• Title/Summary/Keyword: [$^{18}F$]FLT

Search Result 12, Processing Time 0.015 seconds

The Situation and the Tasks of UK Rail Privatization, Focusing on after the Hatfield Accident (영국 철도 민영화의 현황 및 과제 (Hatfield사고 이후의 변화를 중심으로))

  • Lee, Yong-Sang
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.2 s.88
    • /
    • pp.91-100
    • /
    • 2006
  • This paper examines the situation and tasks of UK rail privatization, especially focusing on after the Hatfield rail accident. Earlier research which focused on the UK's Privatization had little knowledge of the explanations for recent changes. Moreover they had difficulty making a direct comparison between national rail and the privatized rail. Therefore we aye left without a good explanation which has a comprehensive perspective. I attempt to show the change in the rail privatization Process and its outcome, focusing on after the Hatfield rail accident. This Paper argues that the UK's vail privatization process has a regulatory framework which is too complicated with overlapping responsibilities that brought about inefficiency, increasing costs and a superficial safety regime. Especially the planning of rail and infrastructure maintenance did not come to play an appropriate role. However after 2000, the government took charge of setting the strategy for railways, and the Office of Rail Regulation covered safety performance and cost. explain that these changes present a good opportunity to solve the problem of passing the buck for poor performance. Through the analysis, I find that the passenger rail network is well-suited to deliver long distance business and commuters and that the subsidy from the government is decreasing. However, performance, for example punctuality and reliability. should be improved. Especially the Hatfield rail accident caused a reduction in the satisfaction of passengers. In future. the problems of rising costs and monopoly franchise system should be addressed.

A Study of Adjustment for Beginning & Ending Points of Climbing Lanes (오르막차로 시.종점 위치의 보정에 관한 연구)

  • 김상윤;오흥운
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.35-44
    • /
    • 2006
  • Acceleration and deceleration curves have been used for design purposes worldwide. The curve in design level has been regarded as an single deterministic curve to be used for design of climb lanes. It should be noted that the curve was originally made using ideal driving truck and that the curve is applied during design based on the assumption of no difference between ideal and real driving conditions. However. observations show that aged vehicles and lazy behavioring drivers nay make lower performance of vehicles than the ideal performance. The present paper provides the results of truck speeds at climbing lanes then probabilistic variation of acceleration and deceleration corves. For these purposes. a study about identification of vehicle makers, and weights for trucks at freeway toll gates and then observation of vehicle-following speed were performed. The 85%ile results obtained were compared with the deterministic performance curves of 180, 200, and 220 Ib/hp. It was identified that the performance of 85%ile results obtained from vehicle-following-speed observations were lower than one from deterministic performance curves. From these results, it may be concluded that at the beginning Point of climbing lanes additional $16.19{\sim}67.94m$ is necessary and that at the end point of climbing lanes $53.12{\sim}103.24m$ of extension is necessary.