Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
Journal of the Computational Structural Engineering Institute of Korea
/
v.24
no.4
/
pp.463-469
/
2011
BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.
This study aims to investigate and analyze the plan and structural system of 4 kan(間) by 4 kan(間) square church built in early 20th century. At that time, three kinds of traditional wooden structure church had been built under the circumstances of transitional era : Basilica style such as Ganghwa Anglican Church, 'ㄱ' shaped style such as Keumsan Church and $4{\times}4$ Square style such as Bukok Church and Jacheon Church that are concerned in this study. Traditional plans and structural system were mixed with new religious function and transformed into korean peculiar style. $4{\times}4$ Square style is a residual product in that process. Despite of it, little concerns on it till now. The results of this study are described as follows. 1. The plan of these $4{\times}4$ square churches is divided into three areas : cathedra($1{\times}1$), attendance($4{\times}2$), and intermediation($4{\times}2$). The location of cathedra is commonly the opposition part of main gate and projected out of the building. Attendance area was also divided into two, man and woman, because of keeping a distance with each other. 2. The structural system of these $4{\times}4$ square churches are somewhat different because of their size and roof style. In the case of Bukok church, $4{\times}4$ square fall off $3{\times}3$ and $2{\times}2$ gradually and turn into paljak(八作) roof, which enable us to get in traditional entering methods. On the contrary, Jacheon church use hipped roof but almost alike pyramidal roof, which could make us not to recognize entering in the aspect of gable part.
Journal of Korean Society of Archives and Records Management
/
v.11
no.1
/
pp.273-298
/
2011
The Treaty of Friendship, Commerce and Navigation between the Chosun dynasty and Japan and the United States of America etc. began signing procedures from Feb. 1876. Thus, Busan port became an open port to foreign vessels in 1876. This has resulted in Busan port becoming the greatest port in Korea. This study explored records which were made by the Chosun dynasty and Japan on the opening and development of Busan port. The results are as follows ; According to making treaties between the Chosun dynasty and foreign countries, Chosun dynasty gradually opened a door to the international community. Various institutions were established in and around Busan port by Chosun and Japan. For example, maritime customs, a court of justice, police station by the Chosun side, a Japanese consulate, the Board of Trade for Japan etc by the Japan side. Records made by or related to these institutions and on the development of the Busan port during the open-port period and the Japanese colonial period were preserved at the Kyujanggak Institute for Korean Studies, the National Institute of Korean History, and the Busan Metropolitan Simin Municipal Library.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.925-928
/
2007
As the field report data does not normalize, ordering organization requires different form every time and field reporters make out form as random, data and report to the ordering organization by different medium such as FAX, e-mail, paper document. Therefore, Field reporters must set and make out same information in required pattern. And ordering organization is being responsible for side works of totalizing and processing the reported data. This research suggests the electronic document unification about monthly construction progress report and construction present condition report system. In addition, it suggests electronically processing function that can handle field report business to unifying electronic documents. As using the result of this research, it will improve the work efficiency and simplify in report business.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.129-134
/
2007
In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.892-898
/
2007
This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.
For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.
In this study, the damages and condition of road pavement were analyzed using pavement management system (PMS) for the structural improvement. Problems of road pavement management were issued by in-depth interview with workers in charge of plant, construction and supervision. By surveying advanced road pavement management, the way how to improve road pavement management in Seoul was discussed. In conclusion, it is necessary to take measures against road heavy traffic and heavy rain in summer. It was found that the problem of early damages of road pavement due to uniform layout with analyzing life cycle cost (LCC). According to the results of survey, it was suggested to strength practical training and to control precisely the temperature of pavement in the process of production and construction.
This study covers securing legal systems and institutions regarding the standards for installing fire prevention facilities to prevent fire on wooden architectural heritage. Conflicts among relevant laws were revealed and problems related to fire prevention performance, technical standards, responsibilities, etc. in the process of establishing legal fire prevention equipment and the equipment for self-extinguishing were identified through pondering over current legal systems of fire prevention facilities. To resolve the problems, at least the principle to preserve original shapes of wooden architectural heritage should be secured even though fire prevention facilities are installed and the installation process should be regulated by laws considering features of fire on wooden architectural heritage so that fire prevention performance can be guaranteed. The directions to improve installing system through legalization of design, construction, and audit review institutions and legalization of the technical standards for fire prevention facilities were suggested to guarantee performance when establishing fire prevention facilities for wooden architectural heritage.
Kim, Yongjoo;Kim, Eunyoung;Song, Hwajun;Park, Kyoungyeun
Korean Journal of Construction Engineering and Management
/
v.22
no.6
/
pp.138-146
/
2021
135 Degree standard hook workability crossed in the Reinforced Concrete (RC) Structure is improved and it reinforces in one side 90° hook binding. As a result, we proposed a One-touch Rebar Reinforcing Clip(RCC Device) that demonstrates the same performance as the 135° standard hook. It was developed through the evaluation of construction and economic analysis. As a result of analyzing 13 sites applied from June 2020, As expected, most of the cases were applied to the structural supervision or the point of the construction supervisor as an irresistible measure. therefore, Through field performance analysis, Various methods such as the method that the original contractor first purchases and then provides after contract with the partner company were proposed for the use of efficient and voluntary reinforcing clip. As a result, It is expected that the contribution in the field will be very high in terms of quality and process management through active utilization.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.