DOI QR코드

DOI QR Code

A Study on Automated Reinforcement Detailing for Reinforced Concrete Structures Using BIM

BIM 기반 철근콘크리트 구조물의 자동 배근 모델 생성

  • Park, U-Yeol (Department of Architectural Engineering, Andong National University) ;
  • Yun, Seok-Heon (Department of Architectural Engineering, GyeongSang National University)
  • 박우열 ;
  • 윤석헌
  • Received : 2024.06.25
  • Accepted : 2024.07.16
  • Published : 2024.08.20

Abstract

Recent advancements in Building Information Modeling(BIM) have significantly impacted the construction industry, driving competitiveness and innovation. However, rebar construction, a critical component influencing project quality and cost, has lagged behind in BIM adoption. Traditional methods relying heavily on 2D drawings for rebar detailing have hindered efficiency and introduced potential errors. This paper presents a novel system designed to automate the detailed modeling of rebar, thereby promoting BIM integration within rebar construction and optimizing construction management processes. The system leverages confirmed structural drawings from the post-structural design phase to automatically generate intricate rebar models for columns and beams. To ensure adherence to domestic structural design standards, the system is developed using C# programming language and the Revit API. By automating rebar modeling, this system aims to minimize human error, reduce labor-intensive tasks, and enhance overall rebar construction efficiency through the effective utilization of generated rebar model data.

최근 건설산업의 경쟁력을 강화하고 스마트화를 추진하기 위한 수단으로서 BIM의 도입이 확대되고 있다. 그러나 품질 및 원가측면에서 중요한 위치를 차지하고 있는 철근공사는 주로 2D 도면 위주로 철근상세도를 작성하는 등 비효율적인 방식으로 공사관리가 이루어지고 있고 BIM의 활용도도 낮은 편이다. 이에 본 논문은 철근공사의 BIM 도입을 촉진하고 공사관리를 효율화하기 위하여 철근 상세 모델을 자동화하는 시스템을 구현하였다. 현실적인 요인을 감안하여 구조설계도면이 완성된 이후의 단계에서 확정된 구조도면의 정보를 바탕으로 기둥과 보 부재의 철근 상세 모델을 자동으로 생성한다. 실무에서의 활용도를 높이기 위하여 Revit API 개발 도구을 기반으로 C# 프로그래밍 언어를 사용하여 국내 구조설계기준에 적합한 철근 상세를 자동으로 생성할 수 있도록 구성하였다. 본 시스템을 활용하면 수작업 오류를 방지할 수 있고 작업시간 또한 상대적으로 단축할 수 있으며, 생성된 철근 모델 정보를 활용하여 철근공사의 효율성을 높일 수 있을 것으로 판단된다.

Keywords

Acknowledgement

This work is supported in 2024 by the Korea Agency for Infrastructure Technology Advancement(KAIA) grant funded by the Ministry of Land, Infrastructure and Transport(Grant RS-2021-KA163269). This paper was also supported by the Shinsung A&E Research Grant, 2023.

References

  1. Jung YC, Lee BY, Kim GH. Application possibility of folding pre-fabricated rebar cage in domestic construction fields. Journal of the Korea Institute of Building Construction. 2010 Apr;10(2):125-32. https://doi.org/10.5345/JKIC.2010.10.2.125
  2. Adebowale OJ, Agumba JN. Applications of augmented reality for construction productivity improvement: a systematic review. Smart and Sustainable Built Environment. 2022 Sep;13(3):479-95. https://doi.org/10.1108/SASBE-06-2022-0128
  3. Kim JH, Hwang CG, Kim JH. A study on the revitalization of BIM in the field of architecture using AHP method. Journal of the Korea Institute of Building Construction. 2022 Oct;22(5):473-83. https://doi.org/10.5345/JKIBC.2022.22.5.473
  4. Korea Institute of Civil Engineering and Building Technology. BIM roadmap and activation strategies for public SOC projects. Sejong (Korea): Ministry of Land, Infrastructure and Transport. 2018 Sep. 50 p. Report No.: KICT 2018-029.
  5. Park, UY, Kim BJ, Jung HO, Yun SH, Jo HH, Gang GI. A study on the improvement of reinforcing bar detailing. Journal of the Korea Institute of Building Construction. 2008 Feb;8(1):83-90. https://doi.org/10.5345/JKIC.2008.8.1.083
  6. Wang D, Hu Y. Research on the intelligent construction of the rebar project based on BIM. Applied Sciences. 2022 May; 12(11):5596. https://doi.org/10.3390/app12115596
  7. Song CH, Kim CK, Lee SE, Choi HC. Establishment of rebar quantity estimation in BIM-based initial design phase. Journal of the Computational Structural Engineering Institute of Korea. 2016 Oct;29(5):447-54. http://dx.doi.org/10.7734/COSEIK.2016.29.5.447
  8. Kim SW, Kim SK, Suh SW, Kim SC. Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar. Korean Journal of Construction Engineering and Management. 2023 Sep;24(5):52-62. https://doi.org/10.6106/KJCEM.2023.24.5.052
  9. Choi HC, Lee Y, Lee SE, Kim CKl. Development of 3-dimensional rebar detail design and placing drawing system. Journal of the Computational Structural Engineering Institute of Korea. 2014 Aug;27(4):289-96. https://doi.org/10.7734/COSEIK.2014.27.4.289
  10. Rachmawati TSN, Widjaja DD, Kim SK. Advancing an automated algorithm for estimating rebar quantities in. Journal of The Korea Institute of Building Construction, 2023 Aug;23(4):497-508. https://doi.org/10.5345/JKIBC.2023.23.4.497
  11. Li S, Shi Y, Hu J, Li S, Li H, Chen A, Xie W. Application of BIM to rebar modeling of a variable section column. Buildings. 2023 May;13(5):1234. https://doi.org/10.3390/buildings13051234
  12. Hong SU, Cho YS, Lee JH, Hong SC. The study on development of automatic reinforcement placing system of columns for RC structures based on parametric technology. Journal of Architectural Institute of Korea. 2011 Jan;27(21):11-8.
  13. Cho YS, Kim M, Hong SC. A study on automatic reinforcement placement system of isolated foundation based on S-BIM. Journal of the Architectural Institute of Korea Structure & Construction. 2013 Nov;29(11):21-8. https://doi.org/10.5659/JAIK_SC.2013.29.11.21
  14. Jang JW, Lee JH, Jang HS, Hong SU, Cho YS. A study on the reinforcing steel detailing methodology with improvement of interoperable system in the structural BIM environment focused on flat plate. Journal of the Architectural Institute of Korea Structure & Construction. 2012 Aug;28(8):3-10. https://doi.org/10.5659/JAIK_SC.2012.28.8.3
  15. Cho YS, Kim, DE, Jin HA, Jang HS. The study on the development of automatic rebar placement system applying selection method of optimum reinforcing bar group on shear wall. Journal of the Korea institute for structural maintenance and inspection. 2015 Jan;19(1):81-9. https://doi.org/10.11112/JKSMI.2015.19.1.081
  16. Lee JC. A study on the effective calculation of rebar QTO in the early design phase through the application of BIM model. Journal of the Architectural Institute of Korea Structure & Construction. 2019 May;35(5):145-52. https://doi.org/10.5659/JAIK_SC.2019.35.5.145
  17. Jung HO, Jo HH, Park UY. A study on the improvement of erection bar detailing in domestic building construction. Journal of the Korea Institute of Building Construction. 2009 Apr;9(2):39-46. https://doi.org/10.5345/JKIC.2009.9.2.039