DOI QR코드

DOI QR Code

An Importance-Performance Gap Analysis for Innovation in Public Transport Financing: Critical Success Factors of Public-Private Partnership in Mass Rapid Transit in Bangkok

  • Yaowapa Chaiittipornwong (International School of Urban Sciences in University of Seoul) ;
  • Jun-Won Seo (International School of Urban Sciences in University of Seoul) ;
  • Hyeon Park (International School of Urban Sciences in University of Seoul)
  • Received : 2024.03.21
  • Accepted : 2024.09.23
  • Published : 2024.04.30

Abstract

This study examines the Critical Success Factors (CSFs) for Mass Rapid Transit (MRT) projects in Bangkok through Public-Private Partnership (PPP) scheme. It measures the relative importance and performance of 22 CSF indicators of PPP for Bangkok's MRT projects and assesses the gap between importance and performance to prioritize the areas for improvement. This study revealed that eight indicators showed lower performance compared to their importance. Based on the gap analysis, the improvement priorities were identified in the following order: sharing information, incorporating technical elements, clarifying the legal framework, stable committee composition, the various finance resources, improved utilization of the PPP act, a transparent procurement process, and tax incentives. The findings of this research offer strategic insights for enhancing guidelines and processes to address the specific challenges in the PPP project, thereby improving the framework and policies necessary for the successful completion of public transportation projects in developing countries.

