• Title/Summary/Keyword: 가스변압기

Search Result 117, Processing Time 0.025 seconds

Insulation Characteristics and Partial Discharge for the SF6 Gas Insulated Transformer (SF6 가스 절연변압기의 절연특성과 부분방전)

  • 선종호;김우성;김광화;오원근;하영식
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.740-747
    • /
    • 2000
  • This paper describes insulation characteristics and partial discharge for the SF6 gas insulated transformer. The characteristic of gas insulated transformer and the degradation sequence of solid insulation under SF6 gas atmosphere were explained. The model electrode system of the types that the aramid papers were inserted between two sphere electrodes was prepared. The partial discharge tests were carried out to that system and the insulation characteristics were considered.

  • PDF

A Fault Diagnosis of Oil-Filled Power Transformers Using Dissolved Gas Analysis (유중 가스 분석법을 이용한 전력용 유입 변압기의 고장 진단)

  • Yoon, Yong-Han;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.952-954
    • /
    • 1998
  • This paper presents an artificial neural network approach to diagnose and detect faults in oil-filled power transformers based on dissolved gas analysis. The proposed algorithm is used to detect faults with or without cellulose involved. Several neural network topologies have been considered. Good diagnosis accuracy is obtained with the proposed approach.

  • PDF

에스코 국내소식

  • Korean association for escos
    • The Magazine for Energy Service Companies
    • /
    • s.40
    • /
    • pp.78-81
    • /
    • 2006
  • 포스코 에너지절약설비에 3100억 투입/ ESCOs,신재생에너지로 사업분야 확장 서둘러/ 올 하반기 '한국에너지재단' 설립/ 과학기술부 에너지 · 자원 개발로 30만명 고용창출/ 한국건설기술연구원 에너지 손실없는 환기 시스템 개발/ 안산도시개발 국내최초 아파트 지역 냉방 공급/ 산자부 고효율 전등 교체/ 정부 지구온난화 대응 R&D에 2조원 투입/ 지열이용기술연구회 제주서 보글활성화 세미나/ 효성중공업 미 초고압 변압기시장 공략/ 한국가스공사 2011년까지 LNG탱크 120만kl증설/ 에관공 한수원 신재생에너지설비 현장견학 실시/ 기술표준원 수소연료전지 KS규격제정/

  • PDF

Separation of Partial Discharge Signals and Noise (부분방전 신호와 잡음의 분리)

  • 이승환;유치형;정찬수;김재철;이상철;정양웅
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.13 no.1
    • /
    • pp.21-30
    • /
    • 1999
  • The research for retecting of insulating deterioration in transforrrer has been studied from long ago and the analysis rrethod of combustible gas which is included in insulating oil has been used Recently the spreading effect of the accident is larger than before because of high voltage and large capacity, so on-line detecting system is needed and the study for the estimation of partial discharge signals location has begun. This thesis is the study for the sermating noise signal that is the greatest problem in ultrasonic signal measurement which is one of the method of estimation of partial discharge signals location. Because we can measure the number and location of signal, it is rossible to distinguish between the signal of partial discharge and the external noise. Therefore, we can devolop the credibility of detecting of insulating deterioration in transformer.former.

  • PDF

Development on the Computerizing Assessment System Model for the Diagnosis Data of High-Voltage Motors (고압 유도 전동기 절연진단 데이터 관리 전산화 모델 개발)

  • Chae, Ji-Seog;Lee, Eun-Chun;Lee, Jong-Seok;Ham, Dong-Young;Heo, Seon-Gu;Yun, Suk-Jun;Choi, Jang-Young
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1200-1201
    • /
    • 2015
  • 고전압 전력설비 진단은 기기의 열화 상태를 측정하여 이상 사고를 미리 예측하여 방지하는 것을 목적으로 실시한다. 고전압 전력설비의 유지관리 방안은 일정 시간 경과후 보수하는 개념(TBM: Time Based Maintenance) 이후 설비의 상태를 진단하여 유지보수 방안을 결정하는 개념(CBM: Condition Based Maintenance)으로 진보해 감에 따라 전력설비의 상태진단 기술의 중요성은 증대될 전망이다. 고전압 전력설비의 절연진단은 직류시험(절연저항, PI)과 교류시험($tan{\delta}$, PD)이 실시되며 과거 진단 데이터의 추세분석을 통한 정확한 상태진단이 요구되고 있다. 고압 유도 전동기 절연진단 데이터 관리 전산화 모델은 고전압 전력기기(발전기, 변압기, 전동기, 케이블 등)의 절연진단 및 유지보수 이력에 관한 자료들을 저장, 조회 및 검색을 하기 위한 데이터베이스를 구축하고 구축된 데이터를 활용하여 과거 이력조회, 추이분석, 진단 데이터의 분석기법을 통한 전력기기의 상태평가로 합리적인 개 대체 의사결정을 지원한다. 또한, 유입식 변압기의 절연유 가스분석 알고리즘을 전산화 하여 10종 가연성 가스에 따른 Gas Pattern 평가로 고장 원인, 현상 및 조치 등에 대한 출력이 가능한 프로그램의 개발로 고전압 전력설비 진단기술과 IT기술의 융 복합 기술로서 고전압 전력설비의 유지관리 기술을 한 차원 더 진보시킬 것으로 판단된다.

