Truck platooning, which is a cluster of trucks in support of vehicle-to-vehicle communication and automated longitudinal vehicle control, is a promising method to both operational efficiency and prevent traffic crashes. Although a variety of studies have been conducted to identify the effects of vehicle platooning on traffic stream, we are not aware of any study attempting to identify promising road segments for vehicle platooning. This study aims to develop a methodology for determining the priority of freeway segments that would potentially lead to maximize the effectiveness of truck platooning. Evaluation measures derived in this study includes truck crash rates, the percentage of truck traffic, segment length, and the number of entry and exit points. Weighting values obtained from an analytical hierarchical process (AHP) method were applied to compute the proposed priority score to determine better freeway segment for truck platooning. Results suggested that a 46.9km freeway segment, from Sacheon IC to Sanin JC, was the most promising segment for maximizing the effectiveness of truck platooning. It is expected that the outcome of this study would be effectively used as a fundamental to establish operational strategies for truck platooning.
Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.112-121
/
2014
After IMF bailout crisis in Korea, project financing has been employed as a major funding vehicle for the housing development. In 2008, the recession of housing market due to the global financial crisis had an significant impact on the increasing insolvent site of PF based housing development project, resulting in serious impact to whole economy as a chain effect. In order to resolve this vicious circle of bankruptcy, the major construction companies were urged to take over the insolvent sites and invest to them for normal project exit, and finally play a critical role in normalization of market. Therefore, this study aims to define the core factors for decision making to invest to insolvent site and find out differences among constructors, developers, financial lenders. The results from AHP analysis, the profitability was the most important factor to constructors. Moreover, even though the location merit is little less, through competitive price, we can assure that stable profitability is most important factor to decide to invest in insolvent site. In conclusion, the price is cheap, is highly feasible, if the land secured, major construction company will participate in a PF business investment. These findings were verified by the investment case of major construction company.
One of the most significant tasks of software development project is to know how much it will be the software development cost in the early stage of software development cycle. The software development environment and technology are changing very rapidly. For accuracy, we should apply those to the software cost estimation. And it is important that we select the suitable adjustment factor and the value of a suitable adjustment factor. For that, this paper have applied the method of AHP. And we have also analyzed the sensitivity of the adjustment factor which is influenced by decision metrics. In conclusion, the value of the application type adjustment factor is responded more sensitively to the data complexity and the control complexity than processing complexity. And the value of the language adjustment factor is responded more sensitively to the supplying manpower and the time of the coding than the time of the debugging. In the future, we will research the selection of an additional adjustment factor and a suitable value of the adjustment factor which are influenced by the environment and the technology of the domestic software development. And then, in the language adjustment factor, we will try to calculate the value about the individual programming language.
This study evaluates the importance of negotiation agendas and the possibility of reaching the Korea-China FTA agreement. It assesses the current situation of trade barriers in the audiovisual service sector of China and then examines a survey of practitioners and experts to screen important regulations. The results are as follows: First, considering the national economic situation in Korea and the environment of the Chinese trade barrier, an important agenda is to enable the direct service of online games and to reach a co-production agreement in the audiovisual service sector. Second, an agenda regarding the co-production agreement of an audio-visual service sector has high potential to be realized, followed by agendas regarding online game and music services. In the broadcasting and film service sectors, with their high cultural identity, a mutual cooperative approach is needed. Korea bringing up the agenda regarding online service may allow it to gain a net benefit for the next FATs. To realize a mutual cooperative approach, it is necessary to form a frame of mutual interests and cooperation through a co-production agreement of audio-visual service. If both countries agree to acknowledge co-produced content as each country's contents, both would benefit.
A rapid growth of interregional trade between China and Korea requires new development and expansion of ports. Currently, there is no rail-ferry system between China and Korea, however, a rapid growth of car-ferry industry shows possibilities. Several candidate cities and regions in East part of China and West part of Korea are selected. We identified times in clearance and station-to-station services as major benefits. We compared three transport modes including candidate cities and regions: container ships, car-ferry and rail-ferry. We used AHP (Analytic Hierarchy Process) as an evaluation method to select most competitive rail-ferry routes between two countries. We also used 7-point Likert scales to find out bottlenecks and factors to introduce rail-ferry services as other questionnaires. As a result, Rail Ferry System(RFS) is a little expensive due to wagon loading efficiency in cargo hold of the ship compared to Car Ferry System or Liner Shipping System. But RFS is recommendable in case of Block Train transport between Korea and EU area by may of TCR and TSR comparing Car Ferry System, because it can reduce total transport cost and connecting procedure at border lines of passing countries.