Keywords

References

  1. Abalo, J., Varela, J., Manzano, V. (2007). Importance values for Importance-Performance Analysis: A formula for spreading out values derived from preference rankings. Journal of Business Research, 60(1), 115-121. https://doi.org/10.1016/j.jbusres.2006.10.009
  2. Akintoye, A., Taylor, C., Fitzgerald, E. (1998). Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5 (1), 9-21. https://doi.org/10.1108/eb021056
  3. Algarni, A.M., Arditi, D., Polat, G. (2007). Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133 (10), 728-735. https://doi.org/10.1061/(asce)0733-9364(2007)133:10(728)
  4. Chou, J.S., Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects. International Journal of Project Management, 33(5), 1136-1150. https://doi.org/10.1016/j.ijproman.2014.12.003
  5. Cui, C., Liu, Y., Hope, A., Wang, J. (2018). Review of studies on the public-private partnerships for infrastructure projects. International Journal of Project Management, 36(5), 773-794. https://doi.org/10.1016/j.ijproman.2018.03.004
  6. Cumming, D. (2007). Government policy towards entrepreneurial finance: Innovation investment funds. Journal of Business Venturing, 22(2), 193-235. https://doi.org/10.1016/j.jbusvent.2005.12.002
  7. Edkins, A.J., Smyth, H.J. (2006). Contractual management in PPP projects: evaluation of legal versus relational contracting for service delivery. Journal of Professional Issues in Engineering Education and Practice, 132 (1), 82-93. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(82)
  8. Gordon, C., Mulley, C., Stevens, N., Daniels, R. (2013). How optimal was the Sydney Metro contract: Comparison with international best practice. Research in Transportation Economics, 39(1), 239-246. https://doi.org/10.1016/j.retrec.2012.06.020
  9. Hensher, D., Gwilliam, K., Burton, M., Smith, N., Van de Velde, D., Fridstrom, L. (2008). The ideal contract roundtable. Research in Transportation Economics, 22(1), 188-194. https://doi.org/10.1016/j.retrec.2008.05.016
  10. Ho, S.P. (2006). Model for financial renegotiation in public-private partnership projects and its policy implications: game theoretic view. Journal of Construction Engineering and Management, 132 (7), 678-688. https://doi.org/10.1061/(asce)0733-9364(2006)132:7(678)
  11. Japan International Cooperation Agency. (2008). MRTA Initial System Project (Blue Line) I-V Field Survey: August 2007-March 2008. Japan International Cooperation Agency.
  12. Kim, E. (2019). Status and Trends of the Construction/Infrastructure Market in Southeast Asia. Korea Association of Construction Engineering & Management News, 2019-9,10, 32-39.
  13. Ko, C.S., Shon, E.Y., Jeong, J.E., Park, H. (2017). A Comparative Analysis on Implementation Methods of Road PPP Project - A case study of Incheon International Airport Expressway Project. Seoul Studies, 18(4). 41-51.
  14. Kulshreshtha, R., Kumar, A., Tripathi, A., Likhi, D.K. (2017). Critical Success Factors in Implementation of Urban Metro System on PPP: A Case Study of Hyderabad Metro. Global Journal of Flexible Systems Management, 18(4), 303-320. https://doi.org/10.1007/s40171-017-0164-6
  15. Lam, K.C., Chow, W.S. (1999). The significance of financial risks in BOT procurement. Building Research and Information, 27 (2), 84-95. https://doi.org/10.1080/096132199369552
  16. Lertsethtakarn, K. (2016). Public-Private Partnership (PPP) in Thailand: A Case Study of the Bangkok Mass Transit System (BTS). Ph. D Thesis, National Institute of Development Administration.
  17. Li, B., Akintoye, A. (2003). An overview of public-private partnership. In Public-Private Partnerships: Managing Risks and Opportunities, 1st ed.; Akintoye, A., Beck, M., Hardcastle, C. Eds.; Blackwell Science Ltd.: London, UK, pp. 1-30. https://doi.org/10.1002/9780470690703.ch1
  18. Lin, S. P., Chan, Y.H., Tsai, M. C. (2009). A transformation function corresponding to IPA and gap analysis. Total Quality Management, 20(8), 829-846. https://doi.org/10.1080/14783360903128272
  19. Martilla, J. A., James, J. C. (1977). Importance-Performance Analysis, Journal of Marketing, 41(1), 77-79. https://doi.org/10.2307/1250495
  20. Mass Rapid Transit Authority of Thailand. (2019). Annual report 2019. Mass Rapid Transit Authority of Thailand.
  21. Natalia, L., Tanzil, N.D., Sari, P.Y. (2021). Critical success factors of public-private partnership from 2000 to 2019: A literature review. Jurnal Perspektif Pembiayaan Dan Pembangunan Daerah, 8(6), 531-540. https://doi.org/10.22437/ppd.v8i6.10742
  22. Navalersuph, N., Charoenngam, C. (2021). Governance of Public-private partnerships in transportation infrastructure projects based on Thailand's experiences. Case Studies on Transport Policy, 9(3), 1211-1218. https://doi.org/10.1016/j.cstp.2021. 06.008
  23. Schwab, K., (2019). The Global Competitiveness Report 2019; World Economic Forum.
  24. Shen, L.Y., Platten, A., Deng, X.P. (2006). Role of public private partnerships to manage risks in public sector projects in Hong Kong. International Journal of Project Management, 24 (7), 587-594. https://doi.org/10.1016/j.ijproman.2006.07.006
  25. Suparat, R. (2015). Mass Rapid Transport Systems Development through Private Sector Involvement: Experience from Thailand. In Proceeding of Asia-Pacific Forum on Public-Private Partnerships for Transport Infrastructure Development, Economic and Social Commission for Asia and the Pacific, Bangkok, Thailand, 21-22 January 2015.
  26. Van de Velde, D., Beck, A., Van Elburg, J., Terschuren, K. H. (2008). Contracting in urban public transport. European Commission.
  27. Wang, MJ., Lo, Y.T. (2022). Strategies for Improving the Utilization of Preventive Care Services: Application of Importance-Performance Gap Analysis Method. International Journal of Environmental Research and Public Health, 2022(19). https://doi.org/10.3390/ijerph192013195
  28. Willoughby, C. (2013). How much can public private partnership really do for urban transport in developing countries. Research in Transportation Economics, 40, 34-55. https://doi.org/10.1016/j.retrec.2012.06.038
  29. Zayed, T.M., Chang, L.M. (2002). Prototype model for build-operate-transfer risk assessment. Journal of Management in Engineering, 18 (1), 7-16. https://doi.org/10.1061/(asce)0742-597x(2002)18:1(7)
  30. Zhang, X.Q. (2004a). Concessionaire selection: methods and criteria. Journal of Construction Engineering and Management, 130 (2), 235-244. https://doi.org/10.1061/(asce)0733-9364(2004)130:2(235)
  31. Zhang, X.Q. (2004b). Improving concessionaire selection protocols in public/private partnered infrastructure projects. Journal of Construction Engineering and Management, 130 (5), 670-679. https://doi.org/10.1061/(asce)0733-9364(2004)130:5(670)
  32. Zhang, X.Q. (2005a). Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131 (1), 3-14. https://doi.org/10.1061/(asce)0733-9364(2005)131:1(3)
  33. Zhang, X.Q. (2005b). Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131 (6), 631-644. https://doi.org/10.1061/(asce)0733-9364(2005)131:6(631)