• Title/Summary/Keyword: 가스터빈-발전기

Search Result 73, Processing Time 0.024 seconds

Characteristic Tests on the Gas Turbine Generator System for Determination and Verification of Model Parameters in a Combined Cycle Power Plant (복합화력발전소 가스터빈 발전기계통 모델정수 도출 및 검증을 위한 특성시험)

  • Kim, Jong Goo;Yoo, Hoseon
    • Plant Journal
    • /
    • v.17 no.4
    • /
    • pp.35-40
    • /
    • 2021
  • In this study, a technical characteristic test was conducted on the gas turbine generator system of Seoincheon Combined cycle no.6 to derive and verify the model constants. As a result of the generator maximum/minimum reactive power limit test, the maximum reactive power limit is 80 MVar and the minimum is -30 MVar. The generator uses the GENROU model, the field time constant (T'do) is 4.077 s, and the inertial constant (H) is 5.461 P.U. Excitation system used ESST4B model to derive and verify model constants by simulating no-load 2% AVR step test, PSS modeling derived from PSS2A model constants, and simulated and compared measurement data measured when PSS off/on Did. The GGOV1 model was used for the governor-turbine, and the numerical stability of the determined governor-turbine model constant was verified by simulating a 10% governor step test through the PSS/E simulation program

전기스크랩

  • Korea Electrical Manufacturers Association
    • 전기산업
    • /
    • v.7 no.2
    • /
    • pp.110-113
    • /
    • 1996
  • PDF

The effect of use of a lst order time delay in the MW control loop in a gas turbine generator and the simulation results (가스터빈 발전기의 자동 출력제어 회로와 출력신호 피이드백 회로의 필터 사용 효과에 관한 연구)

  • 김종안
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.170-175
    • /
    • 1999
  • 본 논문에서는 국내에서 운전 중인 한 가스터빈 출력제어 회로의 구성을 살펴보고 현장에서 취득한 자료를 근거로 하여 가스터빈의 모델과 제어기의 조정, 그리고 MW 신호 피이드백 회로에 필터의 사용효과를 시뮬레이션을 통해 살펴보았다. 전력계통의 주파수가 가스터빈 출력제어계의 시상수에 비해 상당히 빠르게 변하므로 자동 주파수 추종을 할 경우 제어계가 쉽게 불안정해진다. 이 출력제어계의 MW 피이드백 회로의 1차지연 요소를 사용하면 안정성 향상에 좋은 효과가 있으며, 이 지연요소의 시상수를 크게 할수록 안정도는 더 향상되며 Open Loop의 특성을 보이게 된다. 그러나, 주파수 추종운전이 아닌 운전원의 출력 증감발 요구에는 시간지연 없이 응답을 하여야 하므로 적절한 설정을 할 필요가 있다. 가스터빈의 연료제어 계통을 포함한 출력제어계에 순수 시간지연 요소가 없으면 피이드백 회로에 1차지연 요소를 사용하지 않는 것이 더 좋은 출력제어 응답을 나타낸다. 그러나 실제 모들 가스터빈에는 다소 시간지연 요소를 포함하고 있으므로 일반적으로 피이드백 회로에 시간지연 요소를 사용하므로써 안정성을 향상시킬 수 있다.

  • PDF

석탄가스화 복합발전

  • 지평삼
    • 전기의세계
    • /
    • v.41 no.6
    • /
    • pp.12-17
    • /
    • 1992
  • 석탄을 가장 효율적으로 깨끗하게 이용할 수 있는 석탄가스복합발전(IGCC)의 향후 실용화 시기를 전망해 보면 국외에서는 1995년 이후에 상용발전소가 운용될 것으로 예상되며 국내에서도 환경규제가 강화되는 1996년 이후 2005년경에는 석탄가스화복합 발전소를 건설할 수 있을 것으로 판단된다. 석탄가스화 복합발전소의 국내 도입은 전력수요증가 투자재원 및 실용화시기 등을 감안하여 신규에 석탄가스화로를 추가 설치하는 설비개조 방안이 있으며, 가스터빈발전기 설치후 증기터빈발전기와 석탄가스화로등을 적절한 시기에 단계적으로 건설하는 단계적 건설등으로 추진할 수 있다.

  • PDF

A Study on the Response Characteristics of 200MW Gas Turbine Governor System (200MW급 가스터빈 조속기 응답특성에 대한 연구)

  • Han, Young-Bok;Nam, Kang-Hyun;Kim, Sung-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.4
    • /
    • pp.625-632
    • /
    • 2022
  • Gas turbine generators in load-following operation in the domestic power system play a major role in maintaining the rated frequency, but often have poor frequency control. Therefore, after examining the control characteristics of the governor, which is a gas turbine speed control device, and analyzing the failure types, countermeasures were suggested for each case. In addition, it was confirmed through the governor response test that the gas turbine helps in frequency recovery depending on the speed of fuel control, but also acts as a factor impeding stable operation, such as rapid fluctuations in combustion chamber temperature and combustion vibration. Therefore, in order to maintain stable power quality, there was a need for thorough facility management as well as research on the governor control method in which the traditional PID control method and the machine learning algorithm, a core field of the 4th industry, were fused.

Development of a Polytropic Index-Based Reheat Gas Turbine Inlet Temperature Calculation Algorithm (폴리트로픽 지수 기반의 재열 가스터빈 입구온도 산출 알고리즘 개발)

  • Young-Bok Han;Sung-Ho Kim;Byon-Gon Kim
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.3
    • /
    • pp.483-494
    • /
    • 2023
  • Recently, gas turbine generators are widely used for frequency control of power systems. Although the inlet temperature of a gas turbine is a key factor related to the performance and lifespan of the device, the inlet temperature is not measured directly for reasons such as the turbine structure and operating environment. In particular, the inlet temperature of the reheating gas turbine is very important for stable operation management, but field workers are experiencing a lot of difficulties because the manufacturer does not provide information on the calculation formula. Therefore, in this study, we propose a method for estimating the inlet temperature of a gas turbine using a machine learning-based linear regression analysis method based on a polytropic process equation. In addition, by proposing an inlet temperature calculation algorithm through the usefulness analysis and verification of the inlet temperature calculation model obtained through linear regression analysis, it is intended to help to improve the level of reheat gas turbine combustion tuning technology.

The Implementation of Simulator for Control System of Gas Turbine Generator (가스터빈 발전기의 제어시스템 검증을 위한 시뮬레이터 구현)

  • 우주희
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.47-51
    • /
    • 1999
  • 가스터빈 발전소의 제어시스템을 개조할 때, 설계자가 구성한 디지털 제어시스템의 동작특성을 검증하기 위해서는 시뮬레이터를 구축하여 모의실험을 할 필요가 있다. 본 논문에서는 시뮬레이터를 구성하는데 필요한 구조와 실제 시뮬레이션 한 방법 및 결과에 대해서 언급하고자 한다. 이를 위해 실제 발전소에서 운전데이터를 취득하였고, 시뮬레이션 결과 현장과 유사한 결과를 보여줌으로써 시뮬레이터 구성의 타당성 및 필요성을 확인시켜 주었다.

  • PDF