• Title/Summary/Keyword: 강재 운송 마그네틱 크레인

Search Result 2, Processing Time 0.018 seconds

A study on Development of Auto Steel-Plate Pile System Using Measurement System (계측시스템을 이용한 자동 강재 적치 관리 시스템 개발에 관한 연구)

  • Yu, Ji-Hun;Kim, Ho-Kyoung;Kim, Rea-Soo;Sin, Hun-Joo
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.424-428
    • /
    • 2008
  • On processing of the shipbuilding, Various steel plates are used as the important material in many fields including the shell plate, a structure, etc. Therefore, the proper steel plate management system like a warehousing, pile, delivery is very important. Presently Operators manage the steel plate by using the software program, but they manage many parts manually, so many problems are generated on the steel plate check, management, and operator safety. In order to solve this problem, we developed Auto Steel-Plate Piling System. Also this system automatically manages and traces the steel-plate from warehousing to delivery.

  • PDF

A Development of an Integrated Inventory Managing System for Steel-Plates (강재 통합 관리 시스템 개발)

  • Lee, Seok Hyun;Yu, Ji Hun;Kim, Hyun Chul;Jang, Seok Min;Lim, Rae Soo;Kim, Ho Kyeong;Heo, Joo Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.2
    • /
    • pp.130-137
    • /
    • 2014
  • As one of the largest shipbuilding company in the world, STX Offshore & Shipbuilding currently developed an inventory managing system for steel-plates, which is applied to their steel stock yard. In a traditional way to manage steel yard, almost every work has been done by manually. The manual steel-plate piling process caused some problems such as process delay due to piling errors and the uncertainty of work plan due to lack of information. To solve these problems, we developed an integrated inventory managing system based on real-time crane tracking system which automatically updates steel-plates' piling status. We built the integrated steel-plate database, developed several programs including steel-plate input program, real-time steel-plate monitoring program and steel-yard management program, and constructed hardware system for tracking magnetic cranes. As a result, a supervisor of steel-yard can manage the inventory of steel-plates efficiently and furthermore plan an efficient piling schedule and crane working schedule.