Methodology to Link the Results of Radiological Characterizations of Decommissioning Nuclear Power Plants

  • 투고 : 2024.05.19
  • 심사 : 2024.07.08
  • 발행 : 2024.09.30

초록

Kori Unit 1, the first commercial nuclear power plant (NPP) in Korea, was permanently shut down in 2017 and was scheduled for decommissioning. Various programs must be planned early in the decommissioning process to safely decommission NPPs. Radiological characterization is a key program in decommissioning and should be a high priority. Radiological characterization involves determining the decommissioning technology to be applied to a nuclear facility by identifying the radiation sources and radioactive contaminants present within the facility and assessing the extent and nature of the radioactive contaminants to be removed from the facility. This study introduces the regulatory requirements, procedures, and implementation methods for radiological characterization and proposes a methodology to link the results of radiological characterizations for each stage. To link radiological characteristics, this study proposes to conduct radiological characterization in the decommissioning phase to verify the results of radiological characterization in the transitional phase of decommissioning NPPs. This enables significantly reducing the scope and content of radiological characterization that must be performed in the decommissioning phase and maintaining the connection with the previous phase.

키워드

과제정보

This work was supported by the Nuclear Safety Research Program through the Korea Foundation Of Nuclear Safety (KoFONS) using the financial resources granted by the Nuclear Safety and Security Commission (NSSC) of the Republic of Korea (No. RS-2021-KN049410).

참고문헌

  1. W. Kwon, Current Status and Challenges of Nuclear Power Plant Decommissioning Project in Korea, Korean Nuclear Industry, 451, 61-66 (2023). 
  2. Chosun University, Safety Assessment for the Decontamination of the Highly Contaminated Areas and Systems by Radioactive Material, Korea Foundation of Nuclear Safety, NSTAR-21RS51-338
  3. S. Kim, T.Y. Kong, W.S. Choi, J. Son, H. Kim, C. Song, K.T. Yang, J.S. Song, and H.G. Kim, "A Methodology to Designate Radiation-controlled Areas in Decommissioning Nuclear Power Plants", Energy Sci. Eng., 11(9), 3204-3214 (2023). 
  4. C. Andrieu, T. Boisserie, Y. Desnoyers, C.O. Dehaye, F. Tardy, S. Thierfeldt, N. Martin, H. Efraimsson, L. Hakansson, A. Larsson, A.A. Dunlop, S. Jarman, P. Orr, and B. Abu-Eid. Radiological Characterisation for Decommissioning of Nuclear Installations, Nuclear Energy Agency of the OECD Report, NEA/RWM/WPDD (2013)2 (2013). 
  5. H. Kim, T. Kong, S. Kim, J. Son, W. Choi, C. Song, and H. Kim, "Analysis of Korean Safety Evaluation Criteria for Dismantling Nuclear Power Plants Using the IAEA Guidance for Safety Assessment", J. Radiat. Ind., 16(3), 191-199 (2022). 
  6. Chosun University, Coupling and Synergies Between Radiological Characterization Before and After the Approval of the Decommissioning Plan and the Establishment of a Database, Korea Foundation of Nuclear Safety, NSTAR-21RS52-220 (2021).
  7. Nuclear Safety and Security Commission, Regulations on Preparation of Decommissioning Plans for Nuclear Power Facilities, etc., NSSC Notice No. 2021-10 (2021). 
  8. Korea Institute of Nuclear Safety, Safety Review Guideline on Final Decommissioning Plan for Decommissioning Approval, KINS/GE-G002 (2020). 
  9. Republic of Korea, Nuclear Safety Act, Act No. 20308 (2024). 
  10. Republic of Korea, Enforcement Rule of the Nuclear Safety Act, Ordinance of the Prime Minister No. 1892 (2023). 
  11. OECD Nuclear Energy Agency, Radiological Characterisation From a Waste and Materials End-State Perspective: Practices and Experience, NEA No. 7373 (2017). 
  12. Korea Hydro and Nuclear Power, The Initial Decommissioning Plan for the Kori Unit. 1 Generating Reactor and Related Facilities (2020). 
  13. C. Song, T. Kong, S. Kim, J. Son, W. Choi, H. Kim, J. Kim, and H. Kim, "Comparison of the DeSa Project and the Preliminary Decommissioning Plan for Shin-Kori Units 5 and 6 in Terms of Graded Approaches", J. Radiat. Ind., 17(2), 143-150 (2023). 
  14. Kepco International Nuclear Graduate School R&DB Foundation. Nuclear Power Plant Decommissioning Waste Management and Radiological Environmental Impact Assessment Regulatory Element Technical Development Final Report, KINGS Report, 1305009-0517-SB120 (2018). 
  15. Republic of Korea, Enforcement Decree of The Nuclear Safety Act, Presidential Decree No. 33913 (2023).