• Title/Summary/Keyword: 가격 불확실성

Search Result 125, Processing Time 0.027 seconds

Analysis on the Dependence Structure between Energy Price and Economic Uncertainty Using Copula Model (Copula 모형을 이용한 에너지 가격과 경제적 불확실성 사이의 의존관계 분석)

  • Kim, Bu-Kwon;Choi, Ki-Hong;Yoon, Seong-Min
    • Environmental and Resource Economics Review
    • /
    • v.29 no.2
    • /
    • pp.145-170
    • /
    • 2020
  • This study analyzes the dependence structure between energy (crude oil, natural gas, coal) prices and economic (real and financial) uncertainty. Summary of the results of the dependence structure between energy prices and economic uncertainty analysis is as follows. First, the results of model selection show that the BB7 copula model for the pair of crude oil price and economic uncertainty, the Joe copula model for the pair of natural gas price and economic uncertainty, and the Clayton copula model for the pair of coal price and economic uncertainty were chosen. Second, looking at the dependency structure, it showed that the pair of energy (crude oil, natural gas, coal) prices and real market uncertainty show positive dependence. Whereas, the only pair of financial market uncertainty-crude oil price shows positive dependency. In particular, crude oil price was found to have the greatest dependence on economic uncertainty. Third, looking at the results of tail dependency, the pair of real market uncertainty-crude oil price and pair of real market uncertainty-natural gas price have an asymmetric relationship with the upper tail dependency. It can be seen that the only pair of financial market uncertainty-crude oil represents asymmetric relationships with the upper tail dependencies. In other words, combinations with asymmetric relationships have shown strong dependence when negative extreme events occur. On the other hand, tail dependence between economic uncertainty and coal price be not found.

A Genco's Self-Scheduling Under Uncertainties of Electricity Price and Emission Price (전력 가격 및 탄소배출권 가격의 불확실성을 고려한 발전사업자의 셀프스케쥴링)

  • Kim, Wook-Won;Lyu, Jae-Kun;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.598-599
    • /
    • 2011
  • Cap and Trade 제도 하에서 발전사업자는 탄소배출권 가격의 불확실성이라는 새로운 위험에 노출이 된다. 따라서 발전사업자가 전일 셀프스케쥴링을 실시함에 있어 전력 가격의 불확실성 뿐 아니라 탄소배출권 가격의 불확실성 또한 고려할 필요가 있다. 이에 본 논문에서는 전력 가격과 탄소 배출권 가격의 불확실성을 모두 고려한 발전사업자의 전일 셀프스케쥴링 문제를 고려하였다. 탄소배출권 시장의 거래상당 부분이 발전사업자에 의해 이루어지므로 전력 가격과 탄소 배출권 가격의 상관관계를 고려하여 셀프스케쥴링 문제를 정식화 하였다. 셀프스케쥴링의 결과로 나온 발전사업자의 기대수익과 기대수익의 변동성은 발전사업자의 위험회피정도에 따라 달라짐을 확인할 수 있었다.

  • PDF

A Study on the Implementation of Direct Load Control Resource (직접부하제어자원의 활용방안에 대한 연구)

  • Kim, Jin-Ho;Park, Jong-Bae;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.606-608
    • /
    • 2003
  • 경쟁적인 전력시장에서의 전력 가격은 전력에 대한 수요(Demand)와 공급(Supply)에 의한 시장원리에 의해 결정되기 때문에, 매 시각의 전력가격은 정해져 있지 않고 시장에 의해 결정된다. 이와 같이 전력가격이 가지는 가변성 및 불확실성(Volatility) 때문에 향후 전력 시장에 참여하는 사업자의 수입(Revenue) 및 수익 규모의 불확실성이 커지는 한편, 전력을 사용하는 소비자의 에너지비용도 그 불확실성이 매우 크게 증가하게 마련이다. 이러한 전력가격의 가변성(Volatility)과 불확실성(Uncertainty)이 대두됨에 따라, 외국의 경우, 가정용 부하와 같은 소규모 전력소비자를 제외한 대부분의 대규모 소비자(산업용, 상업용, 일반용 전력소비자)들은 전력가격이나 자신이 사용하고 있는 전력의 소비패턴과 같은 정보(Information)와 전략(Strategy)이 없는 경우, 예전에 비해 상당히 높은 전기요금을 지불해야 하는 상황에 처하게 되었다. 본 논문에서는 이러한 경쟁적 환경에서 직접부하제어자원을 활용하여 비용 및 위험을 관리하는 해외사례를 집중적으로 분석하고자 한다.

