, the interface height was lowered to 0.25[m]-0.75[m] from the floor.

  • PDF