Journal of the Korea institute for structural maintenance and inspection
/
v.23
no.4
/
pp.1-7
/
2019
As a unify operational processes of the safety inspection for major national facilities, it is expected that the efficiency and professionalism of the project will be enhanced. Also it is being emphasized that the importance of visual inspection that initially find physical and functional defects in facilities. In this study, we developed an E-PAD-based condition evaluation system to check the safety of the facility to overcome the problems and limitations of the existing inspection method. This system consists of introduction, work list, visual inspection, defect table and so on. It is possible to download the inspection drawings at the site and input the damage information to the drawings and check the evaluation grade. In order to verify the E-PAD based condition evaluation system, the inspection data of 10 sample bridges were inputted into the system and the evaluation results were compared. As a result, it was confirmed that the safety grade calculated from the system and the existing safety grade are the same. The feasibility analysis of the AHP method also showed that the function increased by 10%, cost by 36%, and value by 30% compared to the existing method. Therefore, it is expected to contribute to systematic data and information analysis system for improvement of facility management.
This study intends to verify the effectiveness of incentive schemes at Busan Port' aimed at promoting transshipment cargo. The current incentive schemes of Busan port intended to increase the T/S cargo volume have been disputed constantly. It is imperative, therefore, to restructure the system in accordance with the planned strategy. In this study, in order to ensure objectivity of the incentive schemes, all the parties (carriers, terminal operators and Port Authority) with a direct interest are answered and analyzed using the AHP methodology. Effectiveness is the top priority in the analysis of beneficiary validity of incentive schemes, when incentives are provided to Global overseas carriers compared with Global national carriers, IntraAsia carriers and Terminal operators. In the analysis of incentive schemes, direct cash support corresponding to the quantity of the T/S cargo had the highest effectiveness compared with exemption of port dues, cost compensation, port infrastructure support and subsidy for the service opening. The study results, therefore, reference the Port Authority when restructuring the schemes. This study has been conducted only focusing on the Busan port; however, the findings may have significant implications for overseas Port Authorities intending to implement incentive systems to promote cargo volumes similar to those at Busan port.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.4D
/
pp.361-368
/
2010
It is general that mostly congested sections of national backbone networks have been improved based on the national network expansion plan. However, in case of intermodal terminals which are origins of logistics, it is still so congested that travel time between origin and destination is long. Therefore, intermodal transportation systems plan of major intermodal terminals for the intermodal connector networks between intermodal terminal and national backbone network or intermodal terminal was established. With the limitation of priority methodology applying to intermodal connector facility under existing methodology, this study suggests an improved priority methodology. This study includes characteristics of terminal on the hierarchical structure and assessment list, but it does not concentrate on the specific terminal type through survey. To avoid a certain concentration, budget constraint for each terminal type was considered ahead of priority. Finally priority methodology was developed with two-step assessment under consideration that specific terminal is not involved in intermodal connector facility project. As a result of calculating weights by survey, effects such as d/c and accessibility fluctuations index through project implementation gain high weight, and degree of region underdevelopment gets next. Although the methodology in this study could not yields the priority by assessment list, it will be useful for setting the direction on policy related to intermodal connector facility projects.
Kim, Jaeyoung;Jung, Dooyup;Jin, Young-Hyun;Kang, Byung-Goo
Informatization Policy
/
v.30
no.4
/
pp.40-61
/
2023
The adoption of smart factories and smart manufacturing as strategies to enhance competitiveness and stimulate growth in the manufacturing sector is vital for a country's future competitiveness and industrial transformation. The government has consistently pursued smart manufacturing innovation policies starting with the Manufacturing Innovation 3.0 strategy in the Ministry of Industry. This study aims to identify policy areas for smart factories and smart manufacturing based on technical standards. Analyzing policy areas at the current stage where the establishment and support of domestic standards aligning with international technical standards are required is crucial. By prioritizing smart manufacturing process areas within the industry, policymakers can make well-informed decisions to advance smart manufacturing without blindly following international standardization in already well-established areas. To achieve this, the study utilizes a hierarchical analysis method including expert interviews and importance-performance analysis for the five major process areas. The findings underscore the importance of proactive participation in standardization for emerging technologies, such as data and security, instead of solely focusing on areas with extensive international standardization. Additionally, policymakers need to consider carbon emissions, energy costs, and global environmental challenges to address international trends in export and digital trade effectively.
As cloud services and deployment models become diverse, there are a growing number of cloud computing selection options. Therefore, financial companies need a methodology to select the appropriated cloud for each financial computing system. This study adopted the Balanced Scorecard (BSC) framework to classify factors for the introduction of cloud computing in financial companies. Using Analytic Hierarchy Process (AHP), the evaluation items are layered into the performance perspective and the cloud consideration factor and a comprehensive decision model is proposed. To verify the proposed research model, a system of financial company is divided into three: account, information, and channel system, and the result of decision making by both financial business experts and technology experts from two financial companies were collected. The result shows that some common factors are important in all systems, but most of the factors considered are very different from system to system. We expect that our methodology contributes to the spread of cloud computing adoption.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.