• Title/Summary/Keyword: (WBS)Work Breakdown Structure

Search Result 96, Processing Time 0.03 seconds

On the Development of Preventive Electrical Safety Plan Using Operation Concept Document (시스템 운용 개념서 활용을 통한 예방적 전기안전 계획서 개발에 관한 연구)

  • Lee, Byoung-Gil;Lee, Jae-Chon;Shin, Heung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.73-81
    • /
    • 2008
  • The current electrical safety plan developed for the national electricity system has been playing an important role in handling a variety of electrical accidents. However, it can be more effective to prevent or reduce those accidents if a preventive electrical safety plan is available. In this paper, an approach to developing the safety plan is described. We first discuss the contents that should be included in the plan. Noting that an effective plan requires the system level consideration of all the factors affecting the safety issues, an operation concept document (OCD) is considered. The OCD can allow us to understand the behavior of the safety system based on the operation environment, the system functions, the performance requirements, all at the system level of the safety system. Thus, the OCD can be useful in developing the safety plan. A detailed description then follows on how the OCD is developed for the electrical safety system under study. Finally, we discuss how the developed OCD can be used in deriving the preventive electrical safety plan.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

Effect Analysis of WBS-Based Technology Research and Analysis Methodology for Defense Technology Planning : With 'A' Missile System (국방기술기획을 위한 WBS 기반 기술 조사·분석 방법론의 효과분석 : 'A' 미사일 무기체계 중심으로)

  • Kim, Mi Seon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.211-217
    • /
    • 2020
  • Technology planning in the defense field aims to develop core technologies in order to develop weapon systems to satisfy the force integration period by researching and analyzing necessary technologies for weapon systems. In the past, core technology development projects were conducted by deriving core technology based on the main required operational capability. But in this case, there is the limitation that technologies which are necessary to develop weapon systems but do not directly affect required operational capability, such as system integration technologies, are not considered. In this paper, we propose a work breakdown structure-based technology research and analysis methodology that prevents vacant technologies by identifying core technologies that must be secured for the development of weapon systems at the component level. With the proposed methodology, it is possible to identify technologies that must be acquired to realize the required operational capability of systems or which must be secured even they do not affect the required operational capability.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

A Study on Weight Estimation and Calculation of the Pipe Rack Structures for FPSO EPC Projects (FPSO Topsides Pipe Rack 견적 중량 추산 방법 연구)

  • Lee, Soo-Ho;Ahn, Hyun-Sik;Kim, Han-sung;Heo, Yoon;Bae, Jae-Ryu;Kim, Ki-Su;Ham, Seung-Ho;Lee, Sung-Min;Roh, Myung-Il
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.5
    • /
    • pp.362-370
    • /
    • 2016
  • The weight estimation and calculation of FPSO topsides is first performed at the bidding stage of projects. At this time, it is difficult to estimate and calculate accurately the weight because most of items of FPSO are not apparently defined. Especially, in the case of the pipe rack module, its portion of the total weight and the range of weight variation are large due to special features of piping and electric equipment in the module. Thus, it is very important to estimate and calculate accurately its weight in the task of the weight estimation and calculation of FPSO topsides. In this study, the past data for the weight of the pipe rack module were collected and analyzed, the WBS (Work Breakdown Structure) for the pipe rack module was constructed, and primary variables and secondary variables for developing a weight estimation and calculation model were selected. That is, after analyzing the past data, the volume was selected as the primary variable and the regression analysis was performed based on the variable. Then, several secondary variables were selected and incorporated into a weight estimation and calculation model. At this time, the weight per discipline was assumed from ratios of the total weight. Finally, the weight of the pipe rack module was estimated and calculated by using the developed model. As a result, the deviation from the model was better than that (-20 % ~ 60 %) of other studies about the weight estimation and calculation of FPSO topsides. Thus, the validity and applicability of the weight estimation and calculation of the pipe rack could be checked.