• Title/Summary/Keyword: 가치공학 업무 프로세스

Search Result 8, Processing Time 0.019 seconds

The Conceptual Model of Web-Based Information System for Value Engineering(WISE) in Construction Projects (건설사업 웹 기반 VE 정보시스템의 개념 모델)

  • Lee Jae-ho;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.167-177
    • /
    • 2005
  • Value Engineering(VE) Workshop executes many tasks with VE team members from various experts of construction field on the basis of VE Job Plan for a short period of time. However, the VE team members are not useful with using VE information until now because it is not systematic in the accumulation and application of VE information. Especially, these problems constitute the obstacles to communication, reliability and quickness of VE information. It also causes an increase of time and cost at VE Workshop. Therefore, the results of this study suggests the conceptual model of Web-Based Information System for VE(WISE) in order to improve the effectiveness of VE Workshop and solve the problem as is stated above.

A Study on the Application Methodology of Set-based Design Approach of Outrigger System based on Lean Process (린 프로세스 기반 아웃리거 시스템의 Set-based Design 적용 방안에 관한 연구)

  • Lee, Seung-Il;Cho, Young-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.50-58
    • /
    • 2011
  • Lean concept is management philosophy that defines a customer's value and eliminates wasteful and impeditive factors. Management philosophy of Lean in the construction industry is referred to as "Lean Construction". Now this concept has expanded to achieve effective productivity during the design phase. Currently the norm of the domestic design process has been Point-based Design(PBD). It involves selecting a single structurally-feasible design option early and then refining that single design as more information becomes available throughout the design process. This single design is then re-worked until a solution is found that is feasible for all parties. On the contrary, Set-based Design(SBD) is based on lean processes to eliminate waste and improve project productivity. It focuses on keeping the design space as open as long as possible, to allow "subdesign" to advance and not labeling them as secondary in importance. Preserving the maximum number of feasible designs as long as possible reduces the likelihood that rework will be necessary and allows all project participants to utilize their unique expertise to make the project successful. This study proposes that the design methodology of minimizing waste and increasing productivity through SBD of AHP, one of the decision making process so as to compare PBD with SBD and tries to find decision making process and then suggest that application methodology through performs case study of SBD process.

A Study on Efficient Workflow Improvement for Underground Facilities BIM Design Education (지하시설물 BIM 설계 교육을 위한 효율적인 업무프로세스 개선 방안에 관한 연구)

  • Jongseo Lee;Il-young Moon
    • Journal of Practical Engineering Education
    • /
    • v.15 no.3
    • /
    • pp.635-640
    • /
    • 2023
  • Creating New Value Through Digital Transformation Across Industries Worldwide: A Focus on Transitioning from CAD to BIM Design in the Construction Sector with the Implementation of Mandatory BIM Design by 2025 by the Ministry of Land, Infrastructure, and Transport in South Korea. Challenges and Proposed Methodology for Enhancing Efficiency in BIM Design in the Civil Engineering Field of Underground Infrastructure, and Nurturing BIM Design Experts.

A Study of Development of Change Process for Configuration Management in Construction Project Management (건설사업관리에서 형상관리에 관한 변경 프로세스 개선에 관한 연구)

  • Ko, Ho-Un;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.81-89
    • /
    • 2009
  • CM(Configuration Management) is a field of management that focuses on establishing and maintaining consistency of a product's performance and its functional and physical attributes with its requirements, design, and operational information throughout its life. Recently upcoming concept of CM, regardless of various definitions, consists of the organization and the process for value creation through project change management, value preservation by Risk, Project Management implementation by Change management. The CM provide a basis for, and a record of, the project's performance in meeting the scope, time, cost. Overseas international companies have already adopted the CM system and enjoyed the benefits arising from such systems. And the CM provides perspectives and insights applicable to all types of projects. This study presents the review on the current systems now in use at jobsites and known to be efficient, and the introduction and application of configuration systems now at big issue. Hereby indicates the connective system consisted of work process, change control and knowledge referring to the methods and actual cases as an effective promotion of CM.

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

Development of Web-Based VE Supporting System for Effective Workshop (효율적인 VE워크숍을 위한 웹기반 VE지원시스템 개발에 대한 기초연구)

  • Lim, Jongkwon;Kim, Sunghun;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.71-78
    • /
    • 2014
  • Value Engineering methodology was introduced about 30years ago and has significant achievement in Korea. However, many of workshop still focus on cost down process and do not spend enough time on function analysis and expert cooperation. As a result, limited range of creative ideas were produced. To improve effectiveness of VE workshop, this study developed web-based value engineering process and system. And this study applied it to real case study to evaluate effectiveness of proposed system. Developed VE system also provides automated FAST diagram function and decision-making supporting tools. The authors found that this developed web-based VE system can significantly help to save cost and improve performance of VE workshop by using the appropriate VE process, and quick cooperation between experts. In addition, this study shows an example of a VE case study that applies the web-based VE system process, which led to a very innovative and effective way to lead workshop.

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.