• Title/Summary/Keyword: 개략견적

Search Result 14, Processing Time 0.025 seconds

Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network (인공신경망을 적용한 기획단계의 도로건설 공사비 예측 모델)

  • Han, Hyeong Dong;Kim, Jeong Hwan;Yoon, Jung Ho;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.829-837
    • /
    • 2011
  • Construction cost estimation in planning phase which calculates the cost for performing construction tasks is used for various ways. Meanwhile, in the case of road construction, the existing cost estimating method in early phase based on numerical mean value of the past is not accurate to be used. This paper propose neural network model for estimating road construction cost in planning phase to solve the limit of current cost estimating method. The model was designed using past road construction bidding records, and variables of model were optimized through trial and error. The estimation result of the model was compared with regression analysis and government's standard and it was verified that the model is better in accuracy. It is expected that the proposed model will be used for road cost estimation in planning phase.

Characteristics of Modernized Hanok for development Estimate system. (개략견적 기법 개발을 위한 신한옥 특성 분석)

  • Kim, Hyo-Sun;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.124-125
    • /
    • 2013
  • The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.

  • PDF

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.

A Study on Estimating Process of Conceptual Cost based on BIM at the Early Stage of Construction Project (건설 프로젝트 초기단계 BIM기반의 개략공사비 산출 프로세스에 관한 연구)

  • Jun, Yeong-Jin;Park, Do-Young;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.218-221
    • /
    • 2010
  • 발주자는 건설 프로젝트의 주요 의사결정을 초기단계에 내리게 되므로 정확한 예산을 예측하는 것이 중요하다. 그러나 건설 프로젝트의 대형화, 복잡화 그리고 건설산업계의 새로운 패러다임인 BIM(Building Information Modeling)의 등장에도 불구하고, 초기단계에서 정확한 공사비를 예측할 수 있는 표준화된 산출방법이 없어 아직까지도 대부분의 설계사무소에서는 실시설계단계에서 확정된 설계안에 따른 견적을 이용하며 초과된 비용에 대해 통합품질을 저해하는 행위를 통해 조정하고 있다. 초기단계에서 보다 정확한 공사비를 예측하므로써 발주자는 의사결정을 함에 있어 올바른 판단을 내릴 수 있으며, 이 단계에서 발생한 정보를 활용하여 이후 단계에도 유용하게 쓰일 수 있을 것이다. 본 연구에서는 발주자 의사결정 지원시스템 상에서 BIM기반으로 개략공사비를 산출할 수 있는 프로세스를 제안한다.

  • PDF

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

Cost Analysis Study : Development of HVAC&R System Cost Estimation and Prediction Methodology for Office Buildings (사무소 건물의 HVAC&R 시스템 공사비 분석방법 및 예측에 관한 연구)

  • Cho, Jinkyun;Shin, Seungho;Kim, Jonghurn
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.3
    • /
    • pp.115-121
    • /
    • 2014
  • HVAC&R system costs can often be one of the most expensive components, representing approximately 15% of the total construction cost for office buildings. Despite their significant importance, there is a lack of a consistent and homogeneous framework to approximate the estimate research. This research deals with the prediction methodology of HVAC&R system cost with the aim of establishing a common idea for the analysis of the construction cost estimate. Our approach deals with the concept of an HVAC&R set that is composed of subsystems. The matrix combination analysis is examined, and total 960 HVAC&R system cost estimation can be implemented to large scale office buildings.

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF

Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.