  • PDF

An Analysis on the Optimal Level of Primary CER Price Regard as Economic Feasibility (경제성을 고려한 CER 적정 발행가격 분석)

  • Lim, Sung Soo;Yang, Seung Ryong
    • Environmental and Resource Economics Review
    • /
    • v.19 no.4
    • /
    • pp.829-852
    • /
    • 2010
  • The investment in Clean Development Mechanism (CDM) projects is increasing rapidly as the first implementation period began in 2008. This paper examines on the optimal level of primary Certified Emission Reduction (CER) price, subsidiary original projects investment cost and expected issues CER per year, using UNFCCC CDM Project Design Document (PDD) data. Real option model is developed to incorporate a case where the investment is irreversible and underlying asset price is uncertainty. This study employs Real option approach which allow the optimal level regard as economic feasibility of CER price has analyzed with NPV (Net Present Value) and Black-Scholes call option(Real option) value. Finally, CER supply curve and price elasticity of supply are estimated.

  • PDF

Robust production and transportation planning for TFT-LCD industry under demand and price uncertainties using scenario model (시나리오 모델을 활용한 수요 및 가격 불확실성이 존재하는 TFT-LCD 산업에서의 robust 생산 및 수송계획)

  • Shin, Hyun-Joon;Ru, Jae-Pil
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.05b
    • /
    • pp.923-927
    • /
    • 2010
  • 본 연구는 가격 및 수요 불확실성하의 강건한 (robust) 생산 및 수송 전략을 수립함으로써 수요 및 가격 불확실성이 존재하는 TFT-LCD 제조업 공급사슬망의 의사결정 문제를 해결하고자 한다. 품질로 구분되는 제품들의 생산, 재고 및 물류에 관한 의사결정을 조정하기 위해, 본 연구에서는 생산용량 제약, 해상/항공 수송 리드타임 및 용량 제약 등의 현실적인 제약조건들 이외에 시나리오 모델을 이용하여 수요 및 가격 불확실성을 함께 반영하는 확률적 혼합정수선형계획법모형들을 개발한다. 또한 이들 모형들의 효율적 솔루션을 위해 제안한 휴리스틱 알고리즘의 성능을 평가하도록 한다.

  • PDF

Study on Optimal Trading Method of REC by Solar Power Generation (태양광 REC 최적 거래 방식에 관한 연구)

  • Nam, Youngsik;Lee, Jaehyung
    • Environmental and Resource Economics Review
    • /
    • v.29 no.1
    • /
    • pp.91-111
    • /
    • 2020
  • While the renewable energy portfolio standard (RPS) is in place to expand the scale of renewable energy generation, the power producer can obtain the renewable energy credit (REC) and use it as an incentive to operate the facility. RECs secured by solar power generation can be traded through spot market or fixed price contracts, and, in the spot market trading, power producers are exposed to the uncertainty of REC spot price. In this study, real option analysis is conducted to analyze the optimal threshold of REC spot price for the conversion of REC trading method by power producer considering the uncertainty of REC spot price. We calculated the optimal threshold of REC spot price that can convert the trading method of REC from spot market to fixed price contract. In conclusion, the spot market trading is a rational trading method when considering the uncertainty of REC price, but the fixed price bidding is a rational trading method when not considering the uncertainty of REC price.

A Real Options Analysis on Fuel Cell Power Plant considering Mean Reverting Process of Electricity Price (전력가격 평균회귀성을 고려한 연료전지 발전의 실물옵션 분석)

  • Park, Hojeong;Nam, Youngsik
    • Environmental and Resource Economics Review
    • /
    • v.27 no.4
    • /
    • pp.613-637
    • /
    • 2018
  • Fuel cell power plant which has advantages as a distributed generation is influenced by high cost of investment and uncertainty of electricity price. This study suggests the model of real options which considers the irreversibility of investment in the fuel cell plant and the uncertainty of electricity price. Most models of real options assume the geometric Brownian motion for convenience, but this study develops the model for the feasibility analysis considering the mean reverting process of electricity price, with the closed form solution on the value of investment option. The result of the empirical analysis considering the data related to the fuel cell generation with the scale of 20MW and the domestic RPS circumstance represents that the investment is feasible without the uncertainty, and is not feasible with the uncertainty. This result implies that the political support as well as the improvement of profit system including revenue and cost are necessary for the activation of the fuel cell power plant.