  • PDF

A study of Dielectric Strength of Spacer for Tap Changer in a $SF^6 $ Gas Insulated Transformer ($SF^6 $ 가스변압기의 탭절환기용 스페이서의 절연내력에 관한 연구)

  • Heo, U-Haeng;Ha, Yeong-Sik;Hong, Jeong-Gyun;Kim, Gyu-Tak
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.11
    • /
    • pp.556-562
    • /
    • 2001
  • Spacer is used between main tank and auxiliary tank for on load tap changer in gas insulated power transformer. This paper deals with electrical design of spacer and discusses different analysis method of between 2D FEM(finite element method) and 3D FEM. To design spacer, we modeled structure of two kind of coaxial cylinders of spacer conductors and analysised electric field of spacer at impulse and induced test voltage condition. Spacer has 13 conductors and electric field was changed according to arrangement of conductors. We could find out arrangement of conductors at which electric stress is minimum. And this arrangement was satisfied with actual test conditions.

  • PDF

Gas detection charracteristic of Transformer Oil Gas Detector (변압기 절연유중 가스 검출장치의 가스 감지 특성)

  • Hwang, Kyu-Hyun;Seo, Ho-Joon;Lee, Suck-Woo;Rhie, Dong-Hee
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.323-324
    • /
    • 2005
  • To found out the degradation characteristic of transformer insulation, insulation materials and electrodes are deposited into transformer oil. They used to heated and make flashover. Due to the thermal and electrical stress added to insulation materials, the density of carbon dioxide and hydrogen included in transformer oil was increased. The gas density can measured by using the gas density detection equipment of gas sensor and air circulation method.

  • PDF

A Study of Insulation Design of a Gas Transformer Using Extra Turns.) (여유턴 방식에 의한 가스변압기의 절연 설계에 관한 연구)

  • Heo, Woo-Heng;Ha, Young-Sik;Hong, Jung-Pyo;Kim, Gyu-Tak
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.3
    • /
    • pp.115-121
    • /
    • 2001
  • This paper deals with the electrical insulation design of a gas insulated power transformer based on extra turns method satisfying the impulse test performed in the worst condition. The calculation of electrical strength in insulation structure was done by 2D finite element method. The gas insulated power transformer was manufactured by selecting the optimum arrangement among design results. the validity of the design result is verified by the impulse test of manufactured machine.

  • PDF

A Study on the Development of Digital CT/VD for GIS (가스절연개폐장치(GIS)용 디지털 CT/VD 개발에 관한 연구)

  • Kim, M.S.;Kim, J.B.;Song, W.P.;Kim, D.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11a
    • /
    • pp.22-24
    • /
    • 2002
  • 지금까지 변전소나 개폐소에서 전류, 전압을 계측하는 수단으로서 주로 철심과 권선으로 구성되어진 변류기(CT), 계기용 변압기(PT, PD)가 사용되어져 왔다. 최근, 2차측의 계측기나 보호 Relay의 Digital화가 진전되어, 또한 이것을 Digital Network으로 총합한 Intelligent 변전소의 구축이 검토되어짐에 따라, Digital Network에 대응한 신형 CT, VD가 요구되어지고 있다. 상기와 같은 요구로 인해 당사에서는 CT는 검출부에 Rogowski Coil을 적용하며 그 후단에 적분기를 설치하였으며, VD는 검출부에 중간 전극을 이용해서 분압하는 방식인 Capacitive Voltage Divider를 사용하고 증폭기를 삽입하여, 각각 요구되는 전압 신호를 얻었다. 이러한 신형 CT/VD의 적용으로 종래의 CT/PT가 차지하는 공간이 필요 없게 되어 컴팩트한 GIS의 구조가 가능하게 되어 있다.

  • PDF

A Study on the Application of Bushings Fire Prevent Structure to Prevent Fire Spread of Transformer (변압기의 화재확산 방지를 위한 부싱 방화구조체 적용에 관한 연구)

  • Kim, Do-Hyun;Cho, Nam-Wook;Yoon, Choung-Ho;Park, Pil-Yong;Park, Keun-Sung
    • Fire Science and Engineering
    • /
    • v.31 no.5
    • /
    • pp.53-62
    • /
    • 2017
  • Electric power which is the energy source of economy and industries requires long distance transportation due to regional difference between its production and consumption, and it is supplied through the multi-loop transmission and distribution system. Prior to its actual use, electric power flows through several transformations by voltage transformers in substations depending on the characteristics of each usage, and a transformer has the structure consisting of the main body, winding wire, insulating oil and bushings. A transformer fire that breaks out in substations entails the primary damage that interrupts the power supply to houses and commercial facilities and causes various safety accidents as well as the secondary economic losses. It is considered that causes of such fire include the leak of insulating oil resulting from the destruction of bottom part of bushings, and the chain reaction of fire due to insulating oil that reaches its ignition point within 1 second. The smoke detector and automatic fire extinguishing system are established in order to minimize fire damage, but a difficulty in securing golden time for extinguishing fire due to delay in the operation of detector and release of gas from the extinguishing system has become a problem. Accordingly, this study was carried out according to needs of active mechanism to prevent the spread of fire and block the leak of insulating oil, in accordance with the importance of securing golden time in extinguishing a fire in its early stage. A bushings fireproof structure was developed by applying the high temperature shape retention materials, which are expanded by flame, and mechanical flame cutoff devices. The bushings fireproof structure was installed on the transformer model produced by applying the actual standards of bushings and flange, and the full scale fire test was carried out. It was confirmed that the bushings fireproof structure operated at accurate position and height within 3 seconds from the flame initiation. It is considered that it could block the spread of flame effectively in the event of actual transformer fire.