• Title/Summary/Keyword: 갈현동

Search Result 4, Processing Time 0.022 seconds

현상설계경기

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.4 s.336
    • /
    • pp.102-112
    • /
    • 1997
  • PDF

회원작품

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.3 s.192
    • /
    • pp.7-26
    • /
    • 1985
  • PDF

회원작품

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.5 s.206
    • /
    • pp.8-28
    • /
    • 1986
  • PDF

A Study on the application of design in field research methods of Land Characteristic Survey for Individual Land Prices (개별공시지가 토지특성조사를 위한 현장조사방법 설계 적용에 관한 연구)

  • Lee, Seong-Kyu;Bae, Sang-Keun;Jung, Dong-Hun
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.2
    • /
    • pp.73-90
    • /
    • 2014
  • The Officially Announced Land Price System has a limit, that is required to be able to reflect changes in land constantly every year, to implement Land Characteristic Survey for calculating land price during a specific period and human resources with limited. The purpose of this study is to apply the 'National Territory Space Usage status Survey' method to survey part of the territorial feature status information inside of selected the target sites, considering the core survey items (land category, the state of land use, altitude difference, standard site inclusion, etc) in the areas surrounding Yeonshinnae Station in which three dongs (Galhyeon-dong, Daejo-dong, Bulgwang-dong) of Eunpyeong-gu, Seoul share borders with. Based on the given budget, the manpower and period was taken into consideration to sort a total of 2,041 lots and conduct surveys on all sites. This study will be able to diagnose the efficient idle human resource utilization and work process construction plan through pilot projects specialized for providing real estate information services in preparation for cases in which national territory information survey projects that provide various business model, as well as major future core projects of the corporation will be carried out.