Structural Model of Electricity Market for Forecasting the Market Price (전력시장가격 예측을 위한 구조적 모델링)

  • Kang Dong Joo;Jung Hae Sung;Hur Jin;Kim Tae Hyun;Moon Young Hwan;Jung Ku Hyung;Kim Bal Ho
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.648-651
    • /
    • 2004
  • 현재 원가반영발전경쟁시장(CBP : Cost Based Pool)에서는 발전사업자의 변동비용에 기초하여 공급곡선을 형성하게 된다. 그래서 공급 곡선에 있어서 는 비교적 불확실성이 덜하다고 할 수 있다. 그러나 양방향입찰시장에서의 가격결정은 발전사업자와 전력구매자의 입찰데이터(bidding data)로 결정되므로 불확실성의 정도가 매우 심해진다. 즉 가격결정에 있어서 입찰데이터는 매우 중요하며 입찰전략에 따라 사업자의 수익이 달라지기 때문이다. 또한 수직통합체제 때와는 달리 설비용량의 증설도 계통의 부하를 충족시키기 위해서가 아니라 각 발전사업자의 수익성을 고려하여 수행된다. 따라서 중장기적으로는 설비용량계획의 불확실성이 존재하고 단기적으로는 각 발전사업자의 수익 극대화를 위한 입찰 전략에 있어서의 불확실성이 존재하게 된다. 이와 같은 상황에서는 과거의 역사적 데이터를 바탕으로 해당시장에서 발전사업자들의 형태를 분석하는 실증적 분석(empirical analysis)이 가장 설득력이 있지만 현재 우리나라의 전력 시장은 CBP 체제이고 TWBP 시장은 열리지도 않았기 때문에 축적된 데이터는 전무하다. 이러한 현실적 여건 때문에 불확실성의 정도는 더욱 심해지고 TWBP 시장에서의 가격을 예측하는 과정에서도 어려움이 더욱 커지게 된다. 따라서 본 연구에서는 가능한 다양한 해외 연구 사례를 참조하여 시장에서의 발전사업자 중장기적(설비), 단기적(입찰전략) 행위를 어떤식으로 모델링하고 시장가격과 어떤 식으로 연결되는지를 분석해보고자 한다.

  • PDF

Robust production and transportation planning for TFT-LCD industry under demand and price uncertainties using scenario model (시나리오 모델을 활용한 수요 및 가격 불확실성이 존재하는 TFT-LCD 산업에서의 Robust 생산 및 수송계획)

  • Shin, Hyun-Joon;Ru, Jae-Pil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3304-3310
    • /
    • 2010
  • This study solves the decision making problems for TFT-LCD manufacturing supply chain with demand and price uncertainties by establishing robust production and distribution strategies. In order to control the decisions regarding production graded by quality, inventory level and distribution, this study develop scenario model based stochastic mixed integer linear programs (SMILPs) that consider demand and price uncertainties as well as realistic constraints such as capacities etc. The performance of the solution obtained from the SMILPs using robust algorithms will be evaluated through various scenarios.

A Quantitative Study of the Effects of a Price Collar in the Korea Emissions Trading System on Emissions and Costs (배출권거래제 가격상하한제가 배출량 및 감축비용에 미치는 영향에 대한 정량적 연구)

  • Bae, Kyungeun;Yoo, Taejoung;Ahn, Young-Hwan
    • Environmental and Resource Economics Review
    • /
    • v.31 no.2
    • /
    • pp.261-290
    • /
    • 2022
  • Although market stabilization measures have been triggered in the K-ETS, carbon price is still under uncertainty. Considering Korea's 2030 enhanced reduction target announced in October 2021, it is crucial to have practical stabilization measures to appropriately deal with price uncertainty. This study examines the quantitative effects of a price collar, which is considered as a means of alleviating price uncertainty, on expected cumulative emissions and abatement costs. There are three main scenarios: carbon tax, emissions trading system, and emissions trading system with a price collar. Monte Carlo simulation was conducted to reflect uncertainty in emission. There are several results as follows: 1) In a price collar, domestic emission target is likely to be achieved with a lower expected abatement cost than other scenarios. In addition, there is a small amount of excess emissions in this research and it would be not critical(0.1% excess than target); 2) Prohibiting banking increases the expected abatement cost. This is because firms can not intertemporally reallocate allowances to match the firm's optimal emissions path; 3) With the adoption of a price collar, government's net revenue can be positive even if the government's purchase volume of emissions allowances is more than sales volume. This is because the government sells them at price ceiling and purchases them at price